============================== #fdio-csit: csit weekly 161012 ============================== Meeting started by mackonstan at 14:04:49 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/fdio-csit/2016/fdio-csit.2016-10-12-14.04.log.html . Meeting summary --------------- * Dave Wallace (dwallacelf, 14:05:24) * Agenda bashing (mackonstan, 14:05:38) * Inputs from FD.io projects (mackonstan, 14:05:53) * TLDK (mackonstan, 14:06:54) * Peter - re csit patch for TLDK functional - updates sent over by Ana, addressing review comments (mackonstan, 14:07:41) * dwallacelf - update from TLDK meeting last week - TLDK folks are using google test framework for unit tests, detail to be posted on TLDK project wiki (mackonstan, 14:08:45) * keith burns talking about csit in the context of nsh - but no further details is forthcoming (mackonstan, 14:10:26) * VPP (mackonstan, 14:12:26) * need to summarize to VPP the csit1701 plan (mackonstan, 14:12:47) * ACTION: Maciek - summarize what's done in csit1609, and then summarize proposal for csit1701 across - i) virl-functional, ii) phy-performance, iii) vpp-test. (mackonstan, 14:13:36) * send it to csit-dev, review by ALL csit folks; and then fwd to vpp-dev. (mackonstan, 14:14:18) * FD.io CSIT operational status (mackonstan, 14:14:51) * jobs for 1609 stopped (mackonstan, 14:15:15) * LINK: : https://gerrit.fd.io/r/#/c/3350/ (jgelety, 14:16:56) * virl machines outage yesterday due to garbage accumulated over the LF infra outages - see email thread on csit-dev (mackonstan, 14:19:25) * ACTION: Peter Mikus to summarize work required to prevent this happening in the future (mackonstan, 14:21:37) * Testbeds upgrade to Ubuntu 16.04 (mackonstan, 14:21:58) * Peter Mikus status update - VIRL Image 1.4 (Ubuntu Xenial) is now produced and operational. Simulation is working and nodes are brought up. (mackonstan, 14:22:29) * LINK: irc://barjavel.freenode.net:6697/#infoeter Mikus - Physical TB3 is reinstalled and working properly. The rest of TBs are waiting for successful VIRL run so we can switch. (mackonstan, 14:23:05) * Peter Mikus - Physical TB3 is reinstalled and working properly. The rest of TBs are waiting for successful VIRL run so we can switch. (mackonstan, 14:23:51) * currently blocked by PIP and setuptools not compatible with TrafficScriptExecutor - wip (mackonstan, 14:27:29) * LINK: https://gerrit.fd.io/r/#/c/3290/ (mackonstan, 14:27:36) * Next step after fixing above issues with CSIT code - need to adjust ci-management so VPP jobs will work. (mackonstan, 14:32:10) * Performance tests - csit1701 plan (mackonstan, 14:33:22) * Maciek update - working with dpdk folks on addressing it, next update after dpdk userspace summit next week (mackonstan, 14:36:59) * • Latency - path to further improve accuracy - work with TRex project (mackonstan, 14:37:14) * Maciek update - TRex lead confirmed that improving latency measurement accuracy is possible by using PTP/ieee1588 supprt in xl710 nics. looking for volunteers to help it code in TRex. right now no plan. (mackonstan, 14:40:35) * TLDK update - Anna (mackonstan, 14:41:07) * TLDK functional test cases added - thanks to Peter and Miro for good reviews. (mackonstan, 14:41:34) * DPDK baseline tests - started to work on the plan to integrate into CSIT - l2fwd, l3fwd, maybe testpmd. (mackonstan, 14:45:19) * Functional tests - csit1701 plan (mackonstan, 14:49:07) * new vpp test infra framework - status - framework changes tracked on gerrit (mackonstan, 14:49:34) * LINK: https://gerrit.fd.io/r/#/c/3345/ (mackonstan, 14:49:45) * LINK: https://gerrit.fd.io/r/#/c/3237/ (mackonstan, 14:50:40) * CSIT dev work plan - review, discuss (mackonstan, 14:55:53) * see jira tickets (mackonstan, 14:55:57) * CSIT HC tests (mackonstan, 14:56:57) * CSIT HC tests ready to go production (mackonstan, 14:57:23) * LINK: https://gerrit.fd.io/r/3018 (mackonstan, 14:57:44) Meeting ended at 14:58:47 UTC. People present (lines said) --------------------------- * mackonstan (41) * collabot (4) * jgelety (2) * dwallacelf (1) Generated by `MeetBot`_ 0.1.4