============================================= #fdio-csit: FD.io CSIT project weekly meeting ============================================= Meeting started by mackonstan at 14:01:33 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/fdio-csit/2019/fdio-csit.2019-06-26-14.01.log.html . Meeting summary --------------- * Tibor Frank (tifrank, 14:02:00) * Jan Gelety (jgelety, 14:02:14) * Dave Wallace (dwallacelf, 14:02:14) * Tom Herbert (tfherbert, 14:02:20) * Vratko Polak. (vrpolak, 14:02:55) * Agenda bashing (mackonstan, 14:03:54) * FD.io CSIT lab infrastructure - skipping (mackonstan, 14:04:13) * Juraj Linkeš (jlinkes, 14:04:21) * Maciek: final BOM for LFN FD.io 2019 lab extension provided - will send summary to csit-dev mailer. (mackonstan, 14:05:33) * Inputs from LFN and FD.io projects (mackonstan, 14:06:16) * Dave: added standing agenda item to go over any upcoming VPP API changes (mackonstan, 14:06:37) * Operational status (mackonstan, 14:08:19) * Peter Mikus (pmikus, 14:08:40) * Number of trending jobs keep failing due to FIB API incompatibility after VPP API change (mackonstan, 14:10:47) * Tibor: didn't see any issues since last week, issue went away "silently" (mackonstan, 14:12:49) * Ed: LFN IT team rebooted Jenkins to work around the load/slowness related issue (mackonstan, 14:13:34) * see email from Vanessa re additional loggign and Jenkins maintenance on 02-July (mackonstan, 14:14:08) * Centos CI: Tom reporting - sent email re Nomad execution, waiting for someone (Ed?) to pick up, will resend email (mackonstan, 14:15:07) * Ed: should be easy to resolve (mackonstan, 14:16:39) * VPP code performance (mackonstan, 14:16:40) * Jan: fixing IP FIB API that should solve the incompatibility with VPP after their change (mackonstan, 14:18:39) * LINK: https://gerrit.fd.io/r/c/20278/ (mackonstan, 14:18:42) * Jan: all tests done, ready for merge, need review(s) (mackonstan, 14:19:40) * Releases (mackonstan, 14:20:12) * CSIT-1908 plan (mackonstan, 14:21:58) * LINK: https://wiki.fd.io/view/CSIT/csit1908_plan (mackonstan, 14:22:14) * Developments (mackonstan, 14:23:04) * Framework - VAT to PAPI migration (mackonstan, 14:24:12) * L1 KW refactoring VAT to PAPI - Tibor: all what planned for June is done and merged. Added three more. (mackonstan, 14:25:08) * L1 KW refactoring VAT to PAPI - Jan: finished IPUtil, going back to IPsec, then next SRv6 libraries. (mackonstan, 14:25:46) * Jan: issues with PAPI for scale tests - lots of entries in PAPI history, quick fix is to print just first two lines and last two lines for all scale tests (for MAC, IPv4, IPv6); (mackonstan, 14:30:12) * Jan: separate issue is the actual logging of cmds - several times - need fix. Proposal over email. (mackonstan, 14:34:22) * Vratko: PAPI over remote socket improves PAPI performance, but still not fast enough due to synchronous operation 1k commands/sec (mackonstan, 14:36:02) * Vratko: solution is asynchronous operation, this needs some thinking (mackonstan, 14:36:33) * Vratko: PAPI over remote socket - conflict with msg indeces; doesn't happen w/o remote socket (mackonstan, 14:39:21) * Vratko: suspecting issue/bug in VPP (mackonstan, 14:39:36) * LINK: https://jenkins.fd.io/view/csit/job/csit-vpp-perf-mrr-daily-master-3n-skx/496/ showing info_level logs increased to 1.13G for 227TCs (pmikus, 14:39:38) * Framework -  L1 KWs alignment between dev and perf (mackonstan, 14:40:15) * Peter: progressing well for setup and teardown (mackonstan, 14:40:31) * Peter: some tests working, some more cleanup required (mackonstan, 14:40:45) * VPP-API "Flag Day" - CSIT-VPP gate-keeping (mackonstan, 14:41:19) * Dave: Vratko is refactoring original implementation to adapt to remote socket (mackonstan, 14:42:08) * Alignment of DEV/PERF was split to 3 phases. 1) Teardown -done, 2) Setup phase -done, 3) Configuration -in progress. 3rd part should be final for the ready-to-go solution (pmikus, 14:42:37) * Discussion: how to integrate this into vpp-csit- jobs - new job to be run first and stop other jobs, similar to checkstyle jobs (mackonstan, 14:49:23) * Test environments (mackonstan, 14:49:57) * Performance trending and analytics (mackonstan, 14:50:41) * New tests (mackonstan, 14:50:46) * Vratko: 9000B tests for AVF got added via suite generator change, based on VPP doc change (mackonstan, 14:51:51) * TRex (mackonstan, 14:52:48) * Latency HdrHistogram - code aligned with latest TRex master, but no target rls confirmed yet (mackonstan, 14:53:19) * Swati: joined Cisco recently, part of FD.io release engineering team (mackonstan, 14:54:19) Meeting ended at 14:57:07 UTC. People present (lines said) --------------------------- * mackonstan (45) * collabot` (4) * pmikus (3) * vrpolak (1) * jlinkes (1) * jgelety (1) * dwallacelf (1) * tfherbert (1) * tifrank (1) Generated by `MeetBot`_ 0.1.4