14:03:06 <mackonstan> #startmeeting FD.io CSIT project meeting 14:03:06 <collabot`> Meeting started Wed Jul 24 14:03:06 2019 UTC. The chair is mackonstan. Information about MeetBot at http://wiki.debian.org/MeetBot. 14:03:06 <collabot`> Useful Commands: #action #agreed #help #info #idea #link #topic. 14:03:06 <collabot`> The meeting name has been set to 'fd_io_csit_project_meeting' 14:03:16 <dwallacelf> #info Dave Wallace 14:03:19 <mackonstan> #topic Agenda bashing 14:03:21 <mackonstan> #chair 14:03:21 <collabot`> Current chairs: mackonstan 14:03:26 <jlinkes> #info Juraj Linkeš 14:03:29 <vrpolak> #info Vratko Polak. 14:04:16 <pmikus> #info Peter Mikus 14:04:27 <mackonstan> #topic FD.io CSIT lab infrastructure (up to 15min) 14:06:14 <mackonstan> #info Maciek: new HW should have arrived, at least partially 14:06:37 <mackonstan> #info Mohammed: in fact all HW arrived, servers with motherboards, Processors, NICs 14:06:57 <mackonstan> #into Mohammed: build servers already racked and installed 14:07:08 <mackonstan> #info Mohammed: build servers already racked and installed 14:07:30 <mackonstan> #info Mohammed: awaiting low level design for configuration the testbeds 14:10:41 <mackonstan> #info Mohammed: 14 x clx-8280, 6 x 6252N 14:16:40 <mackonstan> #info Maciek: proposal to use 6252N on SUTs for 2n-clx, for consistency, vs. mixing 6252N and 8280 on SUTs. 14:16:45 <mackonstan> #info Vratko: +1 14:22:52 <mackonstan> #info Mohammed: number of questions re Linux and disk partitioning/RAID. Will send email to the list. 14:23:39 <mackonstan> #info Mohammed: failed processors, skx, need to confirm RMA procedure. Will send email to Trishan, Maciek, Ray Kinsella. 14:24:48 <mackonstan> #info Maciek: will push patch with proposed clx testbed setup to gerrit and announce on csit-dev 14:24:53 <mackonstan> #topic Inputs from LFN and FD.io projects 14:25:09 <mackonstan> #topic VPP 14:25:43 <mackonstan> #info Dave: vpp v19.01.3 published last Friday. 14:26:19 <mackonstan> #info Peter: heard from Jan that csit-1901.3 tests are complete. Report to be generated. 14:26:40 <mackonstan> #info Dave: vpp v19.04.2 is to be published by eow. 14:27:07 <mackonstan> #info Dave: v19.08 f0 milestone is next Wed 31-Jul 14:30:09 <vrpolak> #info The name of the new gating job is: vpp-csit-verify-api-crc-{stream} 14:30:35 <mackonstan> #info Dave: vpp call yesterday, discussed and agreed to start running vpp-csit-verify-api-crc*, with voting, job starts on 30-Jul, if false positives handle with manual override 14:31:59 <mackonstan> #topic HC 14:34:08 <mackonstan> #info still open is how to handle orphaned L1 KWs used by HC, as HC tests got now out of sync with VPP master and not running - discussion on the list. 14:34:42 <mackonstan> #info Maciek to start thread on csit-dev 14:35:04 <mackonstan> #topic TSC 14:35:13 <mackonstan> #info no updates 14:35:24 <mackonstan> #topic Operational status 14:36:37 <mackonstan> #info trending analytics job is running out of memory, so trending graphs results not displayed 14:37:24 <mackonstan> #info Vratko: increased the memory few times but still out of memory, most likely due to excessive data produced by tests due to using PAPI vs. VAT 14:37:39 <mackonstan> #info waiting for Tibor to have a proper look, Tibor is back next week 14:39:46 <mackonstan> #info API coverage - Vratko: based on verify-api-crc work now have a good view of api's used by csit, but it's early days, once we enable api-crc gating job, this will drive api coverage evaluation 14:40:17 <mackonstan> #topic VPP code performance 14:40:33 <mackonstan> #info need trending analytics to work again to compare and see if any anomalies 14:40:42 <mackonstan> #topic Releases 14:42:15 <mackonstan> #info Dave: working on tcp tests for 1908, some risk due to PTO in the way 14:42:35 <mackonstan> #info Dave: refactoring wrk tests 14:42:41 <mackonstan> #info Dave: not planning QUIC tests. 14:43:57 <mackonstan> #info VAT-to-PAPI: Andrej: issues with LISP but fixed now (issue was with VAT not checking retval, and PAPI does, some refactoring) 14:47:00 <mackonstan> #info VAT-to-PAPI: policer wip, tap wip. 14:47:46 <mackonstan> #info VAT-to-PAPI: scale tests still running on VAT 14:49:31 <mackonstan> #info Arm - Juraj: dev and perf tests, not done yet, but very close, need to clean up images, aiming to have it working in time for 1908. Currently running arm mrr-daily, but failing at the moment, patch wip. 14:50:39 <mackonstan> #info Arm - Juraj: device tests, fixing executing image. 14:52:35 <mackonstan> #info Arm - Juraj: device tests, only one server right now, looking to add 2nd server. 14:53:11 <mackonstan> #info Arm - Juraj: device tests going ahead with 1 server for csit-vpp-verify non-voting jobs for now. Need 2nd server to do the same for vpp-csit-verify 14:53:55 <mackonstan> #topic evelopments 14:54:02 <mackonstan> #topic Developments 14:55:29 <mackonstan> #info move to Python 3.5 (post PAPI migration): need to start this post pulling the branch for 1908 14:55:52 <mackonstan> #info Dave: VPP is already working on this: Paul, Naveen, Ole. 14:56:53 <mackonstan> #info New RF tags proposal - looking for finalize this shortly, but implementation post 1908 14:58:32 <mackonstan> #info L1 KWs alignment between -func/-dev and -perf - Peter: setup, teardown aligned, most tests are too, few test specific Kws in progress, see updated google docs 14:59:39 <mackonstan> #topic New tests 15:00:01 <mackonstan> #info IPsec scale tests - Peter: added 40k and 60k tests, after verifying vpp fix from Neale 15:00:19 <mackonstan> #info VXLAN tests on 2-node - Peter: tests running and reviewing the results 15:01:35 <mackonstan> #info NFV density - IPsec - Peter: in 3-node setup, also going up to 40k and 60k over multiple containers 15:02:15 <mackonstan> #topic TRex 15:02:46 <mackonstan> #info Vratko: TRex running now with HDRhistogram, will be collecting the data, and in the future will process. 15:03:25 <pmikus> #link https://drive.google.com/file/d/1wu-ZxrFoiaLFtWdxHrkQO-pzgk6ysa8I/view?usp=sharing 15:04:07 <mackonstan> #info Maciek on PTO from next week for 2.5 weeks 15:04:11 <mackonstan> #endmeeting