#fdio-meeting: FD.io CSIT Project Meeting
Meeting started by mackonstan at 15:00:00 UTC
(full logs).
Meeting summary
-
- Maciek Konstantynowicz (mackonstan,
15:00:10)
- Tibor Frank (tifrank,
15:01:58)
- Agenda bashing (mackonstan, 15:02:00)
- Vratko Polak. (vrpolak,
15:02:06)
- Inputs from projects - VPP (mackonstan, 15:03:30)
- Fan Zhang (fan_zhang,
15:03:41)
- Andrew, v22.02 artifacts being pushed to
packagecloud (mackonstan,
15:03:59)
- Andrew, into rls directory, should be done in
couple hours (mackonstan,
15:04:16)
- Andrew, few fixes came late, yday, i) vxlan
fixing a crash in masterthat changed meaning of api and introduced
another problem, now reverted; ii) mtu callback related for memif,
virtio, may have meaningful impact on jumbo tests; (mackonstan,
15:09:06)
- Fan, related to above, chatted with dpdk dev
who authored mtu/mfs changes in dpdk. this was done to unify mfs/mtu
handing across multiple nic models and taking care of encap/decap
offload in nic's (mackonstan,
15:10:37)
- Dave Wallace (dwallacelf,
15:12:08)
- Fan, re dpdk performance degradation report by
Vratko in vpp-dev: this could, but because of defaulting to 1518B
mfs/mtu, avx2 rx_burst functional call in linear mode (using couple
of mbufs, with additional check), previously vpp was receiving 256
frames in one go, now it's 64 frames. (mackonstan,
15:15:26)
- Peter, looking at dpdk init debug, after
interfaces go up, one can see dpdk rx_burst working with avx2 in
linear mode (mackonstan,
15:17:24)
- Fan, need to double click if it's really the
root cause behind the vpp rc2 regressions reported by Vratko on
vpp-dev, 5-15% (feature-simple tests) throughput drop (mackonstan,
15:19:22)
- Vratko, Maciek, I/O "heavy" regression, the
more features one uses, the lower the regerssion; the simpler the
config the higher regression. (mackonstan,
15:20:04)
- Inputs from projects - TSC (mackonstan, 15:20:50)
- Maciek, Dave, hw budget allocation for dram for
arm build servers, and mlx connectx5s for trex 100ge nics for clx
testbeds (mackonstan,
15:23:02)
- Dave, TSC chair nomination period is coming to
an end this week (mackonstan,
15:23:43)
- Dave, this will be followed by voting among TSC
members (mackonstan,
15:23:56)
- New or (to be) refactored tests (mackonstan, 15:24:20)
- VPP RC1, RC2 hot patch(es) items (mackonstan, 15:25:28)
- Peter, i) jumbo frames are supported in af_xdp
kernel code up to "memory alignment" ~3kB, no support for 9000B; ii)
jumbo frames issue with vpp memif, bug to be tracked re support
mtu; (mackonstan,
15:28:13)
- Vratko, iii) found the place where vpp sets
default IP MTU to 9000B. (mackonstan,
15:29:46)
- Maciek, suggesting to discuss on csit-dev
mailer how to re-design existing csit jumbo frame size tests
(mackonstan,
15:31:11)
- Releases CSIT-2202 (mackonstan, 15:31:35)
- Tibor, all planned rc2 iterative tests are
done; all but 2 coverage tests are done too. (mackonstan,
15:32:01)
- Tibor, all data is in master ver of
report (mackonstan,
15:32:12)
- Tibor, failed tests, nothing unexpected, only
known issues. Vratko working thru them, Viliam composed summary,
sent to csit-report. (mackonstan,
15:34:21)
- Tibor, draft report dynamic content validation,
still to be completed fully (mackonstan,
15:35:31)
- Tibor, 2n-cix and 3n-icx testbeds added
(mackonstan,
15:35:50)
- Tibor, static content updates - rls notes,
RCA (mackonstan,
15:36:08)
- Tibor, static content - need to update
environment versions (mackonstan,
15:36:26)
- Tibor, 1st rls results expected to be making
its way into master report draft on Mon or Tue next week
(mackonstan,
15:37:42)
- Vratko, commenting on rc2 regressions, per
email to vpp-dev (mackonstan,
15:38:28)
- https://lists.fd.io/g/vpp-dev/message/20888
(mackonstan,
15:38:34)
- Vratko, tsh tests are affected by TRex
calibration … (mackonstan,
15:38:59)
- Vratko, for some regressions need more then 5
iterative runs (mackonstan,
15:41:08)
- Physical Infrastructure (mackonstan, 15:47:13)
- re delayed shipment of supermicro systems for
ICX - 2 units expected next week per vexxhost ticket (mackonstan,
15:49:56)
- https://support.vexxhost.com/hc/en-us/requests/361959
(mackonstan,
15:50:03)
- Peter, 2 ampere perf servers are in transit per
latest DHL updates (mackonstan,
15:50:52)
- Virtual Infrastructure, CI/CD (mackonstan, 15:51:39)
- Dave, Peter, s3 migration is happening in the
background, vpp docs are taking time, csit is done (mackonstan,
15:52:34)
- Environment, Framework (mackonstan, 15:52:47)
- Andrew, Vratko, been discussing improvements in
the are of CSIT CLI and API usage, and tracking VPP API changes in
automated fashion (mackonstan,
15:54:29)
- Trending (mackonstan, 15:55:26)
Meeting ended at 16:12:32 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (45)
- collab-meetbot (4)
- tifrank (1)
- vrpolak (1)
- fan_zhang (1)
- dwallacelf (1)
Generated by MeetBot 0.1.4.