#fdio-csit: FD.io CSIT Project Meeting

Meeting started by mackonstan at 15:04:55 UTC (full logs).

Meeting summary

    1. Vratko Polak. (vrpolak, 15:05:07)
    2. Tibor Frank (tifrank, 15:05:17)
    3. Jan Gelety (jgelety, 15:05:23)
    4. mackonstan (mackonstan, 15:05:30)
    5. Dave Wallace (dwallacelf, 15:05:31)

  1. Agenda bashing (mackonstan, 15:05:46)
    1. Peter Mikus (pmikus, 15:06:17)

  2. Inputs from projects (mackonstan, 15:06:51)
  3. Inputs from projects - VPP (mackonstan, 15:07:03)
    1. Andrew, RC1 today, master has re-open, stable/2101 branch created (mackonstan, 15:07:41)
    2. Andrew, going thru the final teething problems of completing automation of RC1 process, vs handcrafted process that was there before (mackonstan, 15:09:08)

  4. Inputs from projects - TSC (mackonstan, 15:10:11)
    1. Maciek, keep tracking this agenda item on TSC meetings "Physical DCs: clearing the air by TSC Chair and PTL(s), DC consolidation/move by March 2021" (mackonstan, 15:12:21)

  5. Releases CSIT-2009 (mackonstan, 15:13:03)
    1. Tibor, generation in progress of the final maintenance version of CSIT-2009 report, adding 2n-zn2 static content and test/performance data (mackonstan, 15:16:59)

  6. Releases CSIT-2101 (mackonstan, 15:17:34)
    1. Jan, geneve tunnel tests almost done, available for review tomorrow AM (mackonstan, 15:20:20)
    2. Juraj, arm tasks are looking good, except slower arm perf job execution … (mackonstan, 15:21:20)
    3. https://wiki.fd.io/view/CSIT/csit2101_plan (mackonstan, 15:21:31)
    4. Vratko, finishing nat44ed pure throughput tests, but issues with results consistency (mackonstan, 15:23:04)
    5. Vratko, progressing random tests for MAC and IPv6 (mackonstan, 15:25:51)

  7. Physical Infrastructure (mackonstan, 15:27:05)
    1. MK, FD.io lab move: update from the meeting with Mohammed/Vexxhost, inventory and a strawman DC relocation plan to be provided by Thu 17-Dec EOB EST. (mackonstan, 15:36:01)

  8. Virtual Infrastructure, CI/CD (mackonstan, 15:36:22)
    1. Maciek, Dave, soft escalation with Trishan/LF IT re Jenkins operations (mackonstan, 15:38:09)
    2. Dave, more changes trickling in into Jenkins configuration, increasing the risk of Jenkins becoming unstable, as tracked in LF IT tickets (mackonstan, 15:40:35)
    3. https://jira.linuxfoundation.org/browse/RELENG-3325 (mackonstan, 15:40:38)
    4. https://jira.linuxfoundation.org/browse/RELENG-3324 (mackonstan, 15:41:11)
    5. Dave, to update the RELENG-3325 ticket with the current sentiment with repeated request to transparency in applycing/controlling/reviewing changes to Jenkins configs (mackonstan, 15:48:02)
    6. Maciek, continue soft escalation with Trishan (mackonstan, 15:48:16)
    7. Dave, Maciek et al, add it to the agenda to the FD.io TSC call tomorrow (mackonstan, 15:48:37)

  9. Environment, Framework (mackonstan, 15:50:18)
    1. Jan, re VPP API changes' tracking, IPsec is done, LB in review, vpp nsim api (network simulator) is in works, cop api by tomas a, once all of these are complete, csit is good with deprecated apis (mackonstan, 15:53:24)

  10. Performance Tests (mackonstan, 15:57:32)
    1. next meeting 6-jan-2021 (mackonstan, 16:02:19)


Meeting ended at 16:02:48 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan (33)
  2. collab-meetbot (4)
  3. vrpolak (1)
  4. tifrank (1)
  5. jgelety (1)
  6. dwallacelf (1)
  7. pmikus (1)


Generated by MeetBot 0.1.4.