#fdio-csit: 19-Jul http://fd.io/ CSIT Project Meeting

Meeting started by mackonstan at 14:00:45 UTC (full logs).

Meeting summary

    1. Dave Wallace (dwallacelf, 14:01:02)
    2. Jan Gelety (jgelety, 14:01:03)

  1. agenda bashing (mackonstan, 14:01:05)
    1. Peter Mikus (pmikus1, 14:01:31)

  2. Inputs from LF and FD.io projects (mackonstan, 14:04:32)
    1. VPP 17.07 releasing today (mackonstan, 14:05:26)
    2. Tom Herbert (tfherbert, 14:06:59)

  3. operational status (mackonstan, 14:09:02)
    1. Jan reporting: all Green.. outside of sporadic VIRL test failures (mackonstan, 14:10:01)
    2. OPEN - VIRL ssh timeout issues for tb4-virl1 and tb4-virl2 [FD.io Helpdesk #41921] (mackonstan, 14:11:16)
    3. Maciek, Ed reporting: no ssh timeout issues spotted on virl1 running in production. (mackonstan, 14:11:35)
    4. Ed reporting: virl2 in production as of yday UTC evening (mackonstan, 14:12:14)
    5. so far no issue (mackonstan, 14:12:20)
    6. Tom reporting: in his local CSIT virtual setup, observed SSHTimeout errors related to unsuccessful ping via a socket to a nested VM (mackonstan, 14:16:30)
    7. Tom will send logs to csit-dev (mackonstan, 14:16:48)
    8. need to open a Jira ticket to track it separately (mackonstan, 14:17:06)
    9. ACTION: JIRA - open a ticket for "observed SSHTimeout errors related to unsuccessful ping via a socket to a nested VM" (mackonstan, 14:17:44)
    10. more JIRA tickets for: upgrading nested VM, listmaker update for Centos (mackonstan, 14:19:43)

  4. WIP - un-pegging dpdk dev package version from CSIT (mackonstan, 14:22:28)
    1. sergio patch had some hiccups, but at the end the new build process working… dependency issues where due to vpp side (mackonstan, 14:23:09)

  5. rls1707 plan (mackonstan, 14:24:42)
    1. csit rls1707 on target, code complete (mackonstan, 14:25:58)
    2. status tracked in Jira and on below wiki (mackonstan, 14:26:09)
    3. https://wiki.fd.io/view/CSIT/csit1707_plan (mackonstan, 14:26:16)
    4. Centos7 VIRL tests - still work in progress (mackonstan, 14:26:57)
    5. Maciek proposing: crazy idea - run Centos7 jobs without ANY VM tests ? (mackonstan, 14:31:02)
    6. Jan: will build a patch for this, and see what happens, put Tom as a reviewer (mackonstan, 14:31:20)

  6. rls1707 report (mackonstan, 14:32:01)
    1. https://docs.fd.io/csit/master/report/ (mackonstan, 14:35:12)
    2. latest draft in above link (mackonstan, 14:35:20)
    3. report work tracked on jira under epic csit-618 (mackonstan, 14:35:36)
    4. https://jira.fd.io/browse/CSIT-618 (mackonstan, 14:35:49)

  7. Performance tests (mackonstan, 14:42:42)
    1. VPP SW cryptodev tests - status - not in rls1707 - it will be in a next one, due to late arrival of vpp and dpdk crypto library patches (mackonstan, 14:44:50)
    2. l2fwd-cryptodev baseline - not done - in next release. (mackonstan, 14:45:13)
    3. memif/container, access-groups, vhost variations - all code complete, few issues discovered, will be listed in rls notes (mackonstan, 14:45:36)

  8. VPP functional tests - virl (mackonstan, 14:46:02)
    1. nsh_sfc - tests running, in report (mackonstan, 14:46:31)
    2. https://docs.fd.io/csit/master/report/detailed_test_results/nshsfc_functional_results/index.html (mackonstan, 14:46:38)
    3. tldk - tests not running, review not complete, next release (mackonstan, 14:46:54)

  9. Honeycomb tests (mackonstan, 14:47:11)
    1. all func and perf tests running (mackonstan, 14:47:21)
    2. func tests results in report (mackonstan, 14:47:26)
    3. https://docs.fd.io/csit/master/report/detailed_test_results/honeycomb_functional_results/index.html (mackonstan, 14:47:38)
    4. perf tests results - TBD if appropriate to include into report as not fully representative, yet. if not, in next rls (mackonstan, 14:48:11)

  10. Test environment updates (mackonstan, 14:48:25)
    1. adding test equipment: Netgate - Tom verified they're all accessible. next step is to update Centos, build topology, and then run tests. (mackonstan, 14:49:04)

  11. VIRL platform (mackonstan, 14:50:40)
    1. virl1, virl2 upgraded and in production. virl3 on old code, had some issues, reboot resolved. Thx Ed for doing so. (mackonstan, 14:51:29)
    2. Ed proposing: wait a week…. then consider taking out virl3, and upgrade. (mackonstan, 14:52:04)
    3. criteria of deciding => Ed being happy with state of affairs in virl-land in CSIT. (mackonstan, 14:52:30)
    4. https://www.youtube.com/watch?v=aLJ0XLeV3V4 (mackonstan, 14:54:23)

  12. design optimizations (mackonstan, 14:56:06)
  13. Housekeeping (mackonstan, 14:56:46)


Meeting ended at 14:58:31 UTC (full logs).

Action items

  1. JIRA - open a ticket for "observed SSHTimeout errors related to unsuccessful ping via a socket to a nested VM"


People present (lines said)

  1. mackonstan (53)
  2. collabot (4)
  3. dwallacelf (1)
  4. jgelety (1)
  5. pmikus1 (1)
  6. tfherbert (1)


Generated by MeetBot 0.1.4.