====================================== #fdio-csit: FD.io CSIT project meeting ====================================== Meeting started by mackonstan at 14:01:41 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/fdio-csit/2018/fdio-csit.2018-09-19-14.01.log.html . Meeting summary --------------- * Jan Gelety (jgelety, 14:01:47) * Juraj Linkeš (jlinkes, 14:01:54) * Peter Mikus (pmikus, 14:01:55) * Vratko Polak (vrpolak, 14:01:59) * Agenda bashing (mackonstan, 14:03:45) * Inputs from LFN and FD.io projects (mackonstan, 14:05:10) * VPP - API freeze in 2 weeks time (mackonstan, 14:07:58) * HoneyComb - Michal updating - CSIT tests still failing, work in progress, have line of sight (mackonstan, 14:08:30) * CSIT operational status (mackonstan, 14:09:15) * move from nexus to packagecloud.io went smoothly (mackonstan, 14:10:52) * issue with jjb not being verified - helpdesk ticket by Tibor (mackonstan, 14:11:36) * ci-management-verify-jjb is failing: FD.io Helpdesk #61074 (pmikus, 14:13:02) * make test issues resolved.. but bionic make tests are failing (mackonstan, 14:13:11) * Juraj - still some hiccups on Arm, tests executed properly, but many tests are failing (mackonstan, 14:14:21) * VPP code performance (mackonstan, 14:14:54) * many tests are failing for a while now mainly link bonding (mackonstan, 14:16:56) * suspected root cause is interface up/down api issue vpp-1361 based on Peter's logs pointing to DPDK driver issue (mackonstan, 14:18:30) * Maciek to contact Ray and get advice how to drive the resolution (mackonstan, 14:19:15) * LINK: https://docs.fd.io/csit/master/trending/introduction/failures.html#n-hsw (mackonstan, 14:19:27) * LINK: https://docs.fd.io/csit/master/trending/introduction/failures.html#n-skx (mackonstan, 14:19:37) * LINK: https://docs.fd.io/csit/master/trending/introduction/failures.html#id1 (mackonstan, 14:20:05) * some degradation for l3fwd (mackonstan, 14:22:53) * red cases require investigation (mackonstan, 14:23:17) * Alerting to csit-report] almost done by Tibor, will send template email for review to csit-dev (mackonstan, 14:25:35) * and to vpp-dev (mackonstan, 14:25:47) * CSIT Releases (mackonstan, 14:26:05) * CSIT-18.07 known issues updates (mackonstan, 14:26:42) * VPP-1361 logs with DPDK guys (mackonstan, 14:27:01) * CSIT-1266 and CSIT-1267 issues fixed. (mackonstan, 14:28:45) * CSIT-1266 data can be easily refreshed in next rev of CSIT-18.07 report (mackonstan, 14:31:01) * CSIT-1267 requires more care, Tibor will analyse possible options (mackonstan, 14:31:47) * likely to require using database instead of Nexus (mackonstan, 14:34:21) * Tibor to look at dbase choices (relational?) and then we can test waters with LF (mackonstan, 14:35:55) * CSIT-18.10 plan (mackonstan, 14:37:53) * Matus will link jira epics to wiki (mackonstan, 14:38:03) * LINK: https://wiki.fd.io/view/CSIT/csit1810_plan (mackonstan, 14:38:13) * CSIT-18.10 F0 in 2 weeks time (mackonstan, 14:38:55) * New test environments (mackonstan, 14:41:13) * VPP_Device 1-Node - Peter provided summary, next TWS call tomorrow (mackonstan, 14:41:53) * VPP_Path: CSIT_VIRL migration progress - no update (mackonstan, 14:45:32) * VPP_Path_Device: tests for new 2-Node Skx - Jan making very good progress, most of them are in trending as matching existing tags (mackonstan, 14:46:09) * tests with new tags would need to be coded into PAL trending (mackonstan, 14:46:27) * VPP_Path_Device: tests for new Arm - Juraj updating - Huawei taischan - kamendra kumar driving this work, encountering some issues (mackonstan, 14:48:42) * khemendra kumar (mackonstan, 14:50:55) * Analytics: Per VPP patch vs. parent - Vratko - collecting data, number of false positives, waiting till next week for enough data to analyze and decide on next steps (mackonstan, 14:52:20) * PAL: Performance trending - Vratko - moved to 10x1sec BMRR tests. time to ask PAL to look at stdev for increased detection precision (mackonstan, 14:54:23) * PAL: adding "vpp show run" - Ole Troan confirmed that vpp stats infra is ready for prime time, still working on show run equivalent conteint (mackonstan, 14:55:56) * VAT to PAPI - time for (more than) baby steps in CSIT-18.10.. (mackonstan, 14:56:11) * VAT to PAPI - time for (more than) baby steps in CSIT-18.10.. (mackonstan, 14:56:20) * Peter working on proposal (mackonstan, 14:58:21) * TRex (mackonstan, 14:58:53) * no update (mackonstan, 14:58:57) * New FD.io CSIT lab - Xeons, Arm, Atom (mackonstan, 14:59:19) * All Xeon motherboard RMAs arrived, to be installed (mackonstan, 14:59:52) * LF IT / Anton proceeding with install with Peter supervision (mackonstan, 15:00:17) * bios upgrade on Xeon 1-node as no NICs seen (mackonstan, 15:00:29) Meeting ended at 16:00:03 UTC. People present (lines said) --------------------------- * mackonstan (56) * collabot (4) * pmikus (2) * vrpolak (1) * jgelety (1) * jlinkes (1) Generated by `MeetBot`_ 0.1.4