#fdio-csit: 08-Nov FD.io CSIT Project Meeting

Meeting started by mackonstan at 14:59:27 UTC (full logs).

Meeting summary

  1. 08-Nov FD.io CSIT Project Meeting (mackonstan, 15:00:00)
    1. Jan Gelety (jgelety, 15:00:05)

  2. Agenda bashing (mackonstan, 15:00:11)
  3. Inputs from LF and FD.io projects (mackonstan, 15:02:34)
    1. VPP (mackonstan, 15:03:10)
    2. HoneyComb - all tests reviewed and merged.. (mackonstan, 15:04:04)
    3. Tibor Frank (tifrank, 15:04:24)

  4. TSC - there is a new project proposal pma_tools this thursday (mackonstan, 15:05:20)
  5. Operational status (mackonstan, 15:05:44)
    1. Tom Herbert ... connecting (tfherbert, 15:06:05)
    2. Dave Wallace (dwallacelf, 15:08:04)
    3. last perf-all job execution hit some RF limit preventing post-processing - RF produced output.xml, but failed to produce report.xml and log.xml most likely due to its size . the actual limit is unkonwn .. (mackonstan, 15:09:19)

  6. rls1710 release (mackonstan, 15:09:40)
    1. rls1710 report is published (mackonstan, 15:10:46)
    2. https://docs.fd.io/csit/rls1710/report/ (mackonstan, 15:10:59)
    3. detailed results tables with tests <>64B and <>78B will be populated once the last test data collection job finishes ETA Thu 9-Nov (mackonstan, 15:11:36)

  7. rls1802 (mackonstan, 15:12:32)
  8. CSIT Presentation and Analytics Layer (PAL) (mackonstan, 15:13:53)
    1. see if we can integrate vpp "show run" into PAL, check API status first (mackonstan, 15:15:22)
    2. Tibor updating - simpler specification file, added: merging data from various RF xml files (mackonstan, 15:17:34)

  9. Performance tests (mackonstan, 15:18:21)
    1. sw crypto tests - Jan need to update pycrypto libraries to support required ciphers e.g. CGM, … (mackonstan, 15:20:06)

  10. VPP functional tests - virl (mackonstan, 15:20:30)
    1.  sw crypto tests - same as for perf tests - pycrypto library update in progress (mackonstan, 15:21:47)

  11. adding test equipment: Netgate (mackonstan, 15:22:02)
    1. Tom Herbert reporting - access to Netgate devices now restored, will do the upgrade and topology verification (mackonstan, 15:22:37)

  12. ARM additions to CSIT labs (mackonstan, 15:24:08)
    1. Brian - Tina from ARM shipping 3x ThunderX servers for ARM native vpp builds and make verify jobs execution (mackonstan, 15:27:17)
    2. Kumar - team wants to get familiar with CSIT framework and writing tests - will send email to csit-dev mailer. (mackonstan, 15:31:30)

  13. VIRL platform infra (mackonstan, 15:31:47)
    1. tb4-virl3 - status - need to check and bring it into production (mackonstan, 15:32:56)

  14. Centos7 VIRL tests - status (mackonstan, 15:33:22)
    1. Tom Herbert - using new nested VM, but hitting issue with qemu affecting host and nested VM connectivity (mackonstan, 15:38:21)
    2. issue related to detecting when nested VM is up or not (mackonstan, 15:40:43)

  15. csit jira (mackonstan, 15:42:42)
    1. Matus - updated jira epics for rls1802 (mackonstan, 15:42:56)
    2. Tom Herbert -- correction "Using new nested VM but hitting issue with establishing communication between virtual host and nested VM" (tfherbert, 15:43:41)


Meeting ended at 15:44:06 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan (35)
  2. collabot (4)
  3. tfherbert (2)
  4. jgelety (1)
  5. dwallacelf (1)
  6. tifrank (1)


Generated by MeetBot 0.1.4.