====================================== #fdio-csit: FD.io CSIT project meeting ====================================== Meeting started by mackonstan at 14:03:06 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/fdio-csit/2019/fdio-csit.2019-07-24-14.03.log.html . Meeting summary --------------- * Dave Wallace (dwallacelf, 14:03:16) * Agenda bashing (mackonstan, 14:03:19) * Juraj Linkeš (jlinkes, 14:03:26) * Vratko Polak. (vrpolak, 14:03:29) * Peter Mikus (pmikus, 14:04:16) * FD.io CSIT lab infrastructure (up to 15min) (mackonstan, 14:04:27) * Maciek: new HW should have arrived, at least partially (mackonstan, 14:06:14) * Mohammed: in fact all HW arrived, servers with motherboards, Processors, NICs (mackonstan, 14:06:37) * Mohammed: build servers already racked and installed (mackonstan, 14:07:08) * Mohammed: awaiting low level design for configuration the testbeds (mackonstan, 14:07:30) * Mohammed: 14 x clx-8280, 6 x 6252N (mackonstan, 14:10:41) * Maciek: proposal to use 6252N on SUTs for 2n-clx, for consistency, vs. mixing 6252N and 8280 on SUTs. (mackonstan, 14:16:40) * Vratko: +1 (mackonstan, 14:16:45) * Mohammed: number of questions re Linux and disk partitioning/RAID. Will send email to the list. (mackonstan, 14:22:52) * Mohammed: failed processors, skx, need to confirm RMA procedure. Will send email to Trishan, Maciek, Ray Kinsella. (mackonstan, 14:23:39) * Maciek: will push patch with proposed clx testbed setup to gerrit and announce on csit-dev (mackonstan, 14:24:48) * Inputs from LFN and FD.io projects (mackonstan, 14:24:53) * VPP (mackonstan, 14:25:09) * Dave: vpp v19.01.3 published last Friday. (mackonstan, 14:25:43) * Peter: heard from Jan that csit-1901.3 tests are complete. Report to be generated. (mackonstan, 14:26:19) * Dave: vpp v19.04.2 is to be published by eow. (mackonstan, 14:26:40) * Dave: v19.08 f0 milestone is next Wed 31-Jul (mackonstan, 14:27:07) * The name of the new gating job is: vpp-csit-verify-api-crc-{stream} (vrpolak, 14:30:09) * Dave: vpp call yesterday, discussed and agreed to start running vpp-csit-verify-api-crc*, with voting, job starts on 30-Jul, if false positives handle with manual override (mackonstan, 14:30:35) * HC (mackonstan, 14:31:59) * still open is how to handle orphaned L1 KWs used by HC, as HC tests got now out of sync with VPP master and not running - discussion on the list. (mackonstan, 14:34:08) * Maciek to start thread on csit-dev (mackonstan, 14:34:42) * TSC (mackonstan, 14:35:04) * no updates (mackonstan, 14:35:13) * Operational status (mackonstan, 14:35:24) * trending analytics job is running out of memory, so trending graphs results not displayed (mackonstan, 14:36:37) * Vratko: increased the memory few times but still out of memory, most likely due to excessive data produced by tests due to using PAPI vs. VAT (mackonstan, 14:37:24) * waiting for Tibor to have a proper look, Tibor is back next week (mackonstan, 14:37:39) * API coverage - Vratko: based on verify-api-crc work now have a good view of api's used by csit, but it's early days, once we enable api-crc gating job, this will drive api coverage evaluation (mackonstan, 14:39:46) * VPP code performance (mackonstan, 14:40:17) * need trending analytics to work again to compare and see if any anomalies (mackonstan, 14:40:33) * Releases (mackonstan, 14:40:42) * Dave: working on tcp tests for 1908, some risk due to PTO in the way (mackonstan, 14:42:15) * Dave: refactoring wrk tests (mackonstan, 14:42:35) * Dave: not planning QUIC tests. (mackonstan, 14:42:41) * VAT-to-PAPI: Andrej: issues with LISP but fixed now (issue was with VAT not checking retval, and PAPI does, some refactoring) (mackonstan, 14:43:57) * VAT-to-PAPI: policer wip, tap wip. (mackonstan, 14:47:00) * VAT-to-PAPI: scale tests still running on VAT (mackonstan, 14:47:46) * Arm - Juraj: dev and perf tests, not done yet, but very close, need to clean up images, aiming to have it working in time for 1908. Currently running arm mrr-daily, but failing at the moment, patch wip. (mackonstan, 14:49:31) * Arm - Juraj: device tests, fixing executing image. (mackonstan, 14:50:39) * Arm - Juraj: device tests, only one server right now, looking to add 2nd server. (mackonstan, 14:52:35) * Arm - Juraj: device tests going ahead with 1 server for csit-vpp-verify non-voting jobs for now. Need 2nd server to do the same for vpp-csit-verify (mackonstan, 14:53:11) * evelopments (mackonstan, 14:53:55) * Developments (mackonstan, 14:54:02) * move to Python 3.5 (post PAPI migration): need to start this post pulling the branch for 1908 (mackonstan, 14:55:29) * Dave: VPP is already working on this: Paul, Naveen, Ole. (mackonstan, 14:55:52) * New RF tags proposal - looking for finalize this shortly, but implementation post 1908 (mackonstan, 14:56:53) * L1 KWs alignment between -func/-dev and -perf - Peter: setup, teardown aligned, most tests are too, few test specific Kws in progress, see updated google docs (mackonstan, 14:58:32) * New tests (mackonstan, 14:59:39) * IPsec scale tests - Peter: added 40k and 60k tests, after verifying vpp fix from Neale (mackonstan, 15:00:01) * VXLAN tests on 2-node - Peter: tests running and reviewing the results (mackonstan, 15:00:19) * NFV density - IPsec - Peter: in 3-node setup, also going up to 40k and 60k over multiple containers (mackonstan, 15:01:35) * TRex (mackonstan, 15:02:15) * Vratko: TRex running now with HDRhistogram, will be collecting the data, and in the future will process. (mackonstan, 15:02:46) * LINK: https://drive.google.com/file/d/1wu-ZxrFoiaLFtWdxHrkQO-pzgk6ysa8I/view?usp=sharing (pmikus, 15:03:25) * Maciek on PTO from next week for 2.5 weeks (mackonstan, 15:04:07) Meeting ended at 15:04:11 UTC. People present (lines said) --------------------------- * mackonstan (59) * collabot` (4) * pmikus (2) * vrpolak (2) * dwallacelf (1) * jlinkes (1) Generated by `MeetBot`_ 0.1.4