#fdio-csit: FD.io CSIT project meeting

Meeting started by pmikus at 13:58:20 UTC (full logs).

Meeting summary

  1. Peaople presence (pmikus, 13:58:48)
  2. Peaople presence (pmikus, 13:59:03)
    1. Peter Mikus (pmikus, 13:59:36)
    2. Tibor Frank (tifrank, 13:59:37)
    3. Juraj Linkeš (jlinkes, 14:01:06)

  3. Agenda bashing (pmikus, 14:01:22)
    1. no inputs (pmikus, 14:02:37)

  4. Inputs from LFN and FD.io projects (pmikus, 14:02:53)
    1. DMM new patch , review in process (pmikus, 14:03:55)
    2. https://gerrit.fd.io/r/#/c/15189/ (pmikus, 14:04:41)

  5. CSIT operational status (pmikus, 14:05:11)
    1. VPP integration issue: server looses connectivity when frequently installing and uninstalling during single job. Investigation in progress. (pmikus, 14:07:42)

  6. VPP code performance (pmikus, 14:08:37)
    1. mackonstan (mackonstan, 14:10:01)
    2. alerting issue - Tibor update - attachment issue has been solved (mackonstan, 14:15:11)
    3. Tibor - alert emails generated after each trending jobs - one per testbed type, twice a day => 6 emails a day (mackonstan, 14:16:18)
    4. correction - avg 6 emails every 24hrs (mackonstan, 14:16:46)
    5. sent to csit-report fd.io mailer (mackonstan, 14:17:02)
    6. no updates (mackonstan, 14:18:29)
    7. https://wiki.fd.io/view/CSIT/csit1810_plan (mackonstan, 14:18:54)
    8. branch pulled by Jan (mackonstan, 14:19:39)
    9. https://git.fd.io/csit/log/?h=rls1810 (mackonstan, 14:19:56)
    10. rc2 date today (mackonstan, 14:21:49)
    11. Soak Tests Experimental - Vratko - still WIP and in gerrit draft. (mackonstan, 14:24:28)
    12. VPP_Device - Peter - successful job runs in LF FD.io sandbox - were successful. (mackonstan, 14:24:59)
    13. some issues with porting this to production Jenkins - Ed Kern. (mackonstan, 14:25:51)
    14. VPP_Device - Peter - initial implementation still WIP and in gerrit, but not draft. Few comments to be addressed, merge ETA before release close, hopefully. (mackonstan, 14:27:47)
    15. VPP_Path - is Open, but the concept of runing VIRL test cases on the new VPP_Device infra has been proven. Expecting to port most (or even all) VIRL tests, note however the first set will include 2-Node tests only. (mackonstan, 14:29:42)
    16. Expecting to port most (or even all) VIRL tests, note however the first set will include 2-Node tests only, in next release i.e. CSIT-1901. (mackonstan, 14:30:23)
    17. Per VPP Patch Performance Checks - Vratko - implemented next set of improvements, but his issue with VPP reinstall. If lucky it should be finished by official rls date (i.e. today +7days). (mackonstan, 14:31:18)
    18. CSIT PAPI Support - Peter on behalf on JanG - most of the work is good and done. Peter and Ole Troan are doing the PAPI keywords review. Remote execution of PAPI API calls (over REST or other) is the next feature request, not supported today in VPP. Will be part of PAPIv2. (mackonstan, 14:32:55)
    19. Graphs Layout Improvements - Tibor - moving to final state. Information clarity improvements for throughput, latency and speedup multicore. Gerrit patch ready for final review. (mackonstan, 14:34:25)
    20. https://gerrit.fd.io/r/15155 (tifrank, 14:34:34)
    21. mackonstan to provide proposed testcase grouping per graph instance in graphs_improvements.rst or separate file if many lines. (mackonstan, 14:37:57)
    22. Clock cycles per VPP node into CSIT-PAL - mackonstan - no update. (mackonstan, 14:38:36)
    23. Arm testbeds - Juraj - no status change. (mackonstan, 14:39:26)
    24. new TWS calls every Friday at the same time as Thursday TWS call.. (mackonstan, 14:40:39)
    25. mackonstan to update csit TWS call page with relevant details - calls are zoom (mackonstan, 14:41:04)
    26. https://wiki.fd.io/view/CSIT/TWS (mackonstan, 14:41:20)
    27. Atom testbeds - Yulong - due to the correct Denverton servers not arriving to LFN FD.io lab in time (mackonstan, 14:43:15)
    28. separate off-site 2-Node testbed is in operation, it's running CSIT framework with T-Rex (mackonstan, 14:43:49)
    29. generating output.xml files can be provided for inclusion into CSIT-18.10 report, with obvious disclaimer that all tests were not conducted within LFN FD.io physical infrastructure, but were done off-site at Intel premises using FD.io CSIT code as stored within FD.io project. (mackonstan, 14:45:27)
    30. Yulong shared a screen with MW Word doc listing the MRR and NDR throughput results. (mackonstan, 14:47:45)
    31. all results are based on VPP-18.10 rc2 (mackonstan, 14:49:01)
    32. Yulong will publish rc2 base test results data, ETA <24-Oct, if no issues. (mackonstan, 14:50:33)
    33. Peter - errors shown by Yulong may be due to old firmware in NIC cards, as similar was observed in CSIT testbeds. (mackonstan, 14:51:24)
    34. Peter - ASTF interactive progressed quite significantly, need to find time to analyse (mackonstan, 14:52:53)
    35. FD.io minii-summit before Kubecon US in Seattle, it's on Monday 10-Dec (mackonstan, 14:54:36)
    36. Trex releases https://github.com/cisco-system-traffic-generator/trex-core/blob/master/doc/release_notes.asciidoc (pmikus, 14:55:14)
    37. https://fd.io/event/fd-io-mini-summit-at-kubecon-cloudnativecon-seattle-wa/ (mackonstan, 14:55:35)
    38. https://docs.google.com/forms/d/e/1FAIpQLSf7q2XKYhsYYgqtCYOnisyu5RAfhQiKNHzrNugq0AqIXdHB-A/viewform (mackonstan, 14:55:56)
    39. looks like CFP may be still open (mackonstan, 14:56:05)
    40. Tibor Frank (tifrank, 14:00:09)
    41. Juraj Linkeš (jlinkes, 14:00:47)
    42. Peter Mikus (pmikus, 14:02:00)
    43. Jan Gelety (jgelety, 14:03:50)
    44. VPP - released today, we can can start testing (tifrank, 14:03:54)
    45. HoneyComb - func tests ready for 1810, no perf no present (tifrank, 14:04:55)
    46. DMM - https://gerrit.fd.io/r/#/c/15189/ ready for merge (tifrank, 14:07:08)
    47. LF infra - no issues (tifrank, 14:08:18)
    48. Performance trending - no issues (tifrank, 14:09:49)
    49. Soak Tests Experimental - ready (tifrank, 14:10:54)
    50. VPP_Device - code ready, execution in Jenkins WiP (tifrank, 14:11:35)
    51. Per VPP Patch Performance Checks - merged (tifrank, 14:11:59)
    52. CSIT PAPI Support - still WiP (tifrank, 14:13:02)
    53. Graphs Layout Improvements - WiP (tifrank, 14:14:04)
    54. ARM - testbeds ready, perf tests WiP (tifrank, 14:16:39)
    55. ARM HW in lab, needs to wired (tifrank, 14:19:49)
    56. Running tests: It will take 15 days in the best case, 19 days realistic (tifrank, 14:22:17)


Meeting ended at 14:23:28 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan (49)
  2. tifrank (24)
  3. pmikus (15)
  4. collabot (5)
  5. jlinkes (2)
  6. jgelety (1)