#fdio-csit: 14-Jun FD.io CSIT Project Meeting
Meeting started by mackonstan1 at 14:00:26 UTC
(full logs).
Meeting summary
-
- Maciek K (mackonstan1,
14:00:33)
- Jan Gelety (jgelety,
14:00:52)
- Tibor Frank (Tibor_,
14:01:11)
- Agenda bashing (mackonstan1, 14:01:59)
- Inputs from LF and FD.io projects (mackonstan1, 14:04:21)
- Tom Herbert (tfherbert,
14:04:25)
- Dave Wallace (dwallacelf,
14:04:39)
- APIs frozen (mackonstan1, 14:05:30)
- vpp (mackonstan1, 14:05:35)
- APIs frozen (mackonstan1,
14:05:40)
- nsh_sfc project (mackonstan1, 14:06:13)
- Tibor updating - jenkins jobs running, but test
code broken - in debugging - Peter assisting from csit side.
(mackonstan1,
14:06:58)
- FD.io CSIT operational status (mackonstan1, 14:07:19)
- LF infra, testing jobs (mackonstan1, 14:08:04)
- Jan reporting - today observed - high volume of
ssh timeouts to VIRL servers - affect vpp-csit-verify- and
csit-vpp-verify- (mackonstan1,
14:09:12)
- [http://fd.io Helpdesk #41921] connection
interruptiones between jenkins executor and VIRL servers
(mackonstan1,
14:09:26)
- LF IT / Anton stating no underlying issue found
yet (mackonstan1,
14:09:39)
- pinged abaranov (LF IT / Anton) on
#fdio-infra (mackonstan1,
14:13:44)
- reply from anton: ok. I'll send a ticket to
vexxhost (mackonstan1,
14:14:37)
- open - un-pegging dpdk dev package version from CSIT, track vpp master instead? (email thread) (mackonstan1, 14:15:48)
- ACTION: Peter, Maciek
- high-level proposal in email thread - piggyback on vpp make verify
- (mackonstan1,
14:17:15)
- ACTION: Peter -
proposing a patch to ci-mgmt to be reviewed by csit team and
ci-mgmt (mackonstan1,
14:18:24)
- vpp team should bless this approach too
(mackonstan1,
14:18:36)
- Test environment updates (mackonstan1, 14:19:09)
- adding test equipment: Netgate (mackonstan1, 14:20:01)
- Thomas and Maciek to coordinate the progress
with Netgate / Matt (mackonstan1,
14:21:15)
- VIRL platform (mackonstan1, 14:22:52)
- VIRL hosts upgrade - in production: tb4-virl1,
in progress: tb4-virl2, remaining: tb4-virl3 (mackonstan1,
14:23:03)
- Peter updating - tb4-virl2 - upgrade done, dry
run tests in progress, but some are failing due to the ssh timeout
infra issue affecting the verify jobs per earlier note (mackonstan1,
14:24:17)
- once dry run tests pass, tb4-virl2 going back
into production (mackonstan1,
14:25:39)
- tb4-virl3 - expected to be much smoother - 95%
automated :) (mackonstan1,
14:25:58)
- Centos7 VIRL tests - status (mackonstan1, 14:31:49)
- Tom updating - setting up the internal
environment to t/shoot the startup issues (mackonstan1,
14:33:24)
- current Centos7 issues tracking in csit jira:
CSIT-602 (mackonstan1,
14:36:05)
- https://jira.fd.io/browse/CSIT-602
(mackonstan1,
14:36:12)
- CSIT jobs reorgs (mackonstan1, 14:44:15)
- Tibor - wiki page updated and all jobs are
verified (mackonstan1,
14:44:27)
- https://wiki.fd.io/view/CSIT/Jobs
(mackonstan1,
14:44:37)
- CSIT design optimizations (mackonstan1, 14:45:26)
- implementation steps in progress (mackonstan1,
14:49:41)
- Tibor and Maciek updating (mackonstan1,
14:49:46)
- Tibor already done: KW renaming, remove unused
and not needed KWs, refactor Suite/Test Setup/Tear , performance
library dividing into: setups, configuration, utilities (mackonstan1,
14:51:18)
- Tibor csit repo directory reshuffle, drive
alignment with test naming and results reporting (mackonstan1,
14:51:31)
- csit1704 report (mackonstan1, 14:54:43)
- any updates to csit-dev pls (mackonstan1,
14:54:58)
- csit1707 plan (mackonstan1, 14:55:19)
- https://wiki.fd.io/view/CSIT/csit1707_plan
(mackonstan1,
15:01:06)
- csit1707 plan wiki linked to csit JIRA story
tickets (mackonstan1,
15:01:40)
Meeting ended at 15:01:47 UTC
(full logs).
Action items
- Peter, Maciek - high-level proposal in email thread - piggyback on vpp make verify -
- Peter - proposing a patch to ci-mgmt to be reviewed by csit team and ci-mgmt
People present (lines said)
- mackonstan1 (47)
- collabot (4)
- dwallacelf (1)
- jgelety (1)
- Tibor_ (1)
- tfherbert (1)
Generated by MeetBot 0.1.4.