#fdio-csit: CSIT-weekly-160914

Meeting started by mackonstan at 14:02:09 UTC (full logs).

Meeting summary

  1. agenda bashing (mackonstan, 14:02:39)
  2. Inputs from FD.io projects (mackonstan, 14:04:16)
  3. VPP (mackonstan, 14:04:21)
    1. dwallacelf (dwallacelf, 14:04:28)
    2. vpp1609 releasing today, on target (mackonstan, 14:04:35)

  4. DPDK+VPP focused pre-integration testing - Waterman Cao (mackonstan, 14:07:46)
    1. no updates from Waterman (mackonstan, 14:08:11)

  5. TLDK test cases - Anna (Qun Wan). (mackonstan, 14:08:34)
    1. based on review binaries should be removed, Anna confirmed she will do it (mackonstan, 14:08:52)
    2. https://gerrit.fd.io/r/#/c/2492/ < tldk test cases (mmiklus, 14:09:13)

  6. HoneyComb project (mackonstan, 14:10:41)
    1. Samuel - baseline test cases are already developed, but not automated yet (mackonstan, 14:13:08)
    2. it may be worth to have an overview of HC testcases in place, and plan, add to agenda for next week (mackonstan, 14:13:38)
    3. ACTION: Samuel Elias - prepare for CSIT HC TCs readout next week on weekly csit (mackonstan, 14:14:05)

  7. FD.io CSIT operational status (mackonstan, 14:14:23)
    1. Peter - performance testbed connectivity outages: 8-Sep (mackonstan, 14:17:42)
    2. Matej - functional testbeds - no infra issues. (mackonstan, 14:18:53)
    3. Ed offering to help to assist with any real-time LF infra issue - irc channels: fdio-csit, gmail account (mackonstan, 14:20:13)
    4. 8-sep outage tracked under: [FD.io Helpdesk #29228] JENKINS - again issue with degraded network (mmiklus, 14:20:51)

  8. CSIT exec time reduction update (mackonstan, 14:21:51)
    1. Matej provided update - Jan submitted the patch for review (mackonstan, 14:22:51)
    2. https://gerrit.fd.io/r/#/c/2855/ (mackonstan, 14:22:58)

  9. csit1609 release readiness (mackonstan, 14:24:52)
    1. for functional test report use this job: csit-vpp-functional-1609-virl (mackonstan, 14:27:44)
    2. for performance test report use this job: csit-vpp-perf-1609-all (mackonstan, 14:28:00)
    3. functional report will list failing test cases with explanation (mackonstan, 14:34:29)
    4. performance report will show throughput and latency numbers, also showing repeatability of results on plots (over multiple job runs) (mackonstan, 14:36:09)

  10. VM-virtio, VPP-vhost-user numbers - update Peter. (mackonstan, 14:40:37)
    1. expecting improved performance with patched vhost-user code (mackonstan, 14:40:53)

  11. Latency measurements - update Miroslav (mackonstan, 14:41:26)
    1. Miro proposed a patch to measure latency at 10%NDR and 50%NDR in addition to 100%NDR (mackonstan, 14:42:08)
    2. https://jenkins.fd.io/view/csit/job/csit-vpp-perf-master-long/1052/console < verify job (mmiklus, 14:42:25)

  12. Review failing tests CSIT Jira 1609-fail (mackonstan, 14:43:54)
    1. https://jira.fd.io/issues/?filter=10667 (mackonstan, 14:44:17)
    2. Samuel: csit-402 documented, csit-409 - will do (mackonstan, 14:44:33)
    3. Matej: all my CSIT-xxxx are documented (mackonstan, 14:45:00)

  13. Test report generation (mackonstan, 14:45:28)
    1. Peter - updated parser and report, and the graphs (mackonstan, 14:46:03)
    2. https://wiki.fd.io/view/CSIT/VPP-16.09_Test_Report_Draft (mackonstan, 14:46:07)
    3. some performance anomalies between tb1-or-tb2 and tb3 (mackonstan, 14:52:21)
    4. ACTION: Peter, Maciek to investigate (mackonstan, 14:52:30)
    5. verify kernel versions in tb1, tb2, tb3 (mackonstan, 14:57:39)

  14. CSIT dev work plan - wiki plan, jira tracking (mackonstan, 14:58:54)
    1. vpp1612 planning meeting on 20-Sep, Suggestion: follow one week later with csit1612. (mackonstan, 14:59:33)


Meeting ended at 15:07:39 UTC (full logs).

Action items

  1. Samuel Elias - prepare for CSIT HC TCs readout next week on weekly csit
  2. Peter, Maciek to investigate


People present (lines said)

  1. mackonstan (45)
  2. collabot (5)
  3. mmiklus (3)
  4. dwallacelf (1)


Generated by MeetBot 0.1.4.