#fdio-csit: csit weekly 8-Feb-2017
Meeting started by mackonstan1 at 15:01:02 UTC
(full logs).
Meeting summary
-
- Dave Wallace (dwallacelf,
15:01:58)
- Jan Gelety (jgelety,
15:02:14)
- Tibor Frank (tifrank,
15:02:24)
- Agenda bashing (mackonstan1, 15:02:43)
- Samuel Elias (selias,
15:02:47)
- Peter Mikus (pmikus1,
15:03:05)
- Billy McFall (for Thomas Herbert) (BillyM,
15:06:24)
- VPP (mackonstan1, 15:06:53)
- need to track VPP 1704 plan for CSIT 1704 plan:
https://wiki.fd.io/view/Projects/vpp/Release_Plans/Release_Plan_17.04
(mackonstan1,
15:07:02)
- HoneyComb (mackonstan1, 15:07:35)
- Sam - will provide target plan for HC
testing.. (mackonstan1,
15:08:35)
- FD.io CSIT readout to OPNFV - done 1-Feb (mackonstan1, 15:09:09)
- FD.io board CSIT readout - confirmed - 9-Feb (mackonstan1, 15:10:30)
- Maciek/mackonstan1 - will send slides materials
for review as per opnfv readout last week (mackonstan1,
15:12:50)
- FD.io CSIT operational status (mackonstan1, 15:13:06)
- no issues (mackonstan1,
15:13:09)
- vpp1701 and csit1701 - status readout (mackonstan1, 15:15:19)
- to be added: vpp perf (mackonstan1, 15:25:10)
- cryptodev - this csit patch needs to verify -
https://gerrit.fd.io/r/#/c/4454/ (mackonstan1,
15:27:01)
- #4454 dependencies: Kirill will push an update
to address GCM config change, and another dependency on vpp patch
for VAT macro change (link?) (mackonstan1,
15:29:42)
- https://gerrit.fd.io/r/#/c/5052
(mackonstan1,
15:30:17)
- Kiriill will add another test case with more
ip4 ipsec configurations - with virtual ipsec interfaces for testing
scale of interfaces (mackonstan1,
15:32:55)
- to be added: testpmd perf (mackonstan1, 15:35:04)
- Tibor working on adding more NICs (mackonstan1,
15:35:17)
- to be added: vpp func (mackonstan1, 15:35:53)
- CSIT bootstrap patch was merged. ci-man patch,
https://gerrit.fd.io/r/4579 latest series has fix for removing
operational branch creation which we are going to do in separate
job. 4579 is ready to be reviewed and merged. This should trigger
the Centos VIRL jobs. (BillyM,
15:35:53)
- #4579 - should split vpp.yaml modification to
a separate patch, as they affect vpp verify jobs, and we need to
make that csit-vpp-verify jobs actually work for centos (mackonstan1,
15:55:26)
- #4579 need to complete the review and
merge (mackonstan1,
15:56:12)
- assuming above is addressed, integrating centos
into csit-vpp-functional jobs should run and allow us to smooth out
any issues (mackonstan1,
16:09:09)
- once these centos jobs pass, we can follow with
creating csit oper branches, and automating it thereafter
(mackonstan1,
16:09:51)
- CSIT online docs (mackonstan1, 16:12:33)
- vpptest docgens published - some issues with
nexus credentials, being addressed by another path in ci-mgmt by
Tibor, Vanessa to help drive this thru (mackonstan1,
16:13:12)
Meeting ended at 16:13:16 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan1 (28)
- valderrv (4)
- collabot (4)
- BillyM (2)
- dwallacelf (1)
- jgelety (1)
- selias (1)
- pmikus1 (1)
- tifrank (1)
Generated by MeetBot 0.1.4.