#fdio-meeting: FD.io CSIT Project Meeting

Meeting started by mackonstan at 14:02:31 UTC (full logs).

Meeting summary

    1. mackonstan (mackonstan, 14:02:59)
    2. Vratko Polak. (vrpolak, 14:03:02)
    3. Viliam Luc (viliamluc, 14:03:17)
    4. Tibor Frank (tifrank, 14:04:43)

  1. Agenda bashing (mackonstan, 14:05:36)
  2. Inputs from projects - VPP (mackonstan, 14:09:08)
    1. Andrew, 3 weeks to rc1 (mackonstan, 14:09:34)

  3. Inputs from projects - TSC (mackonstan, 14:10:18)
    1. Maciek, Dave is still working on clarifying the 2022 budget situation, esp. the AWS piece (mackonstan, 14:11:08)

  4. New or being refactored tests (mackonstan, 14:11:33)
  5. CSIT hot items - AMD performance results review (mackonstan, 14:13:27)
    1. Juraj Linkeš (jlinkes, 14:25:34)
    2. Keesang, reviewed materials provided by Maciek, will provide more detail about the performance discrepancy over email (mackonstan, 14:27:06)
    3. Keesang, also updated the Spectre-BHB security advisory for AMD in the patch (mackonstan, 14:27:28)

  6. Releases CSIT-2206 (mackonstan, 14:27:48)
  7. Physical Infrastructure (mackonstan, 14:28:19)
    1. Maciek, re outstanding ICX supermicro servers, 1 server shipped, 9 outstanding from the order placed in july 2021 (mackonstan, 14:29:21)
    2. Juraj, Arm team has been looking at the new Ampere Ultra VPP performance (mackonstan, 14:31:44)
    3. Juraj, compared to previously discussed numbers, current numbers are lower than before due to security fixes of some description (mackonstan, 14:31:53)
    4. http://git.dpdk.org/dpdk/commit/?id=778602fe570a138224de94a38eca3ce2e344138c (jlinkes, 14:32:46)
    5. Juraj, there is also dependency on how VPP is built (ultra servers), but doing generic aarch64 build, not a native build for ultra n1 soc (mackonstan, 14:36:00)
    6. Juraj, arm team is currently testing with 1GB hugepages, vs CSIT 2MB (mackonstan, 14:36:22)
    7. Juraj, but overall the performance numbers are considered representative (mackonstan, 14:36:43)
    8. Keesang, still considering sending newer AMD servers to be sent to the lab (mackonstan, 14:37:39)
    9. Keesang, will share the draft plan before the next CSIT meeting (mackonstan, 14:38:46)
    10. Maciek, PEter, Snowridge servers haven't arrived (mackonstan, 14:39:19)
    11. Peter, MLX NICs into TRex for CVL testing. using on 2n-clx to calibrate TRex 100 GbE performance. (mackonstan, 14:40:18)

  8. Virtual Infrastructure, CI/CD (mackonstan, 14:40:46)
  9. Trending (mackonstan, 14:42:13)
    1. Viliam, Maciek, total of 8 open test failures currently in trending, see the list (mackonstan, 14:44:17)


Meeting ended at 15:00:13 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan (27)
  2. collab-meetbot (4)
  3. jlinkes (2)
  4. vrpolak (1)
  5. viliamluc (1)
  6. tifrank (1)
  7. dwallacelf (1)


Generated by MeetBot 0.1.4.