#fdio-csit: FD.io CSIT Project Meeting 26-Apr
Meeting started by mackonstan1 at 14:02:40 UTC
(full logs).
Meeting summary
-
- Jan Gelety (jgelety,
14:03:03)
- Tibor Frank (Tibor_,
14:03:05)
- agenda bashing (mackonstan1, 14:03:05)
- Dave Wallace (dwallacelf,
14:03:12)
- Peter Mikus (pmikus1,
14:03:36)
- Inputs from LF and FD.io projects (mackonstan1, 14:04:58)
- FD.io CSIT operational status (mackonstan1, 14:08:09)
- performance testbed issue - tb1 behaviour
changed and yielding inconsistent NDR discovery results, different
than tb2, tb3 (mackonstan1,
14:10:10)
- pmikus to investigate tb1 and do
forensics (mackonstan1,
14:10:45)
- Centos7 VIRL tests instabilities - status, plan (mackonstan1, 14:11:10)
- based on latest simulation tests by tfherbert -
all points to issue with spurious IPv6 RA packets (mackonstan1,
14:19:55)
- agreed to have a quick live sync this week with
Florin to reproduce this problem and get next steps (mackonstan1,
14:20:54)
- csit1704 plan and report generation (mackonstan1, 14:22:05)
- Tom Herbert (tfherbert,
14:35:31)
- Test environment - upgrading VIRL hosts.. (mackonstan1, 14:37:26)
- need to complete tb3-virl environment
verification incl. Ubuntu1604 simulations - due to previous issue
with ip addressing in cloud-init (mackonstan1,
14:43:38)
- Matej and Peter to work the tb3-virl
verification aspect, including documentation into ansible scripts
for any captured changes (mackonstan1,
14:44:30)
- then follow up with upgrades of tb1-virl and
tb2-virl, ensuring two machines always in operation (mackonstan1,
14:44:56)
- Performance tests (mackonstan1, 14:45:09)
- Perf jobs reorg - completed and all job definitions merged (mackonstan1, 14:49:31)
- once 1704-all jobs and data collection done, do
dry-run vpp-csit-performance check jobs (mackonstan1,
14:50:42)
- VPP functional tests - virl (mackonstan1, 14:53:50)
- patches waiting for review: nsh_sfc func tests
patches, (mackonstan1,
14:55:07)
- patches waiting for review: nsh_sfc func tests
patches, tldk func tests patches (mackonstan1,
14:55:36)
- Honeycomb functional tests - virl (mackonstan1, 14:56:36)
- content into report provide (mackonstan1,
14:56:42)
Meeting ended at 15:01:20 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan1 (24)
- collabot (4)
- tfherbert (1)
- dwallacelf (1)
- jgelety (1)
- pmikus1 (1)
- Tibor_ (1)
Generated by MeetBot 0.1.4.