#fdio-csit: FD.io CSIT project meeting

Meeting started by mackonstan at 14:00:34 UTC (full logs).

Meeting summary

    1. Tibor Frank (tifrank, 14:00:41)
    2. Dave Wallace (dwallacelf, 14:00:42)
    3. Vratko Polak. (vrpolak, 14:01:02)
    4. Juraj Linkeš (jlinkes, 14:03:18)

  1. Agenda bashing (mackonstan, 14:06:41)
  2. Physical labs, testbeds (mackonstan, 14:06:50)
    1. Peter Mikus (pmikus, 14:12:14)
    2. Peter, SSDs replaced, all 4 testbeds back up, being added into production pool, should be operational 100% today (mackonstan, 14:13:43)

  3. Inputs from projects (mackonstan, 14:13:55)
  4. Inputs from projects - VPP (mackonstan, 14:14:05)
    1. Dave, vpp rc2 v20.05 on time (mackonstan, 14:14:19)
    2. Dave expecting smooth completion of rc2 no backlog (mackonstan, 14:14:59)

  5. Inputs from projects - VSAP (mackonstan, 14:15:12)
    1. Dave, some updates from Ray Kinsella, Ping is setting up community meetings and such (mackonstan, 14:15:36)
    2. Dave, no updates on mega patch (mackonstan, 14:16:08)
    3. Vratko, VSAP added a new ci-mgmt patch, going thru review (mackonstan, 14:16:22)

  6. Inputs from projects - TSC (mackonstan, 14:16:39)
    1. GPLv2 step-2 is in-progress (mackonstan, 14:17:39)

  7. Inputs from projects - CNCF CNF Testbed (mackonstan, 14:17:56)
    1. no update (mackonstan, 14:18:10)

  8. Releases - CSIT-2005 (mackonstan, 14:18:27)
    1. today is csit rc2 for rls2005 (mackonstan, 14:18:37)
    2. Jan, waiting for rc2 builds from vpp (mackonstan, 14:19:20)
    3. Jan, some test failures with vpp rc1, ipsec failing on 3n-hsw but it works on 3n-skx, configuration ipsec tunnels via VAT is crashing VPP. (mackonstan, 14:20:23)
    4. Maciek, could it be related to the new vpp async crypto for QAT patch: https://gerrit.fd.io/r/c/vpp/+/18036 (mackonstan, 14:21:54)
    5. Jan, Peter, 3n-hsw only 10k tunnel ipsec sw tests are failing, hw tests are working but with lower scale (mackonstan, 14:24:06)
    6. Jan, VTS tests are also failing on rc1 (mackonstan, 14:24:44)
    7. Dave, all new hoststack tests to be deferred to the next release, CSIT-2009 (mackonstan, 14:26:14)

  9. Releases - CSIT-2001 (mackonstan, 14:26:31)
    1. Jan, finishing complete set of perf tests 3n-skx that were delayed due to hw failures (SSDs) (mackonstan, 14:27:28)

  10. Releases - CSIT-1908.2 (mackonstan, 14:28:20)
    1. Tibor has ingested updated vpp performance rls notes from Maciek, report is ready for announcement (mackonstan, 14:29:42)
    2. https://docs.fd.io/csit/rls1908_2/report/vpp_performance_tests/packet_throughput_graphs/index.html (mackonstan, 14:29:50)

  11. Operations (mackonstan, 14:30:38)
    1. Jan, new ci-mgmt jobs for executing report iterative and report (full) coverage tests based on the new format of job spec files (mackonstan, 14:31:57)
    2. Jan, new job spec for report coverage jobs (mackonstan, 14:32:16)
    3. https://gerrit.fd.io/r/c/csit/+/27124 (mackonstan, 14:32:26)
    4. Vratko, vpp-csit-device tests to vote, requires update to API change tracking process (mackonstan, 14:37:29)
    5. CSIT committers, Maciek proposed to vote on making Juraj CSIT committer, see email on csit-dev, pls vote (mackonstan, 14:40:41)
    6. https://wiki.fd.io/view/Nomad_Operations_and_Planning (dwallacelf, 14:45:10)
    7. TWS infra calls continue, the next one is on Thu 21-May at 7:30 EDT, 13:30 CEST https://zoom.us/my/fastdata (mackonstan, 14:47:04)

  12. VPP code performance (mackonstan, 14:47:27)
    1. Tibor, added to trending html page: weekly ndrpdr graphs, dashboard, failures (mackonstan, 14:48:10)
    2. Tibor will give us a walk through the latest additions (mackonstan, 14:49:29)
    3. Vratko, gcc to clang move for vpp builds: 3n-hsw tests seem to be affected with some regression (mackonstan, 14:51:25)
    4. Maciek, new vpp patch from Ray Kinsella and team about "node variants" settings in startup.conf (mackonstan, 14:55:02)
    5. src/vpp/conf/startup.conf (mackonstan, 14:55:12)
    6. example: (mackonstan, 14:55:24)

  13. Developments (mackonstan, 14:56:06)
    1. Maciek, new tests coming for CG- (mackonstan, 14:57:58)
    2. CG- (mackonstan, 14:58:05)
    3. CG-NAT and Endpoint-Dependent NAT (mackonstan, 14:58:28)


Meeting ended at 15:01:58 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan (56)
  2. collab-meetbot (4)
  3. dwallacelf (2)
  4. tifrank (1)
  5. vrpolak (1)
  6. jlinkes (1)
  7. jgelety (1)
  8. pmikus (1)


Generated by MeetBot 0.1.4.