#fdio-csit: FD.io CSIT Project Meeting
Meeting started by mackonstan at 14:00:17 UTC
(full logs).
Meeting summary
-
- mackonstan (mackonstan,
14:00:28)
- Tibor Frank (tifrank,
14:00:53)
- Vratko Polak. (vrpolak,
14:01:00)
- Marek Gradzki (mgradzki,
14:01:40)
- Peter Mikus (pmikus1,
14:01:56)
- Agenda bashing (mackonstan, 14:02:50)
- Inputs from LFN and FD.io projects (mackonstan, 14:03:47)
- Tom Herbert (tfherbert,
14:07:17)
- VPP - dpdk18.05 performance regression - still
open - Ray Kinsella is following with the team (mackonstan,
14:07:36)
- HC - Marek - moving fwd with 1807, new features
srv6. (mackonstan,
14:08:12)
- FD.io docs working group (mackonstan, 14:08:32)
- Jan Gelety (jgelety1,
14:10:31)
- CSIT operational status - LF infra (mackonstan, 14:11:54)
- sporadic VIRL failures - simulations spinning
slowly under load. (mackonstan,
14:13:11)
- VPP code performance (mackonstan, 14:13:49)
- agreed to make PA jjb to send auto update email
to vpp-dev and csit-dev with summary of detection failures and
detected regressions and progressions (mackonstan,
14:33:13)
- https://docs.fd.io/csit/master/trending/introduction/index.html
(mackonstan,
14:33:28)
- https://docs.fd.io/csit/master/trending/introduction/failures.html
(mackonstan,
14:33:36)
- Releases (mackonstan, 14:34:03)
- rls1804 known issues updates: (mackonstan,
14:34:22)
- Ligato/K8s - Peter - integrated latest updates
from Ligato into master incl. vpp-agent, and observing same
failures (mackonstan,
14:35:09)
- rls1807 plan (mackonstan, 14:36:02)
- https://wiki.fd.io/view/CSIT/csit1807_plan (mackonstan,
14:36:10)
- New integration tests\ (mackonstan, 14:37:35)
- VPP_Device: design, tests on 1-Node testbeds -
Peter creating topology template for this. (mackonstan,
14:38:56)
- VPP_Device: Arm - Sirshak - trying to get more
machines. (mackonstan,
14:40:14)
- VPP_Path: CSIT_VIRL migration progressing (mackonstan, 14:42:09)
- See "goo.sheet" - more eager brains+hands
needed!! (mackonstan,
14:42:17)
- Juraj, Sirshak - reporting VPP_make_test as
slow - single run 90min to complete.. (mackonstan,
14:44:47)
- make verify on Xeon vs. Arm: ~45..55min vs.
~90min. (mackonstan,
14:46:16)
- VPP_Path_Device: tests for new 3-Node and 2-Node Skl and Arm testbeds (mackonstan, 14:47:35)
- new topology files done by Peter (Skl), Sirshak
(Arm). (mackonstan,
14:48:00)
- 2-Node testbeds - Tibor has been inventorizing
RF KWs changes (mackonstan,
14:48:23)
- Tibor has filed jiras for above. (mackonstan,
14:49:32)
- (mackonstan, 14:49:40)
- Analytics: Anomaly detection. (mackonstan, 14:49:46)
- Vratko - no visible update, waiting for
PAL. (mackonstan,
14:50:22)
- 2-node toplogy - Keywords: (tifrank,
14:50:52)
- Analytics: Per VPP patch vs. parent performance tests and voting (mackonstan, 14:50:53)
- https://jira.fd.io/browse/CSIT-1142
(tifrank,
14:50:59)
- 2-node toplogy - Tests: (tifrank,
14:51:07)
- https://jira.fd.io/browse/CSIT-1170
(tifrank,
14:51:12)
- Vratko - still work in progress (mackonstan,
14:51:33)
- PAL: Performance trending. (mackonstan, 14:51:46)
- Tibor - implemented new BurstMRR into
PAL. (mackonstan,
14:52:02)
- is under test, merging by eow. (mackonstan,
14:52:13)
- VAT to PAPI - time for baby steps? (mackonstan, 14:54:31)
- need a plan :) (mackonstan,
14:54:37)
- New MDR/MLR search intro into CSIT production (mackonstan, 14:55:31)
- need to resolve the pypi MLRsearch issue
(mackonstan,
14:57:55)
- New FD.io CSIT lab (mackonstan, 15:00:04)
- see links in meeting agenda for latest
status. (mackonstan,
15:00:28)
- CSIT commissioning status - Peter - two issues:
i) one server with failed SSD, ii) one server with failing PXE
boot. (mackonstan,
15:00:59)
- Peter - 11 of 13 powered servers are
installed. (mackonstan,
15:01:45)
- Arm additions (mackonstan, 15:02:19)
- Sirshak - no updates. (mackonstan,
15:03:29)
Meeting ended at 15:03:31 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (50)
- tifrank (5)
- collabot_ (4)
- mgradzki (1)
- vrpolak (1)
- jgelety1 (1)
- pmikus1 (1)
- tfherbert (1)
Generated by MeetBot 0.1.4.