========================================= #fdio-meeting: FD.io CSIT project meeting ========================================= Meeting started by mackonstan at 13:59:11 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/fdio-meeting/2021/fd_io_csit_project_meeting/fdio-meeting-fd_io_csit_project_meeting.2021-07-14-13.59.log.html . Meeting summary --------------- * Tibor Frank (tifrank, 14:00:13) * Peter Mikus (pmikus, 14:00:23) * Vratko Polak. (vrpolak, 14:00:33) * Fan Zhang (fan_zhang, 14:00:37) * mackonstan (mackonstan, 14:00:38) * Agenda bashing (mackonstan, 14:01:26) * Inputs from projects - VPP (mackonstan, 14:02:12) * Andrew: vpp v21.01.1 maintenance is almost out (mackonstan, 14:03:09) * Maciek: Need to agree what and when should be CSIT tested in v21.01.1. (mackonstan, 14:04:02) * Inputs from projects - VSAP (mackonstan, 14:04:25) * No updates. (mackonstan, 14:04:54) * Inputs from projects - TSC (mackonstan, 14:05:05) * Vratko: re TSC update, there will be election for committer-at-large. Ed is creating a mailer for FD.io committers only to facilitate the process. (mackonstan, 14:06:07) * This will be followed by TSC appointing the members. (mackonstan, 14:06:44) * New performance tests - GTPU tests (mackonstan, 14:07:16) * New functional Tests (mackonstan, 14:07:31) * Dave Wallace (dwallacelf, 14:08:22) * Fan: re flow "offload" patch - would like to know the status of adding E810 NICs to vpp_device 1n-clx testbeds. (mackonstan, 14:08:33) * Peter: still working on it. (mackonstan, 14:08:52) * Juraj Linkeš (jlinkes, 14:10:21) * Maciek: aside, will open the ticket tracking all new HW shipment status (one of the QSFP28 cables to be used for E810 in 1n-clx testbeds). (mackonstan, 14:12:31) * Juraj: re IPsec SPD entry tests, separate patches for inbound and outbound, 1 patch merged, 2 outstanding. (mackonstan, 14:14:30) * Releases CSIT-2106 (mackonstan, 14:15:49) * Tibor: things looking quite well, almost all tests are finished. Only coverage 3n-skx, 2n-zn2, 3n-tsh are finishing, less than 50% remaining. (mackonstan, 14:17:11) * Tibor: report status, some methodologies sections are missing, added TODO placeholders for methodology sections. (mackonstan, 14:18:30) * Fan: content for gtpu test methodology and ipsec async crypto methodology is available, will push patches (mackonstan, 14:20:23) * Maciek: here are the pointers to the right places in the report .rst files (mackonstan, 14:22:02) * Maciek: gtpusw pointer (mackonstan, 14:22:16) * LINK: https://git.fd.io/csit/tree/docs/report/introduction/methodology_tunnel_encapsulations.rst#n40 (mackonstan, 14:22:21) * Maciek: ipsec async pointer (mackonstan, 14:22:36) * LINK: https://git.fd.io/csit/tree/docs/report/introduction/methodology_ipsec.rst#n50 (mackonstan, 14:22:58) * Tibor: everything else got merged, CSIT-2106 report generation job started 2hrs ago in rls2106 branch. Should be published within the next 2hrs. (mackonstan, 14:25:52) * Vratko: two main regression RCAs under investigation: a) ipsec, b) nat44ed cps low scale (PDR results unstable). RCA markup would need to be added in the next maintenance version of csit-2106 report. (mackonstan, 14:31:38) * Vratko: should mention performance issues with IPsec crypto async tests. (mackonstan, 14:34:28) * LINK: https://gerrit.fd.io/r/c/vpp/+/30386 (fan_zhang, 14:34:32) * Fan: IPsec crypto async performance tests failing is related to this patch not being merged (mackonstan, 14:36:28) * LINK: https://gerrit.fd.io/r/c/vpp/+/30386 (mackonstan, 14:36:36) * Maciek: looks like IPsec async crypto VPP code is broken. Need to add this to CSIT-2106 rls notes. (mackonstan, 14:39:15) * Vratko: IPsec async crypto VPP, some tests pass but with low performance, likely to be related to the same issue. (mackonstan, 14:40:35) * Vratko: will test the aforementioned patch, to see if issue is gone. (mackonstan, 14:40:55) * Discussion about how to catch important feature-enabling and bug-fix VPP patches that are neglected, and making the feature broken. (mackonstan, 14:45:05) * Release - CSIT-2101.1 (mackonstan, 14:46:07) * VPP v21.01.1 is almost out (mackonstan, 14:46:26) * Need to decide about CSIT coverage ... (mackonstan, 14:46:42) * Dave: last time we picked up a subset of tests, and run lower number of iterations for them. (mackonstan, 14:47:40) * Dave: it was more a smoke-test than anything else. (mackonstan, 14:48:11) * Vratko: proposal - use existing iterative job_specs, just run a single iteration, and see if results fall within the avg+/-stdev of the previous full report run. Would need to add a new type of comparison table. (mackonstan, 14:50:25) * Maciek, Vratko: no coverage tests. (mackonstan, 14:50:44) * Dave: if results fall outside the avg+/-stdev, then do RCAs. (mackonstan, 14:51:51) * Tibor, Maciek: will take a closer look at scheduling CSIT-2101.1 tests. (mackonstan, 14:53:02) * Tibor: MRR trending tests run at reduced cadence of twice a week at the moment. Need to analyse when we are returning to daily cadence. (mackonstan, 14:54:20) * Physical Infrastructure (mackonstan, 14:56:31) * Maciek, Peter: hsw servers are to be fully decommissioned. (mackonstan, 14:57:32) * Virtual Infrastructure, CI/CD (mackonstan, 14:57:46) * Dave, virtual infra and CI infra are stable. Vanessa is testing the Jenkins upgrade in the sandbox, assuming it's stable, the production maintenance is scheduled for 19-Jul. (mackonstan, 14:58:32) * Trending (mackonstan, 14:59:57) * LINK: https://gerrit.fd.io/r/c/vpp/+/32878/7#message-51b619758963db4106d55d3da07300ddbe6928b6 <-- scale tests fail in master (vrpolak, 15:00:55) * Vratko, CSIT ip4 and ip6 scale test are failing as VAT functionality that is used has been removed from VPP code as part of refactor. (mackonstan, 15:00:58) Meeting ended at 15:01:57 UTC. People present (lines said) --------------------------- * mackonstan (58) * collab-meetbot` (6) * vrpolak (2) * fan_zhang (2) * tifrank (1) * pmikus (1) * dwallacelf (1) * jlinkes (1) Generated by `MeetBot`_ 0.1.4