    1. Peter Mikus (pmikus1, 14:00:04)
    2. Tibor Frank (tifrank, 14:00:16)

  1. Agenda bashing. (pmikus1, 14:00:57)
    1. Jan Gelety (jgelety, 14:01:16)
    2. Vratko Polak (vrpolak, 14:01:34)
    3. Marek Gradzki (mgradzki, 14:02:35)
    4. Juraj Linkes (jlinkes, 14:03:42)

  2. Inputs from LFN and FD.io projects (pmikus1, 14:03:49)
    1. VPP: release 1807 is out (pmikus1, 14:04:00)
    2. HoneyComb: release is next week (pmikus1, 14:04:31)
    3. DMM: Document in progress, uploaded to gerrit (pmikus1, 14:05:12)
    4. TCS: nothing related to CSIT (pmikus1, 14:06:17)
    5. DMM doc link: https://gerrit.fd.io/r/#/c/13872/ (sharath, 14:06:52)

  3. : CSIT operational status (pmikus1, 14:07:08)
    1. several tickets opened and tracked regarding Skylakes TB, nothing else reported (pmikus1, 14:08:57)

  4. : VPP code performance (pmikus1, 14:09:33)
    1. Performance trending summary: L2xc, l2bd, ip4 ok, memif small degradation reported by Damjan (pmikus1, 14:12:19)
    2. Alerting to mailgroup functionality postponed now (pmikus1, 14:12:45)

  5. Releases: (pmikus1, 14:12:56)
    1. rls1807 covered, on track (pmikus1, 14:14:54)
    2. Per patch testing: tested on 2-node x710 NIC, so far looks ok and stable, different topologies results in more/less stable results. Currently cleaning code. (pmikus1, 14:16:11)
    3. Per VPP patch progress: 2node x710 tests look stable enough for now. Code rewrite in progress, ETA Friday. (vrpolak, 14:17:33)
    4. Job scheduling: rls1807 (pmikus1, 14:17:50)
    5. Job scheduling https://docs.google.com/spreadsheets/d/1kuzq7UFwOvwd7TY1ZQpPUPZtWXeekvCLeLTlXXCdAIE/edit#gid=746162336 (pmikus1, 14:18:04)
    6. Framework (pmikus1, 14:19:22)
    7. VPP_Device 1-Node testbed design, TWS calls. On track separately (pmikus1, 14:20:18)
    8. VPP_Path: CSIT_VIRL migration progress. (pmikus1, 14:22:29)
    9. VPP_Path_Device: tests for new 3-Node and 2-Node Skx - executing subset of tests (pmikus1, 14:22:52)
    10. More skylakes test will come in 18.10 (pmikus1, 14:23:21)
    11. ARM: Currently not executing VPP_Path nor VPP_device (pmikus1, 14:23:59)
    12. ARM: Issues with TG node on VPP_Path_Device (pmikus1, 14:24:56)
    13. : T33- TG rebooted, ublocked now (pmikus1, 14:27:25)
    14. VPP code performance monitoring: (pmikus1, 14:27:48)
    15. VAT to PAPI - time for baby steps (pmikus1, 14:28:02)
    16. Tests (pmikus1, 14:28:31)
    17. All testcases were migrated to MLR (pmikus1, 14:28:52)
    18. Currently: MRR is missing for Kubernetes (pmikus1, 14:30:33)
    19. : Willbe delivered in rls1810 (pmikus1, 14:30:44)
    20. MLR further optimization in repo for the review, did not make it on time due to TB occupied (pmikus1, 14:31:24)

  6. FD.io CSIT lab infra. (pmikus1, 14:32:51)
    1. skylakes operational apart 2TB which have faulty HW - tracked on VEXX (pmikus1, 14:34:13)
    2. ARM not ready yet (pmikus1, 14:34:26)
    3. 4 * mcx556a-edat NICs arrived (pmikus1, 14:35:04)
    4. ARM SoC no remote power managent (pmikus1, 14:36:58)

  7. DMM CSIT status. (pmikus1, 14:37:44)
    1. Job operational, test are ok (pmikus1, 14:37:52)
    2. VPP_Path (make test) parallelization being tested. Need someone to review the patch. (pmikus1, 14:39:30)
    3. ARM: https://jira.fd.io/browse/VPP-1371 (pmikus1, 14:44:09)


Meeting ended at 14:47:03 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. pmikus1 (44)
  2. collabot (6)
  3. vrpolak (3)
  4. mgradzki (1)
  5. sharath (1)
  6. jgelety (1)
  7. jlinkes (1)
  8. tifrank (1)
  9. Mikus (0)
  10. Peter (0)


Generated by MeetBot 0.1.4.