#fdio-csit: FD.io CSIT project meeting
Meeting started by mackonstan at 14:02:22 UTC
(full logs).
Meeting summary
-
- Vratko Polak. (vrpolak,
14:02:31)
- Peter Mikus (pmikus,
14:02:46)
- Tibor Frank (tifrank,
14:03:44)
- Agenda bashing (mackonstan, 14:03:51)
- Physical labs, testbeds (mackonstan, 14:04:08)
- Peter - old faulty SSDs got replaced.
(mackonstan,
14:04:51)
- Peter - 3 more SSDs failed - 3n-skx, and 2 of
2n-skx (mackonstan,
14:05:25)
- Jan Gelety (jgelety,
14:05:56)
- Peter - some progress made on getting SSD
spares, purchased and shipped. (mackonstan,
14:06:19)
- Peter - 10 SSDs spare (mackonstan,
14:06:39)
- Peter - 15 SSDs shipped as RMAs, no RCAs
received. (mackonstan,
14:07:06)
- Dave Wallace (dwallacelf,
14:07:36)
- Peter - thread with CSIT, Vexxhost, LFN IT,
missing is Intel eng contact. (mackonstan,
14:08:40)
- ACTION: Maciek, Ray
to pick it up from Peter and team (mackonstan,
14:08:55)
- Inputs from projects (mackonstan, 14:10:57)
- VPP (mackonstan, 14:11:26)
- Dave - 20.05 API freeze is May-6, next
Wed (mackonstan,
14:11:32)
- Dave - RC0 is week after that May-13
(mackonstan,
14:11:55)
- Dave - no schedule for v19.08.2 yet, waiting
for CSIT progress and test data analysis (mackonstan,
14:13:01)
- VSAP (mackonstan, 14:13:20)
- https://gerrit.fd.io/r/c/csit/+/26660
<-- Add test cases about VSAP project with VPP TLS to CSIT (vrpolak,
14:13:20)
- Dave - 3k patch pushed in (mackonstan,
14:13:34)
- Dave - 3 kloc patch pushed in (mackonstan,
14:14:00)
- Dave - asked for simplifying the patch,
separating infra from test, for VSAP to send someone to VPP and CSIT
calls, and spin up FD.io project resources (mackonstan,
14:16:28)
- Dave - it is unfeasible to expect that this
patch and tests to be included in CSIT-2005. More conversation needs
to happen with Ping and Ray. (mackonstan,
14:17:25)
- Dave - Ping is to be the PTL for VSAP project,
once the project is actually spun up. (mackonstan,
14:17:48)
- TSC (mackonstan, 14:19:44)
- Dave - Scapy / GPLv2 - work still
ongoing (mackonstan,
14:20:06)
- Discussion about Docker image registry, as
"FD.io" already taking in dockerhub (mackonstan,
14:20:29)
- Vratko - Discussion about Docker image
registry, as "FD.io" already taking in dockerhub (mackonstan,
14:21:08)
- https://gerrit.fd.io/r/c/csit/+/23143
<-- GPL saga part one, move files without switching license yet.
(vrpolak,
14:21:52)
- Side comments - Dave - Nomad images and code to
be stored in ci-management (mackonstan,
14:21:53)
- Releases (mackonstan, 14:24:42)
- CSIT-2001 Release - 2n-skx, 3n-skx re-test (mackonstan, 14:25:09)
- Jan - 2n-skx - 10 runs complete, 3n-skx - 5
runs complete (SSD failures inhibit the progress here). (mackonstan,
14:25:55)
- Jan - 2n-skx - full-set tests done, 3n-skx -
full-set tests not not done, will do after 6th repeatability run
complete (mackonstan,
14:26:53)
- Tibor - report data publishing is ready, just
awaiting updated files with RCA details. (mackonstan,
14:27:37)
- Vratko - bi-secting and RCA'ing is progressing
slow, most of RCAs should be filed by next Wed May-6 (mackonstan,
14:29:02)
- CSIT-1908 Release (mackonstan, 14:29:54)
- CSIT-1908 Release - Maintenance (mackonstan, 14:30:07)
- Jan - 2n-skx - 10 runs complete (for
repeatability), all l2-patch tests are failing (checking for missing
cherry-pick, as similar was observed in the vpp master post 19.08.1
rls), all other tests are passing. (mackonstan,
14:31:38)
- Tibor - 2n-skx - 19.08.2 vs. 19.08.1 is ready
in master (mackonstan,
14:32:03)
- https://docs.fd.io/csit/master/report/_static/vpp/performance-changes-1908_2-2n-skx-2t1c-ndr.txt
(tifrank,
14:32:47)
- https://docs.fd.io/csit/master/report/_static/vpp/performance-changes-1908_2-2n-skx-2t1c-pdr.txt
(tifrank,
14:33:18)
- https://docs.fd.io/csit/master/report/_static/vpp/performance-changes-1908_2-3n-skx-2t1c-ndr.txt
(tifrank,
14:33:36)
- https://docs.fd.io/csit/master/report/_static/vpp/performance-changes-1908_2-3n-skx-2t1c-pdr.txt
(tifrank,
14:33:51)
- Jan - 3n-skx - 2 runs completed too.
(mackonstan,
14:40:50)
- Consensus on the call to go ahead with
v19.08.2 (mackonstan,
14:44:11)
- https://docs.releng.linuxfoundation.org/en/latest/meetbot.html
<-- MeetBot Guide :) (vrpolak,
14:44:35)
- CSIT-2005 Release (mackonstan, 14:45:40)
- CSIT F0 may-6, RC1 may-13. (mackonstan,
14:49:19)
- Operations (mackonstan, 14:50:21)
- Vratko - LF IT maintenance went well, no
issues, all smooth (mackonstan,
14:50:56)
- VPP code performance (mackonstan, 14:51:10)
- Tibor - added ndrpdr weekly comparison to the
trending pages (mackonstan,
14:51:30)
- https://docs.fd.io/csit/master/trending/introduction/weekly.html
(tifrank,
14:51:34)
- Vratko - some progressions and regressions are
visible on MRR daily and on PDR weekly, some are not (mackonstan,
14:54:48)
- Vratko - it would be nice to compare the above
weekly trending with current daily dashboard (mackonstan,
14:56:13)
- https://docs.fd.io/csit/master/trending/introduction/dashboard.html
(mackonstan,
14:56:15)
- discussion - separate the weekly NDRPDR tests
between single run (to see if tests pass/fail) and multiple runs for
statistically meaningful data for week-by-week comparison
(mackonstan,
14:58:36)
- Jan - daily trending - ipsec tests are failing,
bisecting wip, offending patch to be identified shortly (mackonstan,
14:59:34)
- Jan - will use Vratko's auto-bisecting code to
find the bad apple (mackonstan,
15:00:16)
- Developments (mackonstan, 15:00:44)
- Jan - new srv6 api tests are in review, pls
review before F0 next week (mackonstan,
15:01:09)
Meeting ended at 15:01:49 UTC
(full logs).
Action items
- Maciek, Ray to pick it up from Peter and team
People present (lines said)
- mackonstan (55)
- tifrank (10)
- collab-meetbot (4)
- vrpolak (4)
- pmikus (1)
- jgelety (1)
- dwallacelf (1)
Generated by MeetBot 0.1.4.