========================================= #fdio-meeting: FD.io CSIT Project Meeting ========================================= Meeting started by mackonstan at 13:58:58 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/fdio-meeting/2022/fd_io_csit_project_meeting/fdio-meeting-fd_io_csit_project_meeting.2022-06-08-13.58.log.html . Meeting summary --------------- * mackonstan (mackonstan, 13:59:04) * Tibor Frank (tifrank, 14:00:31) * Agenda bashing (mackonstan, 14:03:13) * Inputs from projects - VPP (mackonstan, 14:03:50) * Andrew, one week to rc2 (mackonstan, 14:04:23) * Fan, added a fix to master, cherry picked into stable/2206, Andrew to review/merge (mackonstan, 14:05:08) * Inputs from projects - TSC (mackonstan, 14:05:21) * Inputs from projects - goVPP (mackonstan, 14:05:45) * Maciek on behalf of Dave Wallace, goVPP has now regular project calls, see updated fd.io govpp wiki page for details (mackonstan, 14:06:24) * E810 flow "offload" tests (mackonstan, 14:08:15) * re 36119: Add ipsec policy test suites with flow director or rss accelerated | https://gerrit.fd.io/r/c/csit/+/36119 (mackonstan, 14:09:29) * Fan, tests are failing (mackonstan, 14:09:38) * Fan, need e810 driver and ddp comms package update - Peter and Yulong are working on it (mackonstan, 14:11:11) * Peter, just confirmed that DDP version should be correct (mackonstan, 14:11:25) * Fan, Maciek, for vpp_device tests, patch is in progress, 35743: dpdk: VPP own DPDK flags | https://gerrit.fd.io/r/c/vpp/+/35743 (mackonstan, 14:13:20) * Fan, start email thread to resolve the proposed code and test design issue (mackonstan, 14:16:20) * VPP and CSIT hot items (mackonstan, 14:17:03) * re AMD performance results review, Sivaprasad, AMD team is in the process of setting up internal CSIT lab, will come back with updates (mackonstan, 14:19:28) * Releases - 2206 (mackonstan, 14:19:58) * rc1 testing, Tibor, all testing done, results in draft report in master (mackonstan, 14:20:33) * LINK: https://s3-docs.fd.io/csit/master/report/ (mackonstan, 14:21:05) * Tibor, added testbeds to report 3n-alt (mackonstan, 14:21:23) * Tibor, observed a large difference between PDR and NDR (mackonstan, 14:21:39) * Juraj, is following with Arm team on that issue (mackonstan, 14:22:18) * Tibor, x710 10gbe links are down on 2n-clx, Peter is t/shooting (mackonstan, 14:22:41) * Viliam, another issue known from 2202 csit-1803 all imix cbc failing on 3n-icx (mackonstan, 14:25:04) * Viliam, csit-1827 - all avf crypto 3n-icx and 3n-skx failing for 1518b no traffic, imix excessive traffic loss, already caught in trending but was very sporadic (mackonstan, 14:27:29) * Vratko confirmed it is indeed csit-1827 (mackonstan, 14:28:43) * LINK: https://jira.fd.io/browse/CSIT-1827 (mackonstan, 14:28:50) * Tibor, once rc2 artifacts are available, will be doing 5 iterative runs (mackonstan, 14:29:32) * Physical Infrastructure (mackonstan, 14:34:14) * Maciek, remaining ICX systems are arriving this week (mackonstan, 14:35:04) * Sivaprasad, re new AMD hw, will ask Keesang to join the call and provide update (mackonstan, 14:35:55) * Peter, re SNR onboarding, no progress, missing basic user manual info from Intel (mackonstan, 14:36:21) * Virtual Infrastructure, CI/CD (mackonstan, 14:36:38) * Environment, Framework (mackonstan, 14:36:58) * Trending (mackonstan, 14:37:13) * Peter, vpp-e810 and trex-cx5 link rings are not working, trex is unable to send traffic (mackonstan, 14:38:54) * Vratko, another issue is tcp throughput tests, ticket csit-1830, showed up after trex upgrade (mackonstan, 14:40:28) * Vratko, clearly a trex issue, struggling to find a workaround for small frame sizes (mackonstan, 14:43:57) Meeting ended at 14:45:11 UTC. People present (lines said) --------------------------- * mackonstan (42) * collab-meetbot (8) * tifrank (1) * vrpolak (1) * fan_zhang (0) Generated by `MeetBot`_ 0.1.4