================================ #fdio-csit: CSIT Project Meeting ================================ Meeting started by mackonstan at 15:05:37 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/fdio-csit/2021/csit_project_meeting/fdio-csit-csit_project_meeting.2021-01-13-15.05.log.html . Meeting summary --------------- * Jan Gelety (jgelety, 15:05:39) * Tibor Frank (tifrank, 15:05:41) * Juraj Linkeš (jlinkes, 15:05:42) * Agenda bashing (mackonstan, 15:05:50) * Vratko Polak. (vrpolak, 15:05:52) * Inputs from projects - VPP (mackonstan, 15:06:12) * Andrew, RC2 almost ready. (mackonstan, 15:06:35) * Releases CSIT-2101 (mackonstan, 15:07:07) * today is RC2 (mackonstan, 15:07:39) * Tibor, many RC1 test dry runs executed (mackonstan, 15:07:57) * Tibor, interim results in draft report version (mackonstan, 15:09:45) * LINK: https://docs.fd.io/csit/master/report/vpp_performance_tests/packet_throughput_graphs/ip4.html (mackonstan, 15:09:48) * Dave Wallace (dwallacelf, 15:09:58) * Tibor, comparison tables are also being populated incl. 2009.0 retest (mackonstan, 15:11:15) * Jan, Geneve tests still under review, addressing last comments (mackonstan, 15:12:07) * Vratko, nat44ed throughput tests and ip6-rnd and ip4-rnd are under review (mackonstan, 15:12:50) * Juraj, 2n-tx2 testbed is operational, all working. (mackonstan, 15:14:19) * Tibor, report TODO email sent out. (mackonstan, 15:16:10) * Maciek, Vratko: methodology needs to be updated for nat44ed throughput, ip4- and ip6-rnd testing. (mackonstan, 15:16:47) * Releases CSIT-2009 (mackonstan, 15:17:48) * Dave, v20.09.01 maintenance rls target 17-Feb. (mackonstan, 15:18:56) * (correction) Davee, VPP v20.09.01 maintenance rls target 17-Feb (mackonstan, 15:19:25) * Physical Infrastructure (mackonstan, 15:19:34) * Physical Infrastructure - FD.io DC move in Jan/Feb 2021 and lab extension in 2021. (mackonstan, 15:31:34) * (mackonstan, 15:31:46) * Maciek, agreed on a call to ask Vexxhost about routing topology and packet forwarding between YUL1 and MTL1, assuming MTL2 is migrated in one step, stage-1 (mackonstan, 15:33:34) * Maciek, agreed to set a move date for MTL2 for 11-Feb-2021, 1 day after report publish (mackonstan, 15:40:18) * Maciek, re MTL1 (4 racks), balance the required work and strive to make the server move transparent to project operations (mackonstan, 15:45:19) * Will produce draft proposals for MTL1 move, in the patch, review on the next week call (mackonstan, 15:47:13) * LINK: https://gerrit.fd.io/r/c/csit/+/30662 (mackonstan, 15:47:23) * Virtual Infrastructure, CI/CD (mackonstan, 15:47:39) * Juraj, i40e dpdk driver, sporadic failures on arm and x86, created an entry in linux kernel bugzilla (mackonstan, 15:51:49) * Maciek, opening the ticket in Intel IPS system to speed things up (mackonstan, 15:52:07) * Juraj, q to Dave how is the Centos8 docker image generation going (mackonstan, 15:53:06) * Dave, still a todo, hoping to make progress this week\ (mackonstan, 15:53:30) * Dave, added more nomad monitors following outages on 4-/5-jan (mackonstan, 15:55:11) * Dave, using WxT "jenkins-healthcheck" channel for monitoring results, as an interim (mackonstan, 15:57:39) * Dave, propose to use the same ping monitor scripts for upcoming DC move (mackonstan, 15:58:24) * Dave, jenkins parameterized work has been merged, going production soon (mackonstan, 15:59:29) Meeting ended at 16:00:23 UTC. People present (lines said) --------------------------- * mackonstan (37) * collab-meetbot (4) * jgelety (1) * tifrank (1) * jlinkes (1) * vrpolak (1) * dwallacelf (1) Generated by `MeetBot`_ 0.1.4