#fdio-honeycomb: Honeycomb, hc2vpp & JVPP weekly

Meeting started by michal-cmarada at 15:30:04 UTC (full logs).

Meeting summary

  1. Development status (michal-cmarada, 15:32:44)
    1. VPP changed API for interfaces, JVPP and HC2VPP fixed. However due to CSIT requiring more time to adjust to these changes VPP patch was reverted temporarily. (michal-cmarada, 15:34:58)
    2. JVPP introduced boolean type and fixes one bug for sring variables (michal-cmarada, 15:37:51)
    3. JVPP introduced unit tests and docs support. (michal-cmarada, 15:38:48)
    4. Bugfix for hc2vpp Centos integration job https://gerrit.fd.io/r/#/c/18321/ (in review). Verify is failing due to unrelated issue. To be merged when resolved. (michal-cmarada, 15:39:08)
    5. JAVA11 integration in progress. LF is working on updates for JVPP jobs. Nomad containers need to be upgraded separately. Ed Kern should be able to help. Contacted, no response yet. (michal-cmarada, 15:40:12)
    6. Neon Bump - in progress. ODL Neon release postponed original rls date: 2019-03-06. Currently in RC3 (status: https://docs.google.com/spreadsheets/d/1sIoApv2fFp0wJcPK7m6lQDtjbUonRANrs5upSeD_DyI/edit#gid=1352305345) (michal-cmarada, 15:45:35)
    7. Neon Bump: Honeycomb - Netconf and Restconf bumped, BGP in progress (BGP still uses deprecated controller features, this means code duplication -> we will need to maintain both versions) (michal-cmarada, 15:46:43)
    8. Neon Bump: HC2VPP - Netconf and Restconf changes applied, BGP in progress(same as Honeycomb). (michal-cmarada, 15:46:54)
    9. EnumFlags (JVPP) - Null pointer exception fix (Tibor) in review. To be merged after testing is done. (michal-cmarada, 15:47:07)

  2. Testing status (michal-cmarada, 15:48:40)
    1. CSIT vpp-device and performance testing revealed issues with jvpp and hc2vpp package dependencies. TODO: Recheck JVPP and honeycomb packages and fix dependencies (vpp-api-java for honeycomb package, vpp dependencies for vpp-api-java package). (michal-cmarada, 15:48:58)
    2. Classify tables issue. Fix prepared by Tibor, but CSIT verify is now failing, Recheck Fix, verify Csit Tests (Todo) (michal-cmarada, 15:49:26)


Meeting ended at 15:49:49 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. michal-cmarada (15)
  2. collabot (3)


Generated by MeetBot 0.1.4.