#fdio-csit: FD.io CSIT Project Meeting
Meeting started by mackonstan at 14:05:09 UTC
(full logs).
Meeting summary
-
- Jan Gelety (jgelety,
14:05:10)
- Dave Wallace (dwallacelf,
14:05:11)
- Agenda bashing (mackonstan, 14:05:28)
- Tibor Frank (tifrank,
14:05:28)
- Vratko Polak. (vrpolak,
14:05:50)
- CSIT lab extension next year 2021, LFN budget
planning (mackonstan,
14:05:51)
- Inputs from projects (mackonstan, 14:08:09)
- Inputs from projects - VPP (mackonstan, 14:08:18)
- Andrew, v20.09 rc1 getting ready, waiting for
late coming patches, then pressing the button, ETA 18:00 UTC
today. (mackonstan,
14:09:31)
- Jan, from CSIT perspective, rls2009 branch to
be pulled later today, respective ci-mgmt patches to be merged
shortly (mackonstan,
14:11:06)
- Inputs from projects - VSAP (mackonstan, 14:11:26)
- Ping Yu, several patches in CSIT under review,
focusing on VSAP tests (mackonstan,
14:12:33)
- here are the patches: (mackonstan,
14:14:12)
- https://packagecloud.io/app/fdio/2005/search?q=vsap
<-- Still only two (unversioned) packages visible. (vrpolak,
14:16:13)
- Ping to upload VSAP packages to
packagecloud (mackonstan,
14:19:16)
- Inputs from projects - TSC (mackonstan, 14:19:43)
- Releases CSIT-2009 (mackonstan, 14:19:54)
- Jan, should be ready to run v20.09 rc1 tests
this weekend (mackonstan,
14:21:30)
- Jan, baseline dry runs tomorrow, review results
on Friday, then schedule rc1 iterative test set over the
weekend (mackonstan,
14:22:06)
- Jan, nat44det TRex STL, base tests are all
done, adding the verify check that all sessions established, running
on 2n-clx testbeds. (mackonstan,
14:24:46)
- https://gerrit.fd.io/r/c/csit/+/28704
(tifrank,
14:26:10)
- nat44det in job-specs (tifrank,
14:26:34)
- Vratko, nat44ed TRex ASTF, finishing touches
for udp cps, tcp cps, udp "pps/tps" (mackonstan,
14:26:48)
- nat44ed stl unidir, status TBC (mackonstan,
14:27:34)
- Vratko, TRex STL calibration with 8 workers,
all done, works well and consistent results except MLX 2p100GE
NIC (mackonstan,
14:28:53)
- Vratko, TRex + DPDK + MLX that is showing
duration stretching at rates > 45 Mpps (mackonstan,
14:29:59)
- Tibor, report prepared, static content TODO
list per usual to csit-dev, now it's adding data (mackonstan,
14:31:36)
- Tibor, need to add nat44ed astf and stl tests
to report, in TODO list. (mackonstan,
14:32:20)
- Releases - CSIT-2005 (mackonstan, 14:32:36)
- Physical Infrastructure (mackonstan, 14:32:49)
- no issues with existing infra for performance
testbeds (mackonstan,
14:33:26)
- Dave, some open work with build servers
(mackonstan,
14:34:01)
- Maciek, dnv testbeds down, diagnosed as phy
issue, RayK/Yulong to open the ticket with Vexxhost (mackonstan,
14:34:57)
- Juraj, new ThunderX2 testbed, working with
Vexxhost team to work out the install, issue with out of power
sockets in the rack. Rack space is there. (mackonstan,
14:37:43)
- https://secure.vexxhost.com/billing/viewticket.php?tid=FDU-009676&c=ncHht136
(mackonstan,
14:38:31)
- This calls for a greater transparency regarding
rack space and power capacity, let's address this as part of lab
extension conversation with LFN and the team (mackonstan,
14:40:29)
- Juraj, the 2 new ThunderX2 servers to be used
for vpp_device, old ThunderX2 to be considered for 2n performance
testbed if there is a spare TG capacity (mackonstan,
14:42:33)
- Keesang, the new AMD testbed, Vexxhost complete
physical infra now it's about onboarding the servers into
CSIT (mackonstan,
14:46:25)
- Virtual Infrastructure, CI/CD (mackonstan, 14:46:51)
- Dave, TWS call last Friday, Dave walked through
patch 28022 : Automate generation of docker builder images.
(mackonstan,
14:49:03)
- https://gerrit.fd.io/r/c/ci-management/+/28022
(mackonstan,
14:49:12)
- vpp-csit-verify-device voting now, seems to be
working as no complaints (mackonstan,
14:50:14)
- Performance Tests (mackonstan, 14:56:30)
- Vratko, no major issues in trending
tests (mackonstan,
14:58:14)
- Physical lab extension (mackonstan, 14:59:39)
- Maciek, run through the initial draft proposal
of adding new Xeon Icelake testbeds; Arm and AMD extension are TBC;
will send email to drive it to completion (mackonstan,
15:02:30)
Meeting ended at 15:02:52 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (49)
- collab-meetbot (4)
- tifrank (3)
- vrpolak (2)
- jgelety (1)
- dwallacelf (1)
Generated by MeetBot 0.1.4.