============================================= #fdio-csit: 28-Mar FD.io CSIT Project Meeting ============================================= Meeting started by mackonstan at 14:02:15 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/fdio-csit/2018/fdio-csit.2018-03-28-14.02.log.html . Meeting summary --------------- * Jan Gelety (jgelety1, 14:02:23) * Samuel Elias (selias, 14:02:26) * Vratko Polak (vrpolak, 14:02:40) * Tibor Frank (tifrank, 14:02:42) * Dave Wallace (dwallacelf, 14:02:55) * Agenda bashing (mackonstan, 14:03:41) * Inputs from LF and FD.io projects (mackonstan, 14:03:53) * DaveW - VPP - API freeze last week, no issues reported (mackonstan, 14:04:48) * VPP RC1 cut next week (mackonstan, 14:07:05) * no HC update (mackonstan, 14:07:10) * TSC - no TSC update (mackonstan, 14:07:18) * LFN CXI Workshop 24,25-Mar at ONS in LA (mackonstan, 14:16:19) * Meeting details, agenda (mackonstan, 14:16:38) * LINK: https://docs.google.com/spreadsheets/d/1enIRDPyAqo2ZgmErge7eOt28LvIWW4hKRH2KkjAIvSI/edit#gid=0 (mackonstan, 14:16:49) * day1 notes etherpad (mackonstan, 14:17:01) * LINK: https://public.etherpad-mozilla.org/p/infra_cicd_day1 (mackonstan, 14:17:11) * day2 notes etherpad (mackonstan, 14:17:20) * LINK: https://public.etherpad-mozilla.org/p/infra_cicd_day2 (mackonstan, 14:17:28) * LINK: https://docs.google.com/presentation/d/1q9XxRkIbTV8N-gC9yaIiYu3qS9CdZP3G62TQyTZvWck/edit?usp=sharing (mackonstan, 14:19:17) * Operational status - Jenkins jobs (mackonstan, 14:20:06) * csit-vpp-perf trending jobs - 12 tests are failiing due to VAT errors and ssh timeouts (mackonstan, 14:26:43) * similar observed on stable/1801 mrr trending jobs that started today (mackonstan, 14:27:32) * no other issues observed or reported (mackonstan, 14:27:44) * rls1801 follow-up (mackonstan, 14:27:55) * 4 issues tracked - 1 resolved (vhost), 1 in progress (ipsec), 2 in review with dpdk team (mackonstan, 14:32:54) * DAve - wants to cut vpp-18.01.2 this week, but happy to wait for 2 weeks to see if any firm conclusions from dpdk review of vpp regressions, and if ipsec scale issue fixed (mackonstan, 14:34:45) * rls1804 plan (mackonstan, 14:35:38) * plan tracked on wiki - pls update the link (mackonstan, 14:42:19) * LINK: https://wiki.fd.io/view/CSIT/csit1804_plan (mackonstan, 14:42:27) * Centos7 VIRL tests blocked by this jira: (mackonstan, 14:42:41) * LINK: https://jira.fd.io/browse/CSIT-1015 (mackonstan, 14:42:49) * DMM extensions discussions - Adarsh (mackonstan, 14:51:08) * LINK: https://gerrit.fd.io/r/#/c/11286/ (mackonstan, 14:51:47) * CSIT framework developments (mackonstan, 14:53:23) * vpp perf trending: https://docs.fd.io/csit/master/trending/ (mackonstan, 14:57:29) * LINK: https://docs.fd.io/csit/master/trending/ (mackonstan, 14:57:32) * job duration analysis (mackonstan, 14:59:05) * LINK: https://docs.google.com/document/d/1SbIwRUYtgmcluKOa47ATojlqTTOPwfP4AUguh7cgGyU/edit?usp=sharing (mackonstan, 14:59:15) * LINK: https://docs.google.com/document/d/1LXPO5LyG7LfZk6synZ-LRD3KjHYzn9VUZgjZIYCCnhM/edit?usp=sharing (mackonstan, 14:59:23) * ACTION: Maciek and Ed K to section the job tasks and corresponding duration (mackonstan, 14:59:59) * FD.io CSIT lab infra updates - XEON Skylake servers (mackonstan, 15:02:00) * need to vote on the lab HLD sent by Maciek 2 weeks ago (mackonstan, 15:02:25) * ARM additions to CSIT labs (mackonstan, 15:03:10) * Ed - arm machines plugged in, enabling ubuntu16.04 build jobs (mackonstan, 15:03:49) * VIRL platform infra (mackonstan, 15:04:18) * tb4-virl3 - in testing for Centos7 (mackonstan, 15:04:51) * FD.io CSIT lab extensions proposal (mackonstan, 15:14:29) * high-level design distributed 2 weeks ago, all csit-dev contributors should review - approval vote on the list on Thu 29-Mar (mackonstan, 15:15:04) * LINK: ttps://lists.fd.io/g/csit-dev/message/2499 (mackonstan, 15:15:14) * once approved, need to produce a low-level design similar to the original FD.io CSIT lab LLD (mackonstan, 15:15:46) * LINK: https://wiki.fd.io/view/CSIT/CSIT_LF_testbed (mackonstan, 15:15:53) * followed by a live review with LF IT team that will be conducting the physical installation (mackonstan, 15:16:16) * ETA for physical installation w/c 16-Apr or 23-Apr, assuming all equipment arrives (mackonstan, 15:16:47) Meeting ended at 15:16:51 UTC. People present (lines said) --------------------------- * mackonstan (54) * collabot` (4) * vrpolak (2) * jgelety1 (1) * dwallacelf (1) * selias (1) * tifrank (1) Generated by `MeetBot`_ 0.1.4