#fdio-csit: 28-Mar FD.io CSIT Project Meeting

Meeting started by mackonstan at 14:02:15 UTC (full logs).

Meeting summary

    1. Jan Gelety (jgelety1, 14:02:23)
    2. Samuel Elias (selias, 14:02:26)
    3. Vratko Polak (vrpolak, 14:02:40)
    4. Tibor Frank (tifrank, 14:02:42)
    5. Dave Wallace (dwallacelf, 14:02:55)

  1. Agenda bashing (mackonstan, 14:03:41)
  2. Inputs from LF and FD.io projects (mackonstan, 14:03:53)
    1. DaveW - VPP - API freeze last week, no issues reported (mackonstan, 14:04:48)
    2. VPP RC1 cut next week (mackonstan, 14:07:05)
    3. no HC update (mackonstan, 14:07:10)
    4. TSC - no TSC update (mackonstan, 14:07:18)
    5. LFN CXI Workshop 24,25-Mar at ONS in LA (mackonstan, 14:16:19)
    6. Meeting details, agenda (mackonstan, 14:16:38)
    7. https://docs.google.com/spreadsheets/d/1enIRDPyAqo2ZgmErge7eOt28LvIWW4hKRH2KkjAIvSI/edit#gid=0 (mackonstan, 14:16:49)
    8. day1 notes etherpad (mackonstan, 14:17:01)
    9. https://public.etherpad-mozilla.org/p/infra_cicd_day1 (mackonstan, 14:17:11)
    10. day2 notes etherpad (mackonstan, 14:17:20)
    11. https://public.etherpad-mozilla.org/p/infra_cicd_day2 (mackonstan, 14:17:28)
    12. https://docs.google.com/presentation/d/1q9XxRkIbTV8N-gC9yaIiYu3qS9CdZP3G62TQyTZvWck/edit?usp=sharing (mackonstan, 14:19:17)

  3. Operational status - Jenkins jobs (mackonstan, 14:20:06)
    1. csit-vpp-perf trending jobs - 12 tests are failiing due to VAT errors and ssh timeouts (mackonstan, 14:26:43)
    2. similar observed on stable/1801 mrr trending jobs that started today (mackonstan, 14:27:32)
    3. no other issues observed or reported (mackonstan, 14:27:44)

  4. rls1801 follow-up (mackonstan, 14:27:55)
    1. 4 issues tracked - 1 resolved (vhost), 1 in progress (ipsec), 2 in review with dpdk team (mackonstan, 14:32:54)
    2. DAve - wants to cut vpp-18.01.2 this week, but happy to wait for 2 weeks to see if any firm conclusions from dpdk review of vpp regressions, and if ipsec scale issue fixed (mackonstan, 14:34:45)

  5. rls1804 plan (mackonstan, 14:35:38)
    1. plan tracked on wiki - pls update the link (mackonstan, 14:42:19)
    2. https://wiki.fd.io/view/CSIT/csit1804_plan (mackonstan, 14:42:27)
    3. Centos7 VIRL tests blocked by this jira: (mackonstan, 14:42:41)
    4. https://jira.fd.io/browse/CSIT-1015 (mackonstan, 14:42:49)
    5. DMM extensions discussions - Adarsh (mackonstan, 14:51:08)
    6. https://gerrit.fd.io/r/#/c/11286/ (mackonstan, 14:51:47)

  6. CSIT framework developments (mackonstan, 14:53:23)
    1. vpp perf trending: https://docs.fd.io/csit/master/trending/ (mackonstan, 14:57:29)
    2. https://docs.fd.io/csit/master/trending/ (mackonstan, 14:57:32)

  7. job duration analysis (mackonstan, 14:59:05)
    1. https://docs.google.com/document/d/1SbIwRUYtgmcluKOa47ATojlqTTOPwfP4AUguh7cgGyU/edit?usp=sharing (mackonstan, 14:59:15)
    2. https://docs.google.com/document/d/1LXPO5LyG7LfZk6synZ-LRD3KjHYzn9VUZgjZIYCCnhM/edit?usp=sharing (mackonstan, 14:59:23)
    3. ACTION: Maciek and Ed K to section the job tasks and corresponding duration (mackonstan, 14:59:59)

  8. FD.io CSIT lab infra updates - XEON Skylake servers (mackonstan, 15:02:00)
    1. need to vote on the lab HLD sent by Maciek 2 weeks ago (mackonstan, 15:02:25)

  9. ARM additions to CSIT labs (mackonstan, 15:03:10)
    1. Ed - arm machines plugged in, enabling ubuntu16.04 build jobs (mackonstan, 15:03:49)

  10. VIRL platform infra (mackonstan, 15:04:18)
    1. tb4-virl3 - in testing for Centos7 (mackonstan, 15:04:51)

  11. FD.io CSIT lab extensions proposal (mackonstan, 15:14:29)
    1. high-level design distributed 2 weeks ago, all csit-dev contributors should review - approval vote on the list on Thu 29-Mar (mackonstan, 15:15:04)
    2. ttps://lists.fd.io/g/csit-dev/message/2499 (mackonstan, 15:15:14)
    3. once approved, need to produce a low-level design similar to the original FD.io CSIT lab LLD (mackonstan, 15:15:46)
    4. https://wiki.fd.io/view/CSIT/CSIT_LF_testbed (mackonstan, 15:15:53)
    5. followed by a live review with LF IT team that will be conducting the physical installation (mackonstan, 15:16:16)
    6. ETA for physical installation w/c 16-Apr or 23-Apr, assuming all equipment arrives (mackonstan, 15:16:47)


Meeting ended at 15:16:51 UTC (full logs).

Action items

  1. Maciek and Ed K to section the job tasks and corresponding duration


People present (lines said)

  1. mackonstan (54)
  2. collabot` (4)
  3. vrpolak (2)
  4. jgelety1 (1)
  5. dwallacelf (1)
  6. selias (1)
  7. tifrank (1)


Generated by MeetBot 0.1.4.