Meeting started by mackonstan at 14:58:46 UTC
(full logs).
Meeting summary
-
- Peter Mikus (pmikus,
14:59:51)
- Tibor Frank (tifrank,
15:00:03)
- Agenda bashing. (mackonstan, 15:03:20)
- Inputs from projects - VPP (mackonstan, 15:03:35)
- Vratko Polak. (vrpolak,
15:03:51)
- Inputs from projects - VSAP (mackonstan, 15:04:01)
- Inputs from projects - TSC (mackonstan, 15:04:07)
- Maciek - got a ping from Trishan re submitting
FD.io CSIT talk, and I did submit one, see later in the
agenda (mackonstan,
15:05:11)
- New or refactored tests (mackonstan, 15:05:26)
- Dave Wallace (dwallacelf,
15:05:43)
- E810 flow "offload" tests - perf:
work-in-progress - TBC (mackonstan,
15:05:55)
- Scale tests - Any remaining perf test jobs with
excessive execution time? - Tibor - most jobs are under the
limit (mackonstan,
15:06:44)
- Tibor - 2n-clx-mlr and 2n-skx-mlr weekly jobs
take 35hrs and ~29hrs, respectively. Not a big issue as we have 3
and 4 testbed instances respectively. (mackonstan,
15:08:07)
- Maciek - let's revise those two, and see what
needs to be done to bring it down below the target of 24hrs.
(mackonstan,
15:09:22)
- Maciek, Tibor - the good news is that iterative
daily jobs are all <12hrs in duration (mackonstan,
15:09:49)
- E810 flow "offload" tests - perf:
work-in-progress - Fan reporting - team has been discussing this,
need to revise which of the functional tests make sense to port to
performance tests (mackonstan,
15:13:35)
- Fan, Maciek will follow up on this, and see
what perf tests make sense. It is unclear if CSIT-2202 milestones
times can be met, we only have few working weeks left due to
extended Xmas and year-end breaks and shutdown. (mackonstan,
15:14:44)
- Releases 2202 (mackonstan, 15:15:34)
- https://wiki.fd.io/view/CSIT/csit2202_plan
(mackonstan,
15:16:59)
- Releases 2110 (mackonstan, 15:17:04)
- Tibor, got new data from Intel for icx, will
add to report CSIT-2110 maintenance ver (mackonstan,
15:17:32)
- Maciek, intel also provided updated BIOS and
bare-metal config info, will add to repo and update report
accordingly (mackonstan,
15:18:13)
- Physical Infrastructure (mackonstan, 15:18:41)
- Lab extension - Peter reporting - Initial 5
Intel ICX servers arrived and being installed and
commissioned (mackonstan,
15:19:45)
- Peter, rack layout designed, upstreamed to
gerrrit, sent to Vexxhost through ticket and slack (mackonstan,
15:20:13)
- Peter, received update that servers are
assembled and (to be?) racked and cabled (mackonstan,
15:20:42)
- Peter, going ahead with 1 x 2n-icx, 1 x
3n-icx. (mackonstan,
15:22:59)
- Juraj, Maciek, Ampere Ultra servers are
expected in January, but no hard commitmment (mackonstan,
15:25:34)
- Maciek, talking with Vexxhost this Friday,
hoping for the remaining supermicro parts to arrive in January, so
this fits. (mackonstan,
15:25:55)
- Peter, stretch-goal to get 1 x 2n-icx, 1 x
3n-icx up-and-running and in production before Xmas / year-end
break, but time is quickly running out. (mackonstan,
15:27:07)
- Virtual Infrastructure, CI/CD (mackonstan, 15:27:38)
- New Docker images for CI which fixed VPP rdma
plugin missing (dwallacelf,
15:31:05)
- Docs job clean up for all prjects were merged
& LF ticket opened to manage data migration from nexus to amazon
s3 (dwallacelf,
15:32:26)
- https://jira.linuxfoundation.org/plugins/servlet/theme/portal/2/IT-23352
(dwallacelf,
15:32:30)
- vpp device job on arm enabled per patch,
non-voting (dwallacelf,
15:33:03)
- Topic Environment, Framework (dwallacelf,
15:36:38)
- Environment, Framework (dwallacelf, 15:36:59)
- Fan reported VPP upgrade of dpdk to 21.11
testing in progress, email to csit-dev & patch to vpp related to
this upgrade in next day or two. (dwallacelf,
15:38:30)
- Vratko noted dpdk testpmd issues are showing up
in csit testing with dpdk latest (dwallacelf,
15:39:19)
- Trending (dwallacelf, 15:40:03)
- testpmd error message:
/tmp/openvpp-testing/dpdk/build/app/dpdk-testpmd: invalid option --
'w' (vrpolak,
15:40:05)
- https://s3-logs.fd.io/vex-yul-rot-jenkins-1/csit-dpdk-perf-mrr-weekly-master-2n-skx/174/log.html.gz#s1-s1-s1-s1-t2-k1-k4-k4-k1-k4
<-- testpmd message visible here. (vrpolak,
15:40:51)
- VPP-1995: Update reported to Ray K @
Intel (dwallacelf,
15:43:26)
- Fan reports Intel feature dev team now
understands issue and will work with VPP & DPDK team to resolve
the issue. (dwallacelf,
15:44:42)
- VPP-1986: Resolved previously, removed from
agenda (dwallacelf,
15:46:04)
- Vratko to loop in VPP developers, but only
occurs on zen platform (dwallacelf,
15:57:07)
- error 2 has fix waiting for review (dwallacelf,
15:58:25)
- https://gerrit.fd.io/r/c/vpp/+/30386
(fan_zhang,
15:58:41)
- error 3 has fix in progress (dwallacelf,
15:59:00)
- https://gerrit.fd.io/r/c/vpp/+/30386
(dwallacelf,
15:59:11)
- https://gerrit.fd.io/r/c/vpp/+/30386
(dwallacelf,
15:59:13)
- error 4: needs rca, no update (dwallacelf,
15:59:59)
- outstanding fixes should be confirmed next week
and moved to fixed column (dwallacelf,
16:00:58)
Meeting ended at 16:02:11 UTC
(full logs).
Action items