- Inputs from projects - VPP (mackonstan, 14:02:12)
- Andrew: vpp v21.01.1 maintenance is almost
out (mackonstan,
14:03:09)
- Maciek: Need to agree what and when should be
CSIT tested in v21.01.1. (mackonstan,
14:04:02)
- Inputs from projects - VSAP (mackonstan, 14:04:25)
- No updates. (mackonstan,
14:04:54)
- Inputs from projects - TSC (mackonstan, 14:05:05)
- Vratko: re TSC update, there will be election
for committer-at-large. Ed is creating a mailer for FD.io committers
only to facilitate the process. (mackonstan,
14:06:07)
- This will be followed by TSC appointing the
members. (mackonstan,
14:06:44)
- New performance tests - GTPU tests (mackonstan, 14:07:16)
- New functional Tests (mackonstan, 14:07:31)
- Dave Wallace (dwallacelf,
14:08:22)
- Fan: re flow "offload" patch - would like to
know the status of adding E810 NICs to vpp_device 1n-clx
testbeds. (mackonstan,
14:08:33)
- Peter: still working on it. (mackonstan,
14:08:52)
- Juraj Linkeš (jlinkes,
14:10:21)
- Maciek: aside, will open the ticket tracking
all new HW shipment status (one of the QSFP28 cables to be used for
E810 in 1n-clx testbeds). (mackonstan,
14:12:31)
- Juraj: re IPsec SPD entry tests, separate
patches for inbound and outbound, 1 patch merged, 2
outstanding. (mackonstan,
14:14:30)
- Releases CSIT-2106 (mackonstan, 14:15:49)
- Tibor: things looking quite well, almost all
tests are finished. Only coverage 3n-skx, 2n-zn2, 3n-tsh are
finishing, less than 50% remaining. (mackonstan,
14:17:11)
- Tibor: report status, some methodologies
sections are missing, added TODO placeholders for methodology
sections. (mackonstan,
14:18:30)
- Fan: content for gtpu test methodology and
ipsec async crypto methodology is available, will push
patches (mackonstan,
14:20:23)
- Maciek: here are the pointers to the right
places in the report .rst files (mackonstan,
14:22:02)
- Maciek: gtpusw pointer (mackonstan,
14:22:16)
- https://git.fd.io/csit/tree/docs/report/introduction/methodology_tunnel_encapsulations.rst#n40
(mackonstan,
14:22:21)
- Maciek: ipsec async pointer (mackonstan,
14:22:36)
- https://git.fd.io/csit/tree/docs/report/introduction/methodology_ipsec.rst#n50
(mackonstan,
14:22:58)
- Tibor: everything else got merged, CSIT-2106
report generation job started 2hrs ago in rls2106 branch. Should be
published within the next 2hrs. (mackonstan,
14:25:52)
- Vratko: two main regression RCAs under
investigation: a) ipsec, b) nat44ed cps low scale (PDR results
unstable). RCA markup would need to be added in the next maintenance
version of csit-2106 report. (mackonstan,
14:31:38)
- Vratko: should mention performance issues with
IPsec crypto async tests. (mackonstan,
14:34:28)
- https://gerrit.fd.io/r/c/vpp/+/30386
(fan_zhang,
14:34:32)
- Fan: IPsec crypto async performance tests
failing is related to this patch not being merged (mackonstan,
14:36:28)
- https://gerrit.fd.io/r/c/vpp/+/30386
(mackonstan,
14:36:36)
- Maciek: looks like IPsec async crypto VPP code
is broken. Need to add this to CSIT-2106 rls notes. (mackonstan,
14:39:15)
- Vratko: IPsec async crypto VPP, some tests pass
but with low performance, likely to be related to the same
issue. (mackonstan,
14:40:35)
- Vratko: will test the aforementioned patch, to
see if issue is gone. (mackonstan,
14:40:55)
- Discussion about how to catch important
feature-enabling and bug-fix VPP patches that are neglected, and
making the feature broken. (mackonstan,
14:45:05)
- Release - CSIT-2101.1 (mackonstan, 14:46:07)
- VPP v21.01.1 is almost out (mackonstan,
14:46:26)
- Need to decide about CSIT coverage ...
(mackonstan,
14:46:42)
- Dave: last time we picked up a subset of tests,
and run lower number of iterations for them. (mackonstan,
14:47:40)
- Dave: it was more a smoke-test than anything
else. (mackonstan,
14:48:11)
- Vratko: proposal - use existing iterative
job_specs, just run a single iteration, and see if results fall
within the avg+/-stdev of the previous full report run. Would need
to add a new type of comparison table. (mackonstan,
14:50:25)
- Maciek, Vratko: no coverage tests. (mackonstan,
14:50:44)
- Dave: if results fall outside the avg+/-stdev,
then do RCAs. (mackonstan,
14:51:51)
- Tibor, Maciek: will take a closer look at
scheduling CSIT-2101.1 tests. (mackonstan,
14:53:02)
- Tibor: MRR trending tests run at reduced
cadence of twice a week at the moment. Need to analyse when we are
returning to daily cadence. (mackonstan,
14:54:20)
- Physical Infrastructure (mackonstan, 14:56:31)
- Maciek, Peter: hsw servers are to be fully
decommissioned. (mackonstan,
14:57:32)
- Virtual Infrastructure, CI/CD (mackonstan, 14:57:46)
- Dave, virtual infra and CI infra are stable.
Vanessa is testing the Jenkins upgrade in the sandbox, assuming it's
stable, the production maintenance is scheduled for 19-Jul.
(mackonstan,
14:58:32)
- Trending (mackonstan, 14:59:57)
- https://gerrit.fd.io/r/c/vpp/+/32878/7#message-51b619758963db4106d55d3da07300ddbe6928b6
<-- scale tests fail in master (vrpolak,
15:00:55)
- Vratko, CSIT ip4 and ip6 scale test are failing
as VAT functionality that is used has been removed from VPP code as
part of refactor. (mackonstan,
15:00:58)
Meeting ended at 15:01:57 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (58)
- collab-meetbot` (6)
- vrpolak (2)
- fan_zhang (2)
- tifrank (1)
- pmikus (1)
- dwallacelf (1)
- jlinkes (1)
Generated by MeetBot 0.1.4.