#fdio-csit: 17-Jan FD.io CSIT Project Meeting
Meeting started by mackonstan1 at 15:03:26 UTC
(full logs).
Meeting summary
-
- Peter Mikus (pmikus,
15:03:30)
- Jan Gelety (jgelety,
15:03:31)
- Tibor Frank (tifrank,
15:03:32)
- Marek Gradzki (mgradzki,
15:03:44)
- Dave Wallace (dwallacelf,
15:03:45)
- agenda bashing (mackonstan1, 15:03:55)
- Ed Kern (snergster,
15:04:16)
- project updates (mackonstan1, 15:04:31)
- vpp rc2 label dropped last wed per
schedule (mackonstan1,
15:04:50)
- dave: vpp rls on target for next week
24-feb (mackonstan1,
15:05:15)
- Tom Herbert (tfherbert,
15:07:08)
- honeycomb marek: rc2 milestone today, wip on
target, no new issues for csit jobs, report rls1801 related manual
sections updated (mackonstan1,
15:07:41)
- nsh_sfc: peter nsh_sfc 18.01 jobs are working,
tests are passing (mackonstan1,
15:08:59)
- some emails about cross-project collaboration
within LFN - Maciek to fwd to csit-dev. (mackonstan1,
15:12:09)
- Operational status (mackonstan1, 15:12:27)
- PeteR: tldk jobs are failing (mackonstan1,
15:13:03)
- tldk - is project alive, but no new code, not
much activity on the list (mackonstan1,
15:14:21)
- https://lists.fd.io/pipermail/tldk-dev/2018-January/thread.html
(mackonstan1,
15:14:29)
- rls1801 (mackonstan1, 15:23:25)
- https://wiki.fd.io/view/CSIT/csit1801_plan
(mackonstan1,
15:23:50)
- csit rls1801 deliverables status updated at the
link above (mackonstan1,
15:30:12)
- netgate cpe - physical connectivity still only
partial - need 2x 10GE TRex ports per netgate testbed (mackonstan1,
15:32:29)
- negtage testbed target specificaiton should be
documented in csit wiki (mackonstan1,
15:32:48)
- https://wiki.fd.io/view/CSIT/CSIT_LF_testbed
(mackonstan1,
15:32:52)
- IPSEC+LISP patch fixing all ipsec lisp
tests (mackonstan1,
15:37:55)
- https://gerrit.fd.io/r/#/c/10121/
(mackonstan1,
15:37:59)
- IPSEC+LISP bug VPP-1122 (pmikus,
15:40:54)
- another bug - ipsec multi-thread/multi-core and
scale tests failing (mackonstan1,
15:41:36)
- VPP-1122 (mackonstan1,
15:42:06)
- draft rls1801 report generation - to be done
now (mackonstan1,
15:48:10)
- dry run tests also can be started now
(mackonstan1,
15:48:19)
- https://docs.fd.io/csit/master/report/
(mackonstan1,
15:48:21)
- Meltdown/Spectre (mackonstan1, 15:51:04)
- Fixed in Ubuntu Linux kernel
4.4.0-108.131(4.4.0-109.114) (mackonstan1,
15:51:08)
- Upgraded Cisco mirror trending testbed last
Sunday to 4.4.0-109.114 and run trending jobs (mackonstan1,
15:51:26)
- Same/similar Haswell servers as in FD.io -
executed daily performance trending jobs to get indicative
numbers (mackonstan1,
15:51:35)
- Manual inspectiona and comparison of results
from first run does not show any significant performance
change (mackonstan1,
15:51:53)
- Some small fluctuations outside of expected
stdev observed for vhost and memif tests between the runs, but need
more runs to have statistically meaningful data. Note fluctuations
are also observed with previous kernel, especially for NDR.
(mackonstan1,
15:52:07)
- Execute rls1801 full set of tests - performance
and functional - on existing kernel - publish rls1801 report as per
published plan. (mackonstan1,
15:53:15)
- - include a note about indicative results with
Meltdown kernel fix from internal testing. (mackonstan1,
15:53:24)
- Upgrade FD.io testbeds with Haswell servers to
new fixed kernel ver., rerun full set of tests (mackonstan1,
15:53:35)
- - update the report with a separate section,
providing statistically valid before/after comparison (for report
each perf test is run 10 times) (mackonstan1,
15:54:00)
- - this will constitute public referenceable
data for Meltdown performance impact. (mackonstan1,
15:54:15)
- Spectre - requires Intel Processor microcode
upgrades (mackonstan1,
15:54:28)
- Published reports that Intel microcode
published last week is introducing system instabilities per Intel
public blog and press. (mackonstan1,
15:54:57)
- https://newsroom.intel.com/news/intel-security-issue-update-addressing-reboot-issues/
(mackonstan1,
15:55:10)
- Informed by Intel that BIOS update is required
in many systems, but possibly not all. No UCS specific info, as the
Spectre thing is still under info emargo within Intel. (mackonstan1,
15:55:35)
- FD.io lab updates - ARM (mackonstan1, 15:58:40)
- machhiatobin devices in labs, but not running
any FD.io jobs (mackonstan1,
15:59:35)
- CSIT TOIs (mackonstan1, 16:00:55)
- TOI1: Tue 23-Jan 07:00-08:00 PST / 15:00-16:00
UTC / 16:00-17:00 CET (mackonstan1,
16:01:21)
- TOI2: Fri 31-Jan 07:00-08:00 PST / 15:00-16:00
UTC / 16:00-17:00 CET (mackonstan1,
16:01:35)
Meeting ended at 16:02:59 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan1 (47)
- collabot (4)
- pmikus (3)
- mgradzki (1)
- tfherbert (1)
- jgelety (1)
- dwallacelf (1)
- snergster (1)
- tifrank (1)
Generated by MeetBot 0.1.4.