====================================== #fdio-csit: FD.io CSIT Project Meeting ====================================== Meeting started by mackonstan at 14:05:09 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/fdio-csit/2020/fd_io_csit_project_meeting/fdio-csit-fd_io_csit_project_meeting.2020-09-09-14.05.log.html . Meeting summary --------------- * Jan Gelety (jgelety, 14:05:10) * Dave Wallace (dwallacelf, 14:05:11) * Agenda bashing (mackonstan, 14:05:28) * Tibor Frank (tifrank, 14:05:28) * Vratko Polak. (vrpolak, 14:05:50) * CSIT lab extension next year 2021, LFN budget planning (mackonstan, 14:05:51) * Inputs from projects (mackonstan, 14:08:09) * Inputs from projects - VPP (mackonstan, 14:08:18) * Andrew, v20.09 rc1 getting ready, waiting for late coming patches, then pressing the button, ETA 18:00 UTC today. (mackonstan, 14:09:31) * Jan, from CSIT perspective, rls2009 branch to be pulled later today, respective ci-mgmt patches to be merged shortly (mackonstan, 14:11:06) * Inputs from projects - VSAP (mackonstan, 14:11:26) * Ping Yu, several patches in CSIT under review, focusing on VSAP tests (mackonstan, 14:12:33) * here are the patches: (mackonstan, 14:14:12) * LINK: https://packagecloud.io/app/fdio/2005/search?q=vsap <-- Still only two (unversioned) packages visible. (vrpolak, 14:16:13) * Ping to upload VSAP packages to packagecloud (mackonstan, 14:19:16) * Inputs from projects - TSC (mackonstan, 14:19:43) * Releases CSIT-2009 (mackonstan, 14:19:54) * Jan, should be ready to run v20.09 rc1 tests this weekend (mackonstan, 14:21:30) * Jan, baseline dry runs tomorrow, review results on Friday, then schedule rc1 iterative test set over the weekend (mackonstan, 14:22:06) * Jan, nat44det TRex STL, base tests are all done, adding the verify check that all sessions established, running on 2n-clx testbeds. (mackonstan, 14:24:46) * LINK: https://gerrit.fd.io/r/c/csit/+/28704 (tifrank, 14:26:10) * nat44det in job-specs (tifrank, 14:26:34) * Vratko, nat44ed TRex ASTF, finishing touches for udp cps, tcp cps, udp "pps/tps" (mackonstan, 14:26:48) * nat44ed stl unidir, status TBC (mackonstan, 14:27:34) * Vratko, TRex STL calibration with 8 workers, all done, works well and consistent results except MLX 2p100GE NIC (mackonstan, 14:28:53) * Vratko, TRex + DPDK + MLX that is showing duration stretching at rates > 45 Mpps (mackonstan, 14:29:59) * Tibor, report prepared, static content TODO list per usual to csit-dev, now it's adding data (mackonstan, 14:31:36) * Tibor, need to add nat44ed astf and stl tests to report, in TODO list. (mackonstan, 14:32:20) * Releases - CSIT-2005 (mackonstan, 14:32:36) * Physical Infrastructure (mackonstan, 14:32:49) * no issues with existing infra for performance testbeds (mackonstan, 14:33:26) * Dave, some open work with build servers (mackonstan, 14:34:01) * Maciek, dnv testbeds down, diagnosed as phy issue, RayK/Yulong to open the ticket with Vexxhost (mackonstan, 14:34:57) * Juraj, new ThunderX2 testbed, working with Vexxhost team to work out the install, issue with out of power sockets in the rack. Rack space is there. (mackonstan, 14:37:43) * LINK: https://secure.vexxhost.com/billing/viewticket.php?tid=FDU-009676&c=ncHht136 (mackonstan, 14:38:31) * This calls for a greater transparency regarding rack space and power capacity, let's address this as part of lab extension conversation with LFN and the team (mackonstan, 14:40:29) * Juraj, the 2 new ThunderX2 servers to be used for vpp_device, old ThunderX2 to be considered for 2n performance testbed if there is a spare TG capacity (mackonstan, 14:42:33) * Keesang, the new AMD testbed, Vexxhost complete physical infra now it's about onboarding the servers into CSIT (mackonstan, 14:46:25) * Virtual Infrastructure, CI/CD (mackonstan, 14:46:51) * Dave, TWS call last Friday, Dave walked through patch 28022 : Automate generation of docker builder images. (mackonstan, 14:49:03) * LINK: https://gerrit.fd.io/r/c/ci-management/+/28022 (mackonstan, 14:49:12) * vpp-csit-verify-device voting now, seems to be working as no complaints (mackonstan, 14:50:14) * Performance Tests (mackonstan, 14:56:30) * Vratko, no major issues in trending tests (mackonstan, 14:58:14) * Physical lab extension (mackonstan, 14:59:39) * Maciek, run through the initial draft proposal of adding new Xeon Icelake testbeds; Arm and AMD extension are TBC; will send email to drive it to completion (mackonstan, 15:02:30) Meeting ended at 15:02:52 UTC. People present (lines said) --------------------------- * mackonstan (49) * collab-meetbot (4) * tifrank (3) * vrpolak (2) * jgelety (1) * dwallacelf (1) Generated by `MeetBot`_ 0.1.4