#fdio-csit: FD.io CSIT project meeting
Meeting started by mackonstan at 14:57:12 UTC
(full logs).
Meeting summary
- Agenda bashing (mackonstan, 15:00:44)
- Vratko Polak. (vrpolak,
15:02:17)
- FD.io CSIT physical labs (mackonstan, 15:03:03)
- Dave Wallace (dwallacelf,
15:03:45)
- PM: one 2n-skx testbed is down, reporting
read-only ssd error, similar to before. (mackonstan,
15:03:52)
- Jan Gelety (jgelety,
15:04:04)
- PM, VP: 2n-clx testbeds are fully in operation.
one testbed is missing mlx5 nics. e.g. need to have a separate job
for mlx5 tests. (mackonstan,
15:06:32)
- ACTION: MK: ask
Trishan to order 2 mlx5 NICs, matching models in the lab.
(mackonstan,
15:07:05)
- Inputs from LFN and FD.io projects - VPP (mackonstan, 15:07:40)
- DW: for 19.08 still didn't sync up with Andrew
re next maintenance release. (mackonstan,
15:08:21)
- DW: lots of patches (100s) cherry-picked into
stable/1908 since 19.08.1 tag. Proposing a weekly trending
performance tests, with associated web-pages and notification emails
to csit-report (summary of failures, regressions,
progressions). (mackonstan,
15:12:07)
- ACTION: DW: to review
trending test with vpp community, as well as regular cadence for LTS
maintenance releases. (mackonstan,
15:13:10)
- DW: re v19.04.3 maintenance release - not
seeing value in executing CSIT perf tests on this minor
release. (mackonstan,
15:14:17)
- JG: showing xls summary of physical testbeds
used for 1908.1 - total 14 days. (mackonstan,
15:16:59)
- JG: tables already incl. minor rls and trending
data, need to add major rls, impact of outages and what's left is
for development (testbed-type, time) (mackonstan,
15:24:11)
- Inputs from LFN and FD.io projects - TSC (mackonstan, 15:25:03)
- VP: missed the last TSC meeting, but wanted to
share a pointer to CSIT patch covering all identified Scapy
licensing issues (mackonstan,
15:26:11)
- DW: not much discussed on the last TSC call,
Scapy licensing was not covered (mackonstan,
15:26:28)
- Releases (mackonstan, 15:26:41)
- CSIT-2001 plan (mackonstan, 15:28:24)
- JG: Python migration - proposed plan in
patch (mackonstan,
15:28:49)
- https://gerrit.fd.io/r/c/csit/+/22638
(mackonstan,
15:29:13)
- Agreed to target w/c 18-Nov for a big-bang week
for migration to Python 3.6.8. (mackonstan,
15:33:46)
- Nidhy: asked about API coverage in device tests
- list to cover is available in
resources/api/vpp/supported_crcs.yaml (mackonstan,
15:47:13)
- Operational status (mackonstan, 15:48:25)
- Peter: reporting ongoing issues with testbeds
losing their mgmt IP addresses. (mackonstan,
15:48:50)
- need to have LFN ticket# (mackonstan,
15:52:36)
- Peter: DPDK tests down due to DPDK API bug that
crept into VPP master. Reverted by Damjan, so should be back to
normal tomorrow. (mackonstan,
15:54:31)
- Tibor: Jenkins is going down - was restarted
yday, day before, see email from Vanessa on csit-dev. (mackonstan,
15:56:59)
- Developments (mackonstan, 15:58:57)
- VP: should prioritise cleanup tasks before
freezing it for Python migration (mackonstan,
15:59:38)
- set1: VIRL cleanup and related projects that
only rely on VIRL: HC, nsh_sfc, dmm. (mackonstan,
16:01:10)
- set2: Ligato tests. (mackonstan,
16:01:18)
- set3: changes that are open waiting for weeks,
if not merged before the python-migration-bigbang-week, they will
have to be rebased post migration. (mackonstan,
16:03:28)
Meeting ended at 16:04:23 UTC
(full logs).
Action items
- MK: ask Trishan to order 2 mlx5 NICs, matching models in the lab.
- DW: to review trending test with vpp community, as well as regular cadence for LTS maintenance releases.
People present (lines said)
- mackonstan (34)
- collabot (4)
- vrpolak (1)
- dwallacelf (1)
- jgelety (1)
Generated by MeetBot 0.1.4.