14:02:41 #startmeeting 12-Jul FD.io CSIT Project Meeting 14:02:41 Meeting started Wed Jul 12 14:02:41 2017 UTC. The chair is mackonstan1. Information about MeetBot at http://wiki.debian.org/MeetBot. 14:02:41 Useful Commands: #action #agreed #help #info #idea #link #topic. 14:02:41 The meeting name has been set to '12_jul_fd_io_csit_project_meeting' 14:02:47 #chair 14:02:47 Current chairs: mackonstan1 14:03:02 #info Dave Wallace 14:03:30 #info Ed Kern 14:03:32 #topic Inputs from LF and FD.io projects 14:03:33 #info Peter Mikus 14:03:36 #topic 14:03:36 #info Jan Gelety 14:06:57 #topic operational status 14:08:39 #info vpp project reported: 43 rechecks since last on 6/20 14:08:51 #info unclear if any are due to infra or csit test issues 14:09:38 #info Peter will check if any performance regression based on trending jobs 14:10:07 #topic VIRL ssh timeout issues for tb4-virl1 and tb4-virl2 [FD.io Helpdesk #41921] 14:15:38 #info Ed reporting - running pybot locally on virl controller node on tb4-virl2 => on ubuntu tb-virl2: no critical tests failing, 20 complete suite runs. 14:16:27 #info Ed reporting - this verifies the integrity of the local virl environment itself, excluding IP connectivity with outside. 14:17:40 #info Ed reporting - on ubuntu: some non-critical tests are failiing, as expected. 14:17:54 #info Ed reporting - on centos: some critical tests are failiing, LISP and VM, as expected. 14:22:26 #info Ed reporting - next steps: 1. continue to execute to clean up Centos, 1 or 2 failures. 14:23:02 #info Ed reporting - next steps: 2. put virl control node on vilr1, and run against virl2, to get clean 20 complete suite runs, ubuntu only. 14:24:01 #info Ed reporting - next steps: 3. talk to Vanessa, ask for place to spin manually jenkins slave to run jobs with simulations and tests on tb4-virl1 and tb4-virl2. 14:25:07 #info Tom Herbert 14:27:15 #info Ed reporting - 25 complete runs, and clean for ubuntu. 14:27:39 #topic un-pegging dpdk dev package version from CSIT 14:29:10 #info another patch identified based on failures of updated gerrit patch from Sergio 14:29:13 #link https://gerrit.fd.io/r/#/c/7529/ 14:29:46 #topic rls1707 plan 14:32:52 #info Stateful Security Groups - InTesting - code complete, tests running, 2t2c ip4 path, N aces reflect, 100k flows => VPP crashes. 14:34:45 #info NSH_SFC - functional - 24 tests, 1 failiing. 14:40:10 #info VM vhost use cases - InTesting - tb3 testbed "misbehaving" due to wrong irq loadbalancing. tb1 and tn2 yielding high stdev values for 2t2c tests. 14:42:01 #info DPDK17.05 testpmd - Done - few tests added, i40e fixes in code and configuration. 14:45:18 #info Centos7 VIRL tests - WIP - Tom keeps working on getting the simulations working, getting qemu hangs. using qemu 2.6. 14:49:05 #info LXC memif use cases - InTesting - vpp crashes under load fixed, another patch from Damjan, for fixing spotted cpu stalls. 14:53:31 #info l2fwd-cryptodev baseline - will not make it due to cryptodev library update issues 14:53:56 #topic adding test equipment: Netgate 14:54:44 #info Tom updating - documented the upgrade procedure, will execute upgrade today. 14:55:15 #info next step is to complete the playbooks, topology files, and start onboarding 15:01:25 #topic rls1704 report 15:01:52 #info report is auto-generated, but some sections, notably rls notes are handcrafted 15:02:42 #info Peter and Maciek reviewed the latest status, and identified all work needed for completing generation of rls1707 report 15:03:19 #info Maciek will file jira tickets for all of these, so that folks can grab the items for editing and reviewing, and we can track progress 15:03:58 #info aiming for complete draft version to be generated into master by end of this week 15:04:01 #endmeeting