======================================= #opnfv-meeting: dovetail weekly meeting ======================================= Meeting started by hongbo3949493477 at 13:01:00 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/opnfv-meeting/2017/opnfv-meeting.2017-08-18-13.01.log.html . Meeting summary --------------- * hongbo (hongbo3949493477, 13:02:10) * Ray Paik (rpaik, 13:02:14) * leoWang (leo_wang, 13:02:16) * Wenjing (Wenjing, 13:02:19) * Trevor Cooper (trevor_intel, 13:02:28) * xudan (xudan, 13:02:29) * Cvp web portal plan review (hongbo3949493477, 13:03:17) * Tomofumi (s1061123, 13:04:02) * some LF friend attended the dovetail meeting to inroduce the portal (hongbo3949493477, 13:04:16) * backend and data base can be supported from the LF (hongbo3949493477, 13:04:56) * LINK: https://cvp.opnfv.org (bramwelt, 13:05:21) * the web can support the login and upload the test results (hongbo3949493477, 13:06:31) * (Mika_R, 13:06:54) * everybody can login with the LF id and upload the results (hongbo3949493477, 13:06:55) * Mika_R (Mika_R, 13:07:03) * anybody who want to try can sedn the email to leo for the try (hongbo3949493477, 13:07:55) * landing page which cover the introduction of the CVP (hongbo3949493477, 13:08:25) * Brandon introduce one page is the hight level introduction (hongbo3949493477, 13:09:47) * upload results and review functions are needed in the landing page (hongbo3949493477, 13:14:37) * downlaod the tools and procedures are needed in the pages (hongbo3949493477, 13:16:13) * style guide with opnfv.org's color palettes, icons, etc. can be provided (rpaik, 13:20:31) * ACTION: leo will with ppt to illustrate the idea (hongbo3949493477, 13:23:37) * serena said it is bettere to use the LF login page (hongbo3949493477, 13:24:45) * LF are working on that by Ray (hongbo3949493477, 13:25:01) * Beta draft plan (hongbo3949493477, 13:26:26) * LINK: https://wiki.opnfv.org/display/dovetail/Dovetail+Beta (hongbo3949493477, 13:28:27) * chris when we can go to the TSC for review (hongbo3949493477, 13:35:04) * wenjing said one option is that we can to to the meeting until the documents are merged . second we can go to the TSC untill all done (hongbo3949493477, 13:35:50) * time the problem for the picture is that we need to allow the TSC make the desicion for the scope (hongbo3949493477, 13:36:35) * tim (hongbo3949493477, 13:36:48) * the abendum needs to go tho the C&C meeting (hongbo3949493477, 13:37:12) * all these need to be shwon in the diagram (hongbo3949493477, 13:37:33) * we can sumarize the docuemts for the TSC (hongbo3949493477, 13:39:10) * try to show the comtent to the TSC (hongbo3949493477, 13:39:27) * wenjing will mov the feather freeze behind the TSC (hongbo3949493477, 13:40:44) * the board will ask the TSC to approve the scope (hongbo3949493477, 13:43:34) * for the next C&C, the abbendum will be reviewd (hongbo3949493477, 13:44:06) * LINK: https://wiki.opnfv.org/display/dovetail/Dovetail+%28Danube%29+Documentation+for+Review (trevor_intel, 13:44:45) * there are some steps for the beta testing (hongbo3949493477, 13:45:04) * Entering Beta, Test result review, Bug fixes and Exit Beta (hongbo3949493477, 13:46:20) * Documentation: addendum, and the full list that still need to be merged (hongbo3949493477, 13:50:00) * LINK: https://wiki.opnfv.org/display/dovetail/Dovetail+%28Danube%29+Documentation+for+Review (hongbo3949493477, 13:50:20) * workflow, abbendum are important and may impact other (hongbo3949493477, 13:55:10) * resillency test will go back for the discussion. (hongbo3949493477, 14:02:42) Meeting ended at 14:03:58 UTC. People present (lines said) --------------------------- * hongbo3949493477 (37) * leo_wang (8) * trevor_intel (6) * zshi_laptop (4) * collabot (3) * xudan (2) * Mika_R (2) * rpaik (2) * s1061123 (1) * bramwelt (1) * Wenjing (1) Generated by `MeetBot`_ 0.1.4