================================================ #onap-int: integration weekly meeting 09/10/2019 ================================================ Meeting started by Guest30199 at 13:03:45 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/onap-int/2019/onap-int.2019-10-09-13.03.log.html . Meeting summary --------------- * participants (Guest30199, 13:04:18) * Gerard Nugent (Guest30199, 13:04:24) * afenner (Guest30199, 13:04:28) * Raj Gumma (Guest30199, 13:04:33) * Marco (Guest30199, 13:04:35) * Lasse (Guest30199, 13:04:38) * Krzystof (Guest30199, 13:04:57) * Brian (Guest30199, 13:05:14) * Eric Multanen (Guest30199, 13:05:20) * Mariusz (Guest30199, 13:05:25) * Zhulia (Guest30199, 13:05:36) * Zu (Guest30199, 13:05:37) * Morgan (Guest30199, 13:05:40) * action point follow up (Guest30199, 13:06:20) * AP1: Lukasz create a JIRA to see if the bug (policy portal not reachable) is a feature (Guest30199, 13:06:31) * AP2: all upgrade the test status page (Guest30199, 13:06:43) * done (Guest30199, 13:06:47) * AP3: Marco open a JIRA to clamp (Guest30199, 13:07:13) * done, bunch of issues identified by Marco, still some issues are pending (Guest30199, 13:07:32) * AP4: marco sycn with ajay on the status of use case 13 (Guest30199, 13:07:50) * mail exchanged, no update from ajay - Catherine also followed up => status page update planned before the end of the week (Guest30199, 13:08:23) * AP5: brian sync with Catherine on use case 17 (BBS) (Guest30199, 13:08:48) * page to be updated (Guest30199, 13:09:08) * AP6: all review integration Epic list for frankfurt (Guest30199, 13:09:16) * see next section (Guest30199, 13:09:25) * El Alto last miles (Guest30199, 13:10:12) * testing status (Guest30199, 13:10:25) * LINK: https://wiki.onap.org/display/DW/2%3A+El+Alto+Release+Integration+Testing+Status (Guest30199, 13:10:27) * vFW completed (Guest30199, 13:10:44) * vCPE shoudl be OK before the end of the week (Guest30199, 13:11:01) * now most of the tests are PASS/COMPLETED (Guest30199, 13:11:14) * manual scale out => manual scale works (direct call to SO) but without VID (not possible for El Alto => Frankfurt) (Guest30199, 13:12:28) * automated closed-loop based with CDS: need to sync with yuirj possible timing issues (Guest30199, 13:12:58) * on VID issue => maybe some design involved, not a simple config change => move to frankfurt. (Guest30199, 13:15:40) * ACTION: Marco/Brian sync with Itay on the possibility to get a patch release for VID / Scale out (Guest30199, 13:16:00) * clamp workign hard to fix scale out use case (Guest30199, 13:16:24) * OPTFRA-608 ticket create Error in Homing with multiple policies => promoted to Highest (blocking for use case vFW/vDNS HPA) (Guest30199, 13:18:20) * Change Management - Flexible Designer & Orchestrator => could be ok for the end of the week (Guest30199, 13:18:57) * K8S based Cloud Region Support - EdgeXFoundry Use case - blocked by the same SO issue (SO-2357), fix provided. (Guest30199, 13:24:04) * full healthcheck OK on Ericsson lab last Tuesday (Guest30199, 13:26:03) * SO 1.5.3 expected for friday (include vCPE fixes) (Guest30199, 13:27:06) * pypi python-test-utils no more empty. Fix provided yesterday and cherry-picked on el-alto to get a 0.5.1 version (Guest30199, 13:28:21) * lab status (Guest30199, 13:28:58) * integration release dealy frozen, waith for So and SDNC snapshot (Guest30199, 13:29:34) * oversubcription changed in windriver lab (Guest30199, 13:31:36) * ACTION: morgan get results from vmtp/shaker on windriver lab after this major config change (Guest30199, 13:32:01) * E/// lab => all healthcheck tests are PASS (Guest30199, 13:32:20) * sometimes an issue with a VNFM driver timeout (Guest30199, 13:32:45) * OOF tenant not impacted by the last changes (Guest30199, 13:33:31) * Orange lab unracked/reracked in the new DC. Wait for network reconfiguration (Guest30199, 13:35:58) * in // work on Azure in progress, some issues (limited number of vCPU). We observed that some operations (devstack deploypement, teardown) looks sometimes slower than with private cloud (Guest30199, 13:36:50) * patch for the 72h test provided. (robot not infra problem) (Guest30199, 13:37:52) * working on robot in progress (Guest30199, 13:38:47) * tests done on dedicated longetivity lab (Guest30199, 13:39:01) * results reported on onapci.org (Guest30199, 13:40:13) * ACTION: all review the doc and update the rst accordingly (remove dublin reference) (Guest30199, 13:42:07) * ACTION: review also the wiki page on the test status (Guest30199, 13:44:14) * ACTION: morgan add 2 columns to the table: doc OK, CI candidate (Guest30199, 13:44:33) * admin (Guest30199, 13:44:36) * el alto to be cut today (Guest30199, 13:44:52) * PTL election: a page has been created (Guest30199, 13:45:32) * LINK: https://wiki.onap.org/display/DW/Integration+PTL+election+Frankfurt (Guest30199, 13:46:12) * Frankfurt epic review (Guest30199, 13:51:04) * including more automated test in daily chains (Guest30199, 13:51:54) * PTl meeting => review of CSIT planned (Guest30199, 13:58:30) Meeting ended at 14:04:45 UTC. People present (lines said) --------------------------- * Guest30199 (70) * collabot_ (4) Generated by `MeetBot`_ 0.1.4