========================================= #fdio-meeting: FD.io CSIT project meeting ========================================= Meeting started by mackonstan at 15:03:46 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/fdio-meeting/2022/fd_io_csit_project_meeting/fdio-meeting-fd_io_csit_project_meeting.2022-01-26-15.03.log.html . Meeting summary --------------- * Dave Wallace (dwallacelf, 15:04:15) * mackonstan (mackonstan, 15:04:20) * Vratko Polak. (vrpolak, 15:04:22) * Tibor Frank (tifrank, 15:04:30) * Juraj Linkeš (jlinkes, 15:05:24) * Agenda bashing (mackonstan, 15:05:45) * VPP update (mackonstan, 15:05:54) * Andrew, 4 patches for wireguard and coverity fix(es) all going into v22.02 branch (mackonstan, 15:06:48) * TSC (mackonstan, 15:07:17) * see email from Trishan about the TSC election, right now we are in TSC nomination phase (mackonstan, 15:07:39) * Fan Zhang (fan_zhang, 15:07:50) * LINK: https://wiki.fd.io/view/TSC/2022_Chair_election (mackonstan, 15:08:18) * New or (to be) refactored tests (mackonstan, 15:08:56) * Fan, E810 flow "offload" tests - to update tests with new dpdk offload flags - working on it, will require change in dpdk-input node within vpp (mackonstan, 15:11:27) * Fan, E810 flow "offload" tests - perf tests, expecting progress in two weeks (in a year of tiger! ) (mackonstan, 15:12:08) * VPP RC1 hot patch(es) items (mackonstan, 15:12:45) * Maciek, MTU and DPDK v21.11 patches / issues resolved (mackonstan, 15:13:13) * Andrew, no RC1 hot patches (mackonstan, 15:13:34) * Release CSIT-2202 (mackonstan, 15:13:45) * Tibor, finished rc1 tests, all tests passing except: i) l3fwd with jumbo frames, ii) sporadic test failures with usual suspects: AVF multi-core. (mackonstan, 15:15:55) * Fan, happy to help with l3fwd issue. Tibor will send pointer(s) to the RF logs. (mackonstan, 15:16:59) * Tibor, draft report in master with first rc1 data, except dnv and icx (mackonstan, 15:17:32) * Physical Infrastructure (mackonstan, 15:18:07) * Peter, ICX install progressing, working thru the issue (mackonstan, 15:18:58) * Juraj, Ampere Altra build servers got shipped, 2 of them, expected to arrive to the site today (mackonstan, 15:20:14) * Juraj, performance servers shipment is expected mid February (mackonstan, 15:20:42) * Juraj, re build servers, have 64GB RAM, but need more, for a total of 256G is needed, 16 x 16 GB RAM sticks in total (mackonstan, 15:25:07) * Dave, Juraj, will follow up, calculate, with run by TSC tomorrow (mackonstan, 15:25:34) * Juraj, for Ampere Altra perf there is a problem of getting MLX NICs (mackonstan, 15:26:49) * Juraj, Peter, Maciek, work on closing the loop on perf 3n-alt (3 node ampere altra configuration) spec including NICs and cables, and TRex config needed (mackonstan, 15:31:40) * Juraj, Dave, will work on getting ampere altra servers racked next week - guiding vexxhost team thru slack channe;l (mackonstan, 15:34:50) * MLX NICs for TRex servers (mackonstan, 15:35:06) * Maciek, sent an email to csit-dev with proposal (mackonstan, 15:35:23) * LINK: https://lists.fd.io/g/csit-dev/message/4461 (mackonstan, 15:35:26) * Maciek, Peter, check with hanoh / team re trex compatibility with connectx-6 (as it supports >200 Mpps, verified by intel with l3fwd) - this will be for icx build (mackonstan, 15:37:57) * Maciek, working with Trishan and Ed on getting direct request placed on nvidia mellanox. (mackonstan, 15:38:18) * Dave, Vratko, bring it up with Ed and Trishan on TSC calls while Maciek is away on PTO (mackonstan, 15:40:03) * Virtual Infrastructure, CI/CD (mackonstan, 15:40:36) * Dave, observed intermittent problems with vpp merge jobs, error "replication timeout", opened number of tickets, so far not root caused (mackonstan, 15:41:36) * Dave, suspecting AWS related issues … (mackonstan, 15:42:12) * Dave, started ping monitor for this issue, but so far nothing detected through this, will keep monitoring (mackonstan, 15:43:35) * Dave, Vanessa asked for maintenance window, right now pushed it till after CSIT report is published (mackonstan, 15:44:12) * Trending (mackonstan, 15:47:36) * week 04 CSIT breakages (mackonstan, 15:47:48) * LINK: https://lists.fd.io/g/csit-report/topic/csit_breakages_for_week_04/88644667?p=,,,20,0,0,0::recentpostdate/sticky,,,20,2,0,88644667,previd=1643147219143152758,nextid=1642687866654457037&previd=1643147219143152758&nextid=1642687866654457037 (mackonstan, 15:47:51) * VPP-1995 i40e driver issue, vlan stripping for VF not working (mackonstan, 15:49:40) * Maciek, Fan, good news the DPDK team from intel is on it, expecting the team to start working on it after the Chinese NY holiday (mackonstan, 15:50:29) * Maciek, I'm away next week, Dave volunteered to run the CSIT call then. (mackonstan, 15:52:00) Meeting ended at 15:52:15 UTC. People present (lines said) --------------------------- * mackonstan (47) * collab-meetbot` (10) * dwallacelf (1) * vrpolak (1) * tifrank (1) * jlinkes (1) * fan_zhang (1) * dwallacellf (0) * viliamluc (0) Generated by `MeetBot`_ 0.1.4