#fdio-csit: FD.io CSIT project meeting
Meeting started by mackonstan at 13:59:06 UTC
(full logs).
Meeting summary
-
- Juraj Linkeš (jlinkes,
13:59:54)
- Agenda bashing (mackonstan, 14:00:43)
- Vratko Polak. (vrpolak,
14:00:51)
- Jan Gelety (jgelety,
14:00:58)
- FD.io CSIT physical labs (mackonstan, 14:02:37)
- Peter Mikus (pmikus,
14:02:50)
- Dave Wallace (dwallacelf,
14:02:57)
- Maciek, Peter: Denverton testbeds are finally
working, test jobs are running, Ray and Luyong confirmed.
(mackonstan,
14:04:03)
- FD.io lab extension (mackonstan, 14:08:41)
- Maciek: provided update on the spec of lab
extension (mackonstan,
14:08:55)
- Following new servers are expected to arrive in
Jul/Aug: (mackonstan,
14:09:14)
- Servers: 7x SuperMicro 7049GP-TRT (4U), 3x
SuperMicro 1029P-WTRT (1U) (mackonstan,
14:09:23)
- Processors: 14x Cascade Lake Platinum 8280, 6x
Cascade Lake Gold 6252N (with priority based frequency, will arrive
later) (mackonstan,
14:09:32)
- NICs: 7x XXV710-DA2, 7x X710DA4 (mackonstan,
14:09:42)
- Proposed setup: i) Performance testbeds: 2x
2n-clx plus 1x 3n-clx, or 3x 2n-clx plus 1x 1n-clx, ii) Backends: 3x
SuperMicro 1029P-WTRT (mackonstan,
14:10:09)
- Propose to evaluate the pros/cons on the
csit-dev list (mackonstan,
14:16:36)
- Inputs from VPP (mackonstan, 14:16:57)
- Dave: v19.08 continues, no calls for
maintenance releases (mackonstan,
14:17:12)
- Inputs from HC (mackonstan, 14:17:29)
- it's quiet, no changes for CSIT (mackonstan,
14:18:19)
- Peter: 1908 plan for HC is unclear (mackonstan,
14:19:03)
- Inputs from TSC (mackonstan, 14:19:18)
- Vratko: week before last there was discussion
about ROI/efficiency of FD.io minisummits co-located with major
events. Calls for proposals for better, more efficient ways for
FD.io community get togethers (mackonstan,
14:21:38)
- Operational status (mackonstan, 14:22:09)
- Maciek: Jenkins maintenance last night UTC,
impacted perf-mrr-daily jobs (mackonstan,
14:23:27)
- Peter: jobs seem to be running (mackonstan,
14:23:40)
- Vratko: looks like there is still some memory
leak in the system, compile jobs are failing, merge jobs issues,
other symptoms, so expecting more maintenance (mackonstan,
14:24:48)
- Vratko, Ed: admins are adding more logs to
track down the memory leak issue (mackonstan,
14:26:28)
- above issues were happening before the
maintenance (mackonstan,
14:31:53)
- so far no issues observed after the
maintenance (mackonstan,
14:32:03)
- Centos CI (mackonstan, 14:33:40)
- Peter: need a separate job for Centos7, need to
enable it in Nomad env on 1n-skx. Should not require any changes to
Nomad env, job should just work, will report if issues. (mackonstan,
14:36:30)
- Jan: two issues in trending: i) ip6 fib scale
tests failing, bug in VPP VAT fixed by Neale; ii) ip route api
parameter name change was missed in CSIT code, now fixed, some side
fix required in VPP code too; iii) vxlan scale test are failing due
to PAPI not good with handling scale, moving back to VAT as for all
other scale tests (mackonstan,
14:40:02)
- VPP code performance (mackonstan, 14:40:14)
- patchy coverage due fib api issue per above,
and jenkins issues (mackonstan,
14:41:50)
- Framework: VAT to PAPI migration (mackonstan, 14:42:49)
- Vratko: see email with implementation
steps (mackonstan,
14:43:08)
- Vratko: already know that CSIT scale tests do
not work with PAPI, ip4 fib 200k takes >30min with synch PAPI
and 10min with remote socket, show stopper for usage of PAPI
(mackonstan,
14:44:38)
- Vratko: async mode may help to bring the time
down, but expecting issues so unlikely to get it working in
1908 (mackonstan,
14:47:38)
- Vratko: another issue is specific to Centos -
remote socket PAPI uses ssh tunnel, and this seems to be not
supported in Centos7 (mackonstan,
14:49:29)
- VAT-to-PAPI migration on track to be finished
this release cycle (jgelety,
14:50:36)
- Framework: VPP-API "Flag Day" gate-keeping (mackonstan, 14:51:47)
- Vratko: will be able to make progress on it
once remote socket PAPI is in production (mackonstan,
14:52:06)
- Dave: still need to update the proposed process
doc (mackonstan,
14:52:25)
- Test environments - VPP_Device environment (mackonstan, 14:52:50)
- Juraj: Arm onboarding, having issues with
understanding how the pipeline works, as the process is unclear,
lacking documentation (mackonstan,
14:53:51)
- Juraj: posted a pull request to add Arm to
VPP_device environment (mackonstan,
14:57:00)
- Peter: need to complete review of Juraj's pull
request, run tests, and if okay merge (mackonstan,
14:58:47)
- Peter: ongoing issue is lack of
documentation (mackonstan,
14:59:07)
- let's drive the conclusion over email, if not
converging then separate TWS call (mackonstan,
14:59:48)
- Vratko: discussion on slack with Denverton team
want to remove tests that are running daily on Denverton
(mackonstan,
15:01:34)
- Vratko: awaiting patch from Denverton team
side (mackonstan,
15:01:52)
- Vratko: e.g. some scale tests can not run on
some platforms (mackonstan,
15:02:51)
Meeting ended at 15:03:41 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (50)
- collabot` (4)
- jgelety (2)
- pmikus (1)
- vrpolak (1)
- jlinkes (1)
- dwallacelf (1)
Generated by MeetBot 0.1.4.