#fdio-csit: CSIT/Meeting
Meeting started by pmikus at 14:03:49 UTC
(full logs).
Meeting summary
-
- Vratko Polak. (vrpolak,
14:03:57)
- Dave Wallace (dwallacelf1,
14:03:59)
- Fan Zhang (fan_zhang,
14:03:59)
- Tibor Frank (tifrank,
14:04:02)
- Agenda bashing (pmikus, 14:04:09)
- To be reviewed and discuss: New tests from
Intel (e810 functional tests, ipsec) (pmikus,
14:05:57)
- Inputs from projects (pmikus,
14:06:20)
- VPP: no updates (pmikus,
14:06:32)
- VSAP: Florin and Dave is progressing, Florin
wants to add wrk tests, so far there is different results from
various external testbed vs lfn-testbeds (pmikus,
14:07:52)
- TCS: Ok to refresh TSC board, discussion about
CSIT making core project move to next TSC (pmikus,
14:09:55)
- New tests (pmikus, 14:10:35)
- New e810 tests to test flow classification
under #29967 on performance testbeds. For functional tests there is
a vpp_device testbed to be used for that purpose. (pmikus,
14:12:30)
- proposed to fill the vpp_device testbed with
additional e810 so tests can run there (pmikus,
14:16:07)
- IPsec test. New Async test to be reviewed.
Overall number of testcases to be reviewed as well. Vratko to follow
up. (pmikus,
14:21:51)
- Communication to be continued over mail with
direct mail (pmikus,
14:28:05)
- Releases (pmikus, 14:29:40)
- CSIT/csit2106 plan (pmikus,
14:31:26)
- Extra IPsec testcase from Juraj (pmikus,
14:31:56)
- No new things for 2101 now. New maintenance
release expecting in July (pmikus,
14:33:59)
- Physical Infrastructure (pmikus, 14:34:28)
- Stage 2 is progressing. Rack are connected and
built. Expecting physical move today or tomorrow. (pmikus,
14:36:23)
- FD.io lab extension in 2021 not covered on TSC
last week (pmikus,
14:37:24)
- Virtual Infrastructure, CI/CD (pmikus, 14:37:53)
- Logs consolidating, few hiccups, but issue
solved and we are on new macros (pmikus,
14:38:21)
- new patch regarding ccache in review (DaveW,
Pmikus) (pmikus,
14:38:52)
- sporadic issue with NW connectivity. Ticket
opened (pmikus,
14:39:09)
- Requested re-opening of previous Vexxhost
ticket #NOB-607778 (dwallacelf1,
14:40:13)
- High failure on Description: Job:
vpp_csit_verify_device_master_1n_tx2 (pmikus,
14:43:06)
- Peter, Juraj to follow up (pmikus,
14:44:36)
- Environment, Framework (pmikus, 14:47:41)
- Upgrade of backend testbeds to Ubuntu 20.04
after DC move, peter will follow (pmikus,
14:50:04)
- VPP API changes' tracking: Vratko: quite stable
thanks to policy, some messages are still from 2101 used in master
of CSIT for backward compatibility (pmikus,
14:51:20)
- One change in CRC handling (pmikus,
14:52:25)
- Performance Tests (pmikus, 14:53:07)
- Nat44ed to be fixed by today. Verifying by
Tomas (pmikus,
14:53:40)
- Geneve tests are failing. Tickets opened. Issue
identified as changes in AVF front (pmikus,
14:54:26)
- Analytics, Presentation (pmikus, 14:55:25)
- Moving to data backend managed by FD.io instead
of nexus (pmikus,
14:57:26)
Meeting ended at 15:01:52 UTC
(full logs).
Action items
- (none)
People present (lines said)
- pmikus (36)
- collab-meetbot (4)
- dwallacelf1 (2)
- fan_zhang (2)
- vrpolak (1)
- tifrank (1)
Generated by MeetBot 0.1.4.