#fdio-meeting: "FD.io CSIT Project Meeting"

Meeting started by mackonstan at 14:58:38 UTC (full logs).

Meeting summary

  1. Agenda bashing (mackonstan, 14:59:22)
    1. Tibor Frank (tifrank, 14:59:38)

  2. VPP update (mackonstan, 15:02:19)
    1. Vratko Polak. (vrpolak, 15:02:43)
    2. Andrew - rls plan for 22.02 will be for the next meeting (mackonstan, 15:02:52)

  3. TSC update (mackonstan, 15:03:03)
    1. Vratko - 2 notes: (mackonstan, 15:03:29)
    2. Vratko - 1. suggestion to use github actions instead of jenkins "to lower the cost" - LFN licensing issue. (mackonstan, 15:04:24)
    3. Vratko - 2. TSC meeting this week cancelled. (mackonstan, 15:05:23)

  4. E810 offload tests (mackonstan, 15:08:35)
    1. dpdk: VPP own DPDK flags | https://gerrit.fd.io/r/c/vpp/+/35743 (mackonstan, 15:09:53)
    2. Kai Vratko - confirmed this patch is no longer needed due to Damjan's vpp re-work patch (mackonstan, 15:10:41)
    3. Kai - to post the link (mackonstan, 15:10:47)
    4. okay to delete from weekly agenda (mackonstan, 15:11:01)

  5. HW accelerator - SPR QAT2.0 (mackonstan, 15:11:16)
    1. Kai - 2n-spr uni-dir ipsec results looking good; 3na-spr and 3nb-spr require attention from Peter, plan for this week. (mackonstan, 15:12:33)

  6. HW accelerator - SNR QAT2.0 (mackonstan, 15:12:44)
    1. Peter - are up and running, should be generating daily trending results. (mackonstan, 15:13:17)
    2. Peter - checked, looks like results are not propagating, need to check. (mackonstan, 15:14:01)

  7. HW accelerator - SPR DSA (mackonstan, 15:14:10)
    1. Kai - now enabled, need to verify the workings of the new DSA tests that utilise new memif-dsa and hoststack-dsa code (mackonstan, 15:20:04)
    2. 39546: Add memif with DMA test suites | https://gerrit.fd.io/r/c/csit/+/39546 (mackonstan, 15:20:29)
    3. 39716: Add hoststack with DMA test suites | https://gerrit.fd.io/r/c/csit/+/39716 (mackonstan, 15:20:38)
    4. Juraj Linkeš (jlinkes, 15:20:58)

  8. HW accelerator - E810 GTPU offload (mackonstan, 15:22:11)
    1. Kai - waiting for feedback from the intel team re results discrepancies (mackonstan, 15:22:43)

  9. CSIT-2310 release (mackonstan, 15:25:45)
    1. Vratko - still working through RCAs - about 10 new issues incl. jumbo (mackonstan, 15:26:06)
    2. Vratko - correction for above line: 10 new issues == failures. (mackonstan, 15:27:33)
    3. Vratko - 2 regressions noted in rls notes, not seen anything else. (mackonstan, 15:27:53)
    4. #topic CSIT-2310 release (mackonstan, 15:28:02)
    5. https://csit.fd.io/cdocs/release_notes/current/vpp_performance/#root-cause-analysis-for-regressions (mackonstan, 15:28:13)

  10. Physical Infrastructure (mackonstan, 15:28:47)
    1. Juraj - asking about the whereabouts of 1n-alt. (mackonstan, 15:30:12)
    2. Maciek - based on the latest i heard from Dave they should have been ordered, and are on 4-5wk lead time. (mackonstan, 15:31:18)
    3. Juraj - asking about the new hw buildout for next calendar year - we discussed this on 1nov per notes links below, LFN budget request has been submitted by Dave week before last (mackonstan, 15:35:54)
    4. https://ircbot.wl.linuxfoundation.org/meetings/fdio-meeting/2023/fd_io_csit_meeting/fdio-meeting-fd_io_csit_meeting.2023-11-01-15.05.html (mackonstan, 15:35:56)

  11. Environment, Framework (mackonstan, 15:36:32)
    1. Vratko - still playing with RSS key patches (mackonstan, 15:36:51)
    2. 39549: interface dpdk avf: introducing setting RSS hash key feature | https://gerrit.fd.io/r/c/vpp/+/39549 (mackonstan, 15:37:39)
    3. Vratko - after last changes from Gabriel it's looking good so +1'ed. (mackonstan, 15:39:24)

  12. Trending and Test Failures (mackonstan, 15:39:46)
    1. Vratko - still need to update wiki, once going through 3n results (mackonstan, 15:40:04)
    2. Kai - was looking for icx-d - can't find them (mackonstan, 15:41:00)
    3. Peter - some issues with build-in NICs negotiating between 10GbE or 25GbE speeds - so that may be affecting results availability (mackonstan, 15:41:50)
    4. Peter - currently no connection from LFN to AWS S3 due to AWS enforced password change process. (mackonstan, 15:47:06)


Meeting ended at 15:47:22 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan (46)
  2. collab-meetbot (9)
  3. jlinkes (1)
  4. vrpolak (1)
  5. tifrank (1)
  6. Kai54 (1)
  7. dwallacelf (0)


Generated by MeetBot 0.1.4.