#fdio-meeting: FD.io CSIT project meeting

Meeting started by mackonstan at 14:04:47 UTC (full logs).

Meeting summary

    1. mackonstan (mackonstan, 14:04:56)
    2. Dave Wallace (dwallacelf, 14:04:58)
    3. Vratko Polak. (vrpolak, 14:05:05)

  1. Agenda bashing (mackonstan, 14:05:16)
  2. Inputs from projects (mackonstan, 14:05:57)
    1. Andrew, VPP all good, v21.10 on target, rls next week (mackonstan, 14:07:05)
    2. Dave, re VSAP - no updates (mackonstan, 14:07:18)

  3. E810 flow "offload" tests (mackonstan, 14:09:16)
    1. Peter, device tests are broken, Fan to take care of these breakages, see thread on csit-dev (mackonstan, 14:09:59)

  4. IPsec SPD flow cache patches (mackonstan, 14:10:17)
    1. Juraj: features and tests are split between inbound and outbound. Base tests and the new ones that use outbound cache tests have been merged, want to add them to mrr daily jobs for Arm testbeds. (mackonstan, 14:12:24)

  5. Scale tests: ip4, ip6, nat, ipsec. (mackonstan, 14:12:51)
    1. Maciek, Vratko: tests used to be quick enough in previous release, now they are not fast enough (ip4scale2m, ip6scale2m, nat44ed 16m sessions, ipsec 60k tunnels) (mackonstan, 14:15:46)
    2. Tibor: perf jobs execution time, original goals were set to 12hrs for mrr_daily and 24hrs for ndrpdr_weekly, both goals are violated by a number of jobs (mackonstan, 14:37:38)
    3. Maciek: in summary then, tests that we want to keep need to be added to job_specs (at minimum to weekly_mrr), otherwise they must be removed from master (mackonstan, 14:48:52)
    4. Tibor, Maciek - will lead on the cleanup patches following the discussion on the call today, target is to bring the execution time in line with the set goals ASAP (mackonstan, 14:50:06)

  6. Release CSIT-2110 (mackonstan, 14:50:38)
    1. Tibor, rc2 testing is looking good, including coverage test spot-checks (mackonstan, 14:51:00)
    2. Vratko, re regressions, nothing new vs trending, need to look at the new af_xdp behaviour (mackonstan, 14:51:46)

  7. physical infra (mackonstan, 14:52:57)
    1. Maciek, lab extension 2022, guesstimates to be produced for next week (mackonstan, 14:53:38)

  8. virtual infra (mackonstan, 14:53:44)
    1. patch in https://gerrit.fd.io/r/c/csit/+/34045 (jlinkes, 14:55:19)
    2. Juraj, have a CSIT fix for VPP-1986 issue (mackonstan, 14:55:27)

  9. trending (mackonstan, 14:56:26)
    1. Juraj, re VPP-1995 i40e driver issue, vlan stripping got removed from VFs in the updated driver, Damjan confirmed this (mackonstan, 14:59:53)
    2. Maciek, propose to reawake the email thread with Intel contacts on the firmware/driver compatibility, and inject this topic there (mackonstan, 15:00:15)


Meeting ended at 15:00:38 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan (26)
  2. collab-meetbot (3)
  3. dwallacelf (1)
  4. vrpolak (1)
  5. jlinkes (1)


Generated by MeetBot 0.1.4.