#fdio-csit: FD.io CSIT Project Meeting
Meeting started by mackonstan at 14:00:51 UTC
(full logs).
Meeting summary
- Agenda bashing (mackonstan, 14:01:08)
- Tibor Frank (tifrank,
14:01:11)
- Vratko Polak. (vrpolak,
14:01:12)
- Jan Gelety (jgelety,
14:01:24)
- Peter Mikus (pmikus,
14:02:55)
- Dave Wallace (dwallacelf,
14:03:05)
- Juraj Linkeš (jlinkes,
14:03:09)
- Inputs from projects - VPP (mackonstan, 14:03:15)
- Dave, stable/1908 cherrypicking is near
completion, once done will publish v19.08.3 (mackonstan,
14:04:53)
- Inputs from projects - VSAP (mackonstan,
14:05:19)
- Inputs from projects - VSAP (mackonstan, 14:05:31)
- Peter, number of patches for VPP-VCL + NGINX
benchmarking with ab (Apache HTTP server benchmarking tool)
(mackonstan,
14:07:23)
- Peter, infra is mostly merged, test case
related framework and test cases are to be reviewed and
merged (mackonstan,
14:08:58)
- Dave, need to review the vpp integration part
with Florin (mackonstan,
14:10:54)
- Dave, until there is are dev builds, csit can't
test (mackonstan,
14:12:22)
- Dave, will collaborate with Florin to
communicate this to vsap dev group' (mackonstan,
14:12:50)
- Inputs from projects - TSC (mackonstan, 14:13:12)
- Response times from Vexxhost continue to
lag (mackonstan,
14:14:30)
- Maciek, assurances were given on a call with
Trishan and Mohammed few weeks ago, now need to see actions
(mackonstan,
14:14:54)
- Maciek, continue to push TSC/Program to get all
critical Vexxhost infra tickets resolved (mackonstan,
14:15:55)
- Vratko, update on Scapy/GPL license, all Intel
and Cisco contributions to CSIT are now updated, few individual
contributors' inputs still outstanding (mackonstan,
14:17:12)
- Releases CSIT-2009 (mackonstan, 14:17:38)
- F0 approaching fast (mackonstan,
14:19:19)
- Physical Infrastructure (mackonstan, 14:19:53)
- Peter, quite some movement from Vexxhost,
fixing SSD firmware in progress, on site visit is being
arranged (mackonstan,
14:21:25)
- Peter, expecting all/most SSD issues to be
fixed during the on site visit, ETA this week (mackonstan,
14:21:59)
- Juraj, Arm servers down, there is some
progress, on site visit is being arranged (mackonstan,
14:23:01)
- Juraj, new Arm testbeds, got confirmation they
will be installed (mackonstan,
14:25:20)
- Keesang, new AMD testbeds, they're being racked
and connected. (mackonstan,
14:29:46)
- Maciek, Peter, will start email thread to get
Keesang vpn access instructions (mackonstan,
14:30:40)
- Virtual Infrastructure, CI/CD (mackonstan, 14:31:03)
- Dave, nomad stuff running fine, some jenkins
issues last Friday, hiccups with vpp stable/1908 cherrypicks
(mackonstan,
14:31:33)
- Andrew, make vpp-csit-verify-device vote, got
delayed, will do this week (mackonstan,
14:32:38)
- Dave, TWS call last week, talked about
status (mackonstan,
14:32:55)
- Dave, no TWS call this week (mackonstan,
14:34:36)
- Environment, Framework (mackonstan, 14:34:49)
- Vratko, TRex duration stretching stops
happening with pinning TRex workers and fixed allocation of int
rx/tx , 8 workers results are most optimal based on data so
far (mackonstan,
14:37:22)
- https://gerrit.fd.io/r/c/csit/+/28184
<-- Trex version change. (vrpolak,
14:38:31)
- https://gerrit.fd.io/r/c/csit/+/27848
<-- TRex core pinning. Currently marked as private, I am not an
owner so I cannot un-mark. (vrpolak,
14:39:19)
- Ray, would like to see
https://gerrit.fd.io/r/c/csit/+/27910 merged, example CVL
topology (mackonstan,
14:39:35)
- https://gerrit.fd.io/r/c/csit/+/27913
<-- New number of TRex worker (needs update commit message).
(vrpolak,
14:39:55)
- Vratko, would like to merging all three TRex
patches into one (mackonstan,
14:40:51)
- Performance Tests (mackonstan, 14:41:41)
- Ray, few patches to talk about, 28113, Expand
acl and nat testcases on Denverton in CSIT (mackonstan,
14:42:29)
- https://gerrit.fd.io/r/c/csit/+/28113
(mackonstan,
14:42:31)
- Ray, these are job_specs updates (mackonstan,
14:43:00)
- Ray, another patch 28508: Add ipsec async mode
performance test cases (mackonstan,
14:44:44)
- https://gerrit.fd.io/r/c/csit/+/28508
(mackonstan,
14:44:51)
- Ray, above depends on VPP ipsec async code
28416 : ipsec: add ipsec set async mode api (mackonstan,
14:51:15)
- https://gerrit.fd.io/r/c/vpp/+/28416
(mackonstan,
14:51:42)
- Jan, nat44ed udp and tcp/ip cps tests are
merged, Vratko working on the search implementation (mackonstan,
14:53:18)
- Maros, nat44ed astf tests, trex tcp profile
ready, trex udp pacing profile wip (mackonstan,
14:54:26)
- Vratko, cps tests are now passing, so should
have it for review soon (mackonstan,
14:54:49)
- Functional Tests (mackonstan, 14:56:27)
- Jan, will be adding tests for nat44ed api
tests (mackonstan,
14:56:41)
Meeting ended at 14:58:01 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (49)
- collab-meetbot (4)
- vrpolak (4)
- tifrank (1)
- jgelety (1)
- pmikus (1)
- dwallacelf (1)
- jlinkes (1)
Generated by MeetBot 0.1.4.