#fdio-csit: 7-Jun FD.io CSIT Project Meeting

Meeting started by mackonstan1 at 14:00:40 UTC (full logs).

Meeting summary

    1. Jan Gelety (jgelety, 14:00:54)
    2. Samuel Elias (selias, 14:00:57)
    3. Peter Mikus (pmikus1, 14:01:10)
    4. Dave Wallace (dwallacelf, 14:04:05)
    5. Tibor Frank (Tibor_, 14:04:30)

  1. Agenda bashing (mackonstan1, 14:05:47)
  2. VPP (mackonstan1, 14:10:10)
    1. Dave - reporting - VPP API freeze tomorrow (mackonstan1, 14:10:25)
    2. DBarach raised a point re make test flow exporter tests taking time - Maciek will send email asking for suggestions (mackonstan1, 14:11:08)
    3. also spotted vpp-verify repeatedly failing - Matus reported Klement is looking at addressing the issues (mackonstan1, 14:12:56)

  3. • VPP: adding VPP debug image tests to CSIT (mackonstan1, 14:13:04)
    1. Dave Wallace - will send proposal to csit-dev (mackonstan1, 14:13:19)

  4. FD.io CSIT operational status (mackonstan1, 14:13:34)
  5. LF infra, testing jobs: all working fine, incl. upgraded tb4-virl1 intro'ed yday into vpp-csit verify jobs (mackonstan1, 14:16:38)
  6. open: un-pegging dpdk dev package version from CSIT, track vpp master instead? (email thread) (mackonstan1, 14:16:49)
    1. Sergio, Damjan, Maciek - suggesting to use make verify to address un-pegging dpdk dev package version from CSIT (mackonstan1, 14:17:54)
    2. Maciek - make test is not required, but can be masked in make verify (mackonstan1, 14:18:11)
    3. Peter - the issue is that make verify also installs newly build vpp on jenkins slave - CSIT needs to install newly built vpp into CSIT environment - VIRL or phy perf (mackonstan1, 14:21:28)
    4. ACTION: Peter, Dave, Maciek - follow-up on un-pegging dpdk dev package from csit, use csit-dev thread by Ed Warnicke (mackonstan1, 14:23:59)
    5. https://lists.fd.io/pipermail/csit-dev/2017-May/002006.html (mackonstan1, 14:24:01)

  7. Test environment updates (mackonstan1, 14:24:55)
  8. adding test equipment: Netgate (mackonstan1, 14:25:24)
    1. no progress, need to poke on csit-dev (mackonstan1, 14:25:34)

  9. VIRL platform (mackonstan1, 14:27:16)
  10. VIRL-GetWellPlan, VIRL-Optimizations - see jira links (mackonstan1, 14:29:53)
    1. see jira links (mackonstan1, 14:29:59)

  11. VIRL hosts upgrade - tb4-virl1 in production, remaining hosts: tb4-virl2, tb4-virl3 (mackonstan1, 14:30:58)
    1. Peter updating - expecting tb4-virl2 to move into upgrade phase this week (mackonstan1, 14:31:18)

  12. Centos7 VIRL tests - updates? (mackonstan1, 14:31:40)
    1. Jan updating - Centos7 qemu start issue - will raise with Thomas F Herbert (mackonstan1, 14:32:39)

  13. CSIT jobs reorgs (mackonstan1, 14:33:55)
    1. Tibor update - pdrchk for triggered vpp-csit perf tests failiing - need to bisect the issue (mackonstan1, 14:34:28)
    2. Tibor to ping pointer to issues to Fabien, Maciek (mackonstan1, 14:37:04)

  14. CSIT design optimizations (mackonstan1, 14:37:17)
    1. https://wiki.fd.io/view/CSIT/Design_Optimizations (mackonstan1, 14:37:32)
    2. https://gerrit.fd.io/r/#/c/6968/ (mackonstan1, 14:38:26)
    3. Tibor - csit-deve email for - remove unused and not needed KWs. (mackonstan1, 14:39:51)

  15. csit1704 report (mackonstan1, 14:40:13)
  16. csit1704 known issues resolution - updates? (mackonstan1, 14:40:44)
    1. no major updates - issues with i40e driver performance still persist (mackonstan1, 14:41:13)
    2. ACTION: Maciek - send a TPL level email summary to csit-dev - asking for status update on all csit1704 known issues (mackonstan1, 14:41:55)

  17. csit1707 plan (mackonstan1, 14:45:25)
    1. tracked on CSIT wiki high-level (mackonstan1, 14:48:55)
    2. real tracking on jira as part of epics: 1707-* (mackonstan1, 14:49:10)
    3. Matus to help coordinate (mackonstan1, 14:49:42)

  18. VPP functional tests - virl (mackonstan1, 14:50:29)
    1. Sam adding number of HC performance tests (mackonstan1, 14:50:42)
    2. Peter comment - need to schedule dry run pef testing the HC CRUD API performance in physical machines, due their different nature vs. all other perf tests done with VPP that are focusing on data plane (mackonstan1, 14:52:00)


Meeting ended at 14:52:24 UTC (full logs).

Action items

  1. Peter, Dave, Maciek - follow-up on un-pegging dpdk dev package from csit, use csit-dev thread by Ed Warnicke
  2. Maciek - send a TPL level email summary to csit-dev - asking for status update on all csit1704 known issues


People present (lines said)

  1. mackonstan1 (46)
  2. collabot (3)
  3. dwallacelf (1)
  4. jgelety (1)
  5. selias (1)
  6. pmikus1 (1)
  7. Tibor_ (1)


Generated by MeetBot 0.1.4.