#fdio-csit: 01-Nov FD.io CSIT Project Meeting

Meeting started by mackonstan1 at 15:02:32 UTC (full logs).

Meeting summary

  1. Agenda bashing (mackonstan1, 15:06:29)
    1. Dave Wallace (dwallacelf, 15:06:49)

  2. Inputs from LF and FD.io projects (mackonstan1, 15:07:24)
  3. Operational status (mackonstan1, 15:08:02)
    1. all good, tb4-virl1 is getting slow - chase Ed for fixing this (mackonstan1, 15:08:24)

  4. rls1710 release (mackonstan1, 15:09:43)
    1. draft rls1710 report: https://docs.fd.io/csit/master/report/ (mackonstan1, 15:12:05)
    2. https://docs.fd.io/csit/master/report/ (mackonstan1, 15:12:10)

  5. CSIT Presentation and Analytics Layer (PAL (mackonstan1, 15:14:21)
    1. Tom Herbert (tfherbert, 15:14:22)
    2. https://git.fd.io/csit/tree/resources/tools/presentation/doc/pal_lld.rst (mackonstan1, 15:14:36)
    3. PAL extension to ingest more telemetry data: e.g. outputs from "show run" - need to review the API status for that.. (mackonstan1, 15:17:08)

  6. Performance tests (mackonstan1, 15:17:41)
  7. VPP functional tests - virl (mackonstan1, 15:18:04)
  8. Honeycomb tests (mackonstan1, 15:21:36)
  9. Test environment updates (mackonstan1, 15:21:53)
    1. adding test equipment: Netgate - still issues with access to the boxes (mackonstan1, 15:22:56)

  10. Centos7 VIRL tests - status (mackonstan1, 15:23:29)
    1. Tom reporting - hitting issues with Linux permissions, and nested VM boot, detail in email to csit-dev mailer. (mackonstan1, 15:27:03)

  11. ARM additions to CSIT labs (mackonstan1, 15:27:22)
    1. Brian Brooks reporting - Marvell boards put on hold, as some other Huawei boards were shipped to CSIT lab.. (mackonstan1, 15:30:50)
    2. Kumar Khemendra reporting - Huawei team is putting server boards into CSIT lab.. but no more detail about status (mackonstan1, 15:31:26)
    3. it's George Zhao @Huawei arranged the Huawei boards to be shipped (mackonstan1, 15:33:13)
    4. Kumar reporting - Naveen M will focus on CSIT tests on ARM platform(s), needs some pointers about CSIT framework (mackonstan1, 15:36:22)
    5. Brian reporting - Gabriel making good progress with make test, tests are now more stable (mackonstan1, 15:36:46)

  12. NestedVM refresh - status (mackonstan1, 15:37:59)
    1. code is ready, and now time to productize - Peter and Ed have been leading this (mackonstan1, 15:38:22)

  13. (mackonstan1, 15:38:35)
  14. VIRL platform infra (mackonstan1, 15:38:38)
    1. no updates (mackonstan1, 15:38:42)


Meeting ended at 15:49:15 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan1 (31)
  2. collabot (4)
  3. tfherbert (1)
  4. dwallacelf (1)


Generated by MeetBot 0.1.4.