#fdio-csit: FD.io CSIT project meeting
Meeting started by mackonstan at 14:00:02 UTC
(full logs).
Meeting summary
- Agenda bashing (mackonstan, 14:01:08)
- Tibor Frank (tifrank,
14:01:17)
- Dave Wallace (dwallacelf,
14:01:35)
- Vratko Polak (vrpolak,
14:02:29)
- Jan Gelety (jgelety,
14:02:45)
- Inputs from LFN and FD.io projects (mackonstan, 14:03:18)
- VPP - Dave updating (mackonstan,
14:03:30)
- v19.04.1 artifacts published last Monday
(mackonstan,
14:03:44)
- can proceed with CSIT-1904_1 spotcheck
testing (mackonstan,
14:04:17)
- more patches went into vpp stable/19.01 after
v19.01.2 tag (mackonstan,
14:04:51)
- 1 patch in vpp stable/19.04 after v19.04.1
tag (mackonstan,
14:05:21)
- HC - Michal updating (mackonstan,
14:08:08)
- Not planning to migrate to vpp_device
(mackonstan,
14:08:38)
- Currently no new features planned for HC that
need to be tested (mackonstan,
14:09:11)
- Fine with VIRL shutdown - will manage testing
within HC project (mackonstan,
14:10:10)
- Operational status (mackonstan, 14:10:39)
- Tom Herbert (tfherbert,
14:11:00)
- Ed updating - LF infra working (mackonstan,
14:11:07)
- Maciek updating - LF IT/Vexxhost confirmed
s2-t12-sut1 (from 1n-skx testbed) is being replaced with spare, and
faulty server RMAed (mackonstan,
14:12:35)
- Tom updating - Centos CI in vpp_device - patch
submitted and rebased (mackonstan,
14:15:03)
- Peter comments - Tom's patch merged, some
additional fixes applied (mackonstan,
14:15:37)
- Centos vpp_device tests working now
(mackonstan,
14:15:52)
- next steps: test triggers, fix any issue
(mackonstan,
14:17:16)
- once working then enable for semi-weekly and
weekly execution (mackonstan,
14:17:40)
- then consider per patch (mackonstan,
14:17:57)
- VPP code performance (mackonstan,
14:18:22)
- VPP code performance (mackonstan, 14:18:38)
- Jan updating - currently perf mrr daily jobs
taking >24hrs and queue is building up (mackonstan,
14:20:35)
- side effect of two things: suite generator and
PAPI (mackonstan,
14:21:42)
- on average duration of MRR test increased from
~50sec to ~5min (mackonstan,
14:23:01)
- Jan update - it's 4-5 min per test case
(mackonstan,
14:23:45)
- Jan update - the root cause for PAPI slowness
is known - the issue is vpp.disconnect() where it is waiting util
timout is finishs - it is 5s (mackonstan,
14:29:18)
- Jan update - and it is done per PapiExecutor
session, it should be fixed with vpp socket connection (mackonstan,
14:30:08)
- Vratko - will test to see how much faster papi
over unix remote socket is vs. current PAPI scheme (mackonstan,
14:30:53)
- Maciek - propose to cut the number of tests, by
restricting them to specific NIC types: x520 and x710 to start
with. (mackonstan,
14:35:58)
- Vratko - replace existing complex expression
file, with a new one simple coarse filter matching on NIC types:
x520 and x710 to start with. (mackonstan,
14:37:35)
- Jan - note that ipsec QAT HW will require xl710
- can be re-added later (mackonstan,
14:38:01)
- Releases (mackonstan, 14:38:28)
- CSIT-1901.2 report - published (mackonstan,
14:39:09)
- https://docs.fd.io/csit/rls1901_2/report/
(mackonstan,
14:39:20)
- CSIT-1904 report - Tibor update - more data
added to the report, only 3n-hsw detailed tests (mackonstan,
14:40:28)
- https://docs.fd.io/csit/rls1904/report/introduction/report_history.html
(mackonstan,
14:40:39)
- CSIT-1908 plan (mackonstan,
14:41:17)
- Rasti working on jira Epics for
CSIT-1908 (mackonstan,
14:41:34)
- https://wiki.fd.io/view/CSIT/csit1908_plan
(mackonstan,
14:42:45)
- Developments (mackonstan, 14:43:02)
- Installer (mackonstan, 14:43:45)
- Dnv onboarding - Peter helping Luyong to
complete Dnv onboarding into jenkins (mackonstan,
14:44:11)
- Framework (mackonstan, 14:44:30)
- Tibor updating - VAT to PAPI - work progressing
quite well, some issues with counters using VPPstats (mackonstan,
14:45:15)
- using cli and VPPstats produces different
results - being investigated (mackonstan,
14:46:39)
- Jan working on IP libraries - some refactoring
required (mackonstan,
14:47:03)
- VPP-API "Flag Day" (mackonstan, 14:48:02)
- Dave - after review with Damjan had to abandon
the vpp patch tracking api changes. Updating the document to reflect
that. (mackonstan,
14:50:03)
- Dave - looking to switch from testing and
storing api files, and tracking CRCs per message. But these in turn
are not capturing complete api msgs including the metadata.
(mackonstan,
14:50:50)
- Dave - expecting the next rev of the draft
today/tomorrow (mackonstan,
14:53:20)
- Vratko - will adjust csit side implementation
accordingly. (mackonstan,
14:54:21)
- Test environments (mackonstan, 14:54:30)
- Sirshak - confirmed Juraj should be joining
next week, so work on Arm testbeds should restart (mackonstan,
14:55:32)
- New tests (mackonstan, 14:55:56)
- IPsec - Peter - redone IPsec tests, now
properly scaling up with multi-core (mackonstan,
14:56:31)
- TRex (mackonstan, 14:56:46)
- Peter - v2.54 is doing very well in production,
stable (mackonstan,
14:57:05)
- FD.io website (mackonstan, 14:59:31)
- moving to github driven web page (mackonstan,
14:59:43)
- TRex (mackonstan,
14:59:46)
- https://myfdio.netlify.com/projects/
(mackonstan,
14:59:56)
- https://github.com/jadenisco/fdiomain
(mackonstan,
15:00:21)
- above links are for sandbox (mackonstan,
15:00:27)
Meeting ended at 15:02:32 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (67)
- collabot` (4)
- vrpolak (1)
- dwallacelf (1)
- jgelety (1)
- tfherbert (1)
- tifrank (1)
Generated by MeetBot 0.1.4.