13:59:46 <mackonstan> #startmeeting FD.io CSIT Project Meeting 13:59:46 <collab-meetbot> Meeting started Wed Sep 16 13:59:46 2020 UTC and is due to finish in 60 minutes. The chair is mackonstan. Information about MeetBot at http://wiki.debian.org/MeetBot. 13:59:46 <collab-meetbot> Useful Commands: #action #agreed #help #info #idea #link #topic #startvote. 13:59:46 <collab-meetbot> The meeting name has been set to 'fd_io_csit_project_meeting' 13:59:51 <mackonstan> #chair 13:59:51 <collab-meetbot> Current chairs: mackonstan 13:59:56 <mackonstan> #topic Agenda bashing 14:00:22 <vrpolak> #info Vratko Polak. 14:01:00 <tifrank> #info Tibor Frank 14:01:32 <dwallacelf> #info Dave Wallace 14:02:56 <jlinkes> #info Juraj Linkeš 14:03:50 <mackonstan> #topic Inputs from projects: VPP 14:05:13 <mackonstan> #info Andrew, rc2, planned to do it noon CEST, right now tracking for <6pm CEST 14:05:34 <mackonstan> #info Andrew, waiting for two changes to verify 14:08:03 <mackonstan> #info Andrew, Vanessa planning to shutdown Jenkins to adjust ingress instance, need to coordinate to minimize impact on jobs 14:13:19 <mackonstan> #info Tibor, current csit rc1 iterative jobs are expected to finish by tomorrow AM CEST 14:15:12 <mackonstan> #topics Inputs from projects: VSAP 14:15:47 <mackonstan> #info Dave, Ping got back re artefacts and naming, discussion is happening in vsap-dev mailer 14:16:47 <tifrank> #info List of RC1 testing jobs currently running: 14:16:47 <tifrank> https://jenkins.fd.io/job/csit-vpp-perf-report-iterative-2009-3n-hsw/3/ 14:21:42 <vrpolak> #link https://lists.fd.io/g/vsap-dev/message/9 14:23:00 <mackonstan> #info Dave, Ray, discussing the status, see summary in the vsap-dev link above 14:24:45 <mackonstan> #topic Inputs from projects - TSC 14:24:58 <mackonstan> #topic Releases - CSIT-2009 14:25:20 <tifrank> #info List of RC1 testing jobs currently running: 14:25:20 <tifrank> https://jenkins.fd.io/job/csit-vpp-perf-report-iterative-2009-3n-hsw/3/ 14:26:12 <mackonstan> #info Tibor, rc1 jobs, dpdk tests pass 14:26:46 <mackonstan> #info Tibor, rc1 jobs, vpp, still wip, only known problems showing up 14:27:21 <mackonstan> #info List of RC1 testing jobs currently running: 14:27:27 <mackonstan> #link https://jenkins.fd.io/job/csit-vpp-perf-report-iterative-2009-2n-clx/3/ 14:27:34 <mackonstan> #link https://jenkins.fd.io/job/csit-vpp-perf-report-iterative-2009-2n-skx/3/ 14:27:39 <mackonstan> #link https://jenkins.fd.io/job/csit-vpp-perf-report-iterative-2009-3n-skx/3/ 14:27:45 <mackonstan> #link https://jenkins.fd.io/job/csit-vpp-perf-report-iterative-2009-3n-hsw/3/ 14:27:50 <mackonstan> #link https://jenkins.fd.io/job/csit-vpp-perf-report-iterative-2009-3n-tsh/3/ 14:32:47 <mackonstan> #info Ray, re Denverton testbed status, replacing cables didn't fix it, need to replace the NICs in TG. 10GE, niantic, x520/x550. Details in ticket. 14:36:18 <mackonstan> #info Vratko, nat44ed new tests with astf, UDP and TCP CPS tests in review ETA for merge in 1week, UDP PPS tests are not ready require rebase changes and some from Jan 14:37:16 <mackonstan> #info Vratko, updated nat44det(ei) are stil not merged, waiting for Jan to come back from PTO 14:38:15 <mackonstan> #info Vratko, will see if time to look at nat44det patch from Jan 14:39:54 <mackonstan> #info Maciek, Vratko, new async crypto tests, merged now, tested on hsw as test code only for HW crypto 14:40:07 <mackonstan> #topic Releases: CSIT-2005 14:40:18 <mackonstan> #info Physical Infrastructure 14:40:59 <mackonstan> #info Peter, Xeon testbeds, SSD fixing is WIP 14:44:51 <mackonstan> #info Keesang, AMD testbed, got VPN access finally, checked BIOS settings and looking good, but BMC virtual console connection is very slow, and there is no ssh access to servers, ip mgmt addresses have to be assigned by Vexxhost 14:48:18 <mackonstan> #info Juraj, new testbed ThunderX2, in process of decommissioning mcbins and complete the install of new ThunderX2 servers using freed rack space and power sockets 14:48:48 <mackonstan> #topic FD.io lab extension in 2021 14:50:45 <mackonstan> #info Maciek, for latest status see email thread. 14:53:51 <mackonstan> #topic Virtual Infrastructure, CI/CD 14:54:35 <mackonstan> #info Dave, starting to deploy generated Nomad docker images, doing it incrementally 14:54:47 <mackonstan> #info Dave, no need for any further TWS meetings 14:55:10 <mackonstan> #topic Environment, Framework 14:57:27 <mackonstan> #info Maciek, Peter, the only known environment change is TRex version change to v2.82 (dpdk driver changes?), and TRex data plane worker calibration to 8 workers (from 7 previously). 14:57:39 <mackonstan> #topic Performance Tests 14:58:43 <mackonstan> #info Peter, looking at AVF test failures in trending 14:59:33 <mackonstan> #endmeeting