#fdio-meeting: FD.io CSIT Project Meeting
Meeting started by mackonstan at 14:11:54 UTC
(full logs).
Meeting summary
-
- Vratko Polak. (vrpolak,
14:12:03)
- (mackonstan,
14:12:05)
- Juraj Linkeš (jlinkes,
14:12:06)
- Tibor Frank (tifrank,
14:12:07)
- Maciek Konstantynowicz (mackonstan,
14:12:15)
- Dave Wallace (dwallacelf,
14:12:25)
- Fan Zhang (fan_zhang,
14:12:26)
- Agenda bashing (mackonstan, 14:13:49)
- Inputs from projects (mackonstan, 14:13:54)
- Inputs from projects - VPP (mackonstan, 14:14:01)
- Inputs from projects - VSAP (mackonstan, 14:14:12)
- Inputs from projects - TSC (mackonstan, 14:14:25)
- New performance tests - gtpu (mackonstan, 14:15:28)
- Vratko, tests are merged. (mackonstan,
14:16:16)
- Tibor, covered in report, will add to trending.
Can be removed from the agenda. (mackonstan,
14:16:53)
- New functional Tests - flow "offload" patch (mackonstan, 14:18:03)
- Juraj, comments addressed, one comment from
Vratko outstanding. (mackonstan,
14:18:55)
- ignore two posts listed above (mackonstan,
14:20:49)
- New functional Tests - IPsec SPD outbound flow cache patch (mackonstan, 14:21:17)
- Juraj, comments addressed, one comment from
Vratko outstanding. (mackonstan,
14:21:28)
- Vratko, 32308, review almost complete, can be
merged soon. (mackonstan,
14:22:02)
- Vratko, 32895, waiting for VPP. (mackonstan,
14:22:14)
- New functional Tests - flow "offload" patch (mackonstan, 14:22:33)
- Fan, waiting to have the CVL fully onboarded in
vpp_device testbed. (mackonstan,
14:23:52)
- Peter, missing QSFP28 cable for the 2nd
testbed, awaiting new cable shipment (in-flight). Will be finishing
the coding part later this week. (mackonstan,
14:26:47)
- Fan, the benchmarking is TBD. (mackonstan,
14:27:44)
- Release - CSIT-2106 (mackonstan, 14:28:16)
- Tibor, rls2106 testing going well, iterative
tests, reconfig tests are almost done. (mackonstan,
14:29:06)
- Tibor, will be starting coverage tests
(mackonstan,
14:29:22)
- Tibor, draft report ver in master (mackonstan,
14:29:36)
- Tibor, intermittent failures: 1) rdma-core on
one testbed, switching driver problem; 2) create avf interface,
moving thru NIC rxq configurations; 3) nat44ed 16M sessions not be
established in allotted time for some tests; 4) deterministic for
specific (frame_size, core config): ipsec sw asyn tests, no traffic
forwarded; 5) VSAP tests with MLX (mackonstan,
14:33:56)
- Vratko, Peter re 5) ARP resolution
issue. (mackonstan,
14:34:28)
- https://logs.fd.io/production/vex-yul-rot-jenkins-1/csit-vpp-perf-verify-master-3n-skx/476/
<-- Ipsec async scheduler results for 3n-skx (vrpolak,
14:34:42)
- https://logs.fd.io/production/vex-yul-rot-jenkins-1/csit-vpp-perf-verify-master-3n-dnv/109/
<-- for 3n-dnv (vrpolak,
14:34:58)
- The links are for master, but we expect 2106 to
look the same. (vrpolak,
14:35:31)
- The performance change happened after we
switched CSIT code globally to use one rxq per dataplane worker and
interface. (vrpolak,
14:36:16)
- Vratko, multiple progressions observed.
(mackonstan,
14:37:30)
- Vratko, 2 regressions on Xeons: 1) ipsec, 2)
nat44ed minimum scale cps. (mackonstan,
14:38:40)
- Vratko, 1 regressions tsh: 1) vhost with vpp in
vm. (mackonstan,
14:39:20)
- correction for above line: with testpmd in
vm. (mackonstan,
14:39:40)
- Tibor, to complete report, the main work is
static content for methodology sections per report TODO email sent
last Tue (mackonstan,
14:41:14)
- Dave, re data comparison tables for tsh and for
tx2 retest of v2101 in current CSIT env, getting failures in build
jobs, working on it. (mackonstan,
14:42:30)
- Releases CSIT-2101 (mackonstan, 14:43:55)
- Dave, VPP v21.01.1 maintenance release
artefacts to be produced next week (mackonstan,
14:44:40)
- Physical Infrastructure (mackonstan, 14:45:02)
- Maciek, lab extension 2021 is going
ahead. (mackonstan,
14:51:04)
- Maciek, vendor equipment funding agreement -
WIP, vendors' reps are gathering every 2 weeks to progress this, I'm
coordinating. (mackonstan,
14:52:16)
- Virtual Infrastructure, CI/CD (mackonstan, 14:52:28)
- Dave, no issues (apart from fdio-yul vpn outage
for EU folks) (mackonstan,
14:52:54)
- Juraj, new issue in vpp_Device, not all
interfaces are seen in vpp after vpp start, symptom similar to
previous issue we had, but root cause likely different. Detail in
jira "vfio is busy when initializing VPP with multiple VPP instances
using different VFs" (mackonstan,
14:55:49)
- https://jira.fd.io/browse/VPP-1986
(mackonstan,
14:55:56)
- Peter, would like to go about it differently
compared to previous issue we had. Don't wait too long for
resolution from Intel side, instead of switch to AVF. (mackonstan,
14:57:34)
- Fan, would like to see logs from Xeon
platform. (mackonstan,
14:57:48)
- Juraj, also observed this issue with
AVF. (mackonstan,
14:58:04)
Meeting ended at 14:59:24 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (51)
- vrpolak (5)
- collab-meetbot (4)
- jlinkes (1)
- tifrank (1)
- dwallacelf (1)
- fan_zhang (1)