  1. Agenda bashing (mackonstan, 15:00:49)
  2. Inputs from LF and FD.io projects (mackonstan, 15:01:02)
    1. vpp project is going ahead with rls1801 - 24-Jan rls date.. (mackonstan, 15:02:38)
    2. honeycomb - need to check if any plans for further contributions to CSIT tests (mackonstan, 15:03:44)
    3. Dave Wallace (dwallacelf, 15:04:03)
    4. nsh_sfc - need to check if any plans for further contributions to CSIT tests (mackonstan, 15:04:33)
    5. goVPP - no update (mackonstan, 15:05:05)
    6. VPP rechecks - under control (mackonstan, 15:05:49)

  3. Operational status (mackonstan, 15:06:04)
    1. Jan Gelety - semiweekly Cento7 jobs failing - suspecting running out of disk space.. potentially due to the size of the default root partition (mackonstan, 15:07:44)

  4. rls1710 release (mackonstan, 15:09:11)
  5. next release - rls1801 (mackonstan, 15:14:20)
    1. https://wiki.fd.io/view/CSIT/csit1801_plan (mackonstan, 15:14:32)

  6. Performance tests (mackonstan, 15:15:26)
    1. Jan Gelety - SW cryptodev perf dry runs expecting to run tomorrow (mackonstan, 15:15:57)

  7. VPP functional tests - virl (mackonstan, 15:16:44)
    1. Jan - SW cryptodev func dry runs in progress.. some tunnel tests are crashing at key exchange phase, will be pinging Sertio (mackonstan, 15:17:49)
    2. target rls1801 - target to close the gap analysis - CSIT VIRL vs. VPP make-test - test coverage, make-test new capabilities (mackonstan, 15:19:04)

  8. Test environment updates (mackonstan, 15:19:46)
  9. lab extensions with XEON Skylake servers (mackonstan, 15:31:36)
    1. see Maciek's summary email (mackonstan, 15:31:44)

  10. adding test equipment: Netgate (mackonstan, 15:32:03)
    1. Tom - need to code two patches for csit and ci-mgmt (mackonstan, 15:33:31)
    2. would need to connect 10ge ports from existing TRex to complete a 3-node testbed with netgate devices.. proposal to disconnect TG TRex ports currently used for vic1227 - email thread (mackonstan, 15:37:59)

  11. ARM additions to CSIT labs (mackonstan, 15:38:22)
    1. server arrived - should be onboarded into VPP project verify jobs incl. build and make test execution (mackonstan, 15:39:19)

  12. NestedVM refresh (mackonstan, 15:39:55)
    1. NestedVM completed for Ubuntu (mackonstan, 15:40:08)
    2. blocked for Centos7 due to issues with out-of-disk space on tb4-virl3 (mackonstan, 15:40:47)


Meeting ended at 15:42:10 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan (31)
  2. collabot (4)
  3. nibo (1)
  4. jgelety (1)
  5. dwallacelf (1)
  6. tfherbert (1)
  7. tifrank (1)


Generated by MeetBot 0.1.4.