#fdio-csit: 28-Mar FD.io CSIT Project Meeting
Meeting started by mackonstan at 14:02:15 UTC
(full logs).
Meeting summary
-
- Jan Gelety (jgelety1,
14:02:23)
- Samuel Elias (selias,
14:02:26)
- Vratko Polak (vrpolak,
14:02:40)
- Tibor Frank (tifrank,
14:02:42)
- Dave Wallace (dwallacelf,
14:02:55)
- Agenda bashing (mackonstan, 14:03:41)
- Inputs from LF and FD.io projects (mackonstan, 14:03:53)
- DaveW - VPP - API freeze last week, no issues
reported (mackonstan,
14:04:48)
- VPP RC1 cut next week (mackonstan,
14:07:05)
- no HC update (mackonstan,
14:07:10)
- TSC - no TSC update (mackonstan,
14:07:18)
- LFN CXI Workshop 24,25-Mar at ONS in LA
(mackonstan,
14:16:19)
- Meeting details, agenda (mackonstan,
14:16:38)
- https://docs.google.com/spreadsheets/d/1enIRDPyAqo2ZgmErge7eOt28LvIWW4hKRH2KkjAIvSI/edit#gid=0
(mackonstan,
14:16:49)
- day1 notes etherpad (mackonstan,
14:17:01)
- https://public.etherpad-mozilla.org/p/infra_cicd_day1
(mackonstan,
14:17:11)
- day2 notes etherpad (mackonstan,
14:17:20)
- https://public.etherpad-mozilla.org/p/infra_cicd_day2
(mackonstan,
14:17:28)
- https://docs.google.com/presentation/d/1q9XxRkIbTV8N-gC9yaIiYu3qS9CdZP3G62TQyTZvWck/edit?usp=sharing
(mackonstan,
14:19:17)
- Operational status - Jenkins jobs (mackonstan, 14:20:06)
- csit-vpp-perf trending jobs - 12 tests are
failiing due to VAT errors and ssh timeouts (mackonstan,
14:26:43)
- similar observed on stable/1801 mrr trending
jobs that started today (mackonstan,
14:27:32)
- no other issues observed or reported
(mackonstan,
14:27:44)
- rls1801 follow-up (mackonstan, 14:27:55)
- 4 issues tracked - 1 resolved (vhost), 1 in
progress (ipsec), 2 in review with dpdk team (mackonstan,
14:32:54)
- DAve - wants to cut vpp-18.01.2 this week, but
happy to wait for 2 weeks to see if any firm conclusions from dpdk
review of vpp regressions, and if ipsec scale issue fixed
(mackonstan,
14:34:45)
- rls1804 plan (mackonstan, 14:35:38)
- plan tracked on wiki - pls update the
link (mackonstan,
14:42:19)
- https://wiki.fd.io/view/CSIT/csit1804_plan
(mackonstan,
14:42:27)
- Centos7 VIRL tests blocked by this jira:
(mackonstan,
14:42:41)
- https://jira.fd.io/browse/CSIT-1015
(mackonstan,
14:42:49)
- DMM extensions discussions - Adarsh
(mackonstan,
14:51:08)
- https://gerrit.fd.io/r/#/c/11286/
(mackonstan,
14:51:47)
- CSIT framework developments (mackonstan, 14:53:23)
- vpp perf trending:
https://docs.fd.io/csit/master/trending/ (mackonstan,
14:57:29)
- https://docs.fd.io/csit/master/trending/
(mackonstan,
14:57:32)
- job duration analysis (mackonstan, 14:59:05)
- https://docs.google.com/document/d/1SbIwRUYtgmcluKOa47ATojlqTTOPwfP4AUguh7cgGyU/edit?usp=sharing
(mackonstan,
14:59:15)
- https://docs.google.com/document/d/1LXPO5LyG7LfZk6synZ-LRD3KjHYzn9VUZgjZIYCCnhM/edit?usp=sharing
(mackonstan,
14:59:23)
- ACTION: Maciek and Ed
K to section the job tasks and corresponding duration (mackonstan,
14:59:59)
- FD.io CSIT lab infra updates - XEON Skylake servers (mackonstan, 15:02:00)
- need to vote on the lab HLD sent by Maciek 2
weeks ago (mackonstan,
15:02:25)
- ARM additions to CSIT labs (mackonstan, 15:03:10)
- Ed - arm machines plugged in, enabling
ubuntu16.04 build jobs (mackonstan,
15:03:49)
- VIRL platform infra (mackonstan, 15:04:18)
- tb4-virl3 - in testing for Centos7 (mackonstan,
15:04:51)
- FD.io CSIT lab extensions proposal (mackonstan, 15:14:29)
- high-level design distributed 2 weeks ago, all
csit-dev contributors should review - approval vote on the list on
Thu 29-Mar (mackonstan,
15:15:04)
- ttps://lists.fd.io/g/csit-dev/message/2499
(mackonstan,
15:15:14)
- once approved, need to produce a low-level
design similar to the original FD.io CSIT lab LLD (mackonstan,
15:15:46)
- https://wiki.fd.io/view/CSIT/CSIT_LF_testbed
(mackonstan,
15:15:53)
- followed by a live review with LF IT team that
will be conducting the physical installation (mackonstan,
15:16:16)
- ETA for physical installation w/c 16-Apr or
23-Apr, assuming all equipment arrives (mackonstan,
15:16:47)
Meeting ended at 15:16:51 UTC
(full logs).
Action items
- Maciek and Ed K to section the job tasks and corresponding duration
People present (lines said)
- mackonstan (54)
- collabot` (4)
- vrpolak (2)
- jgelety1 (1)
- dwallacelf (1)
- selias (1)
- tifrank (1)
Generated by MeetBot 0.1.4.