13:58:17 <mackonstan> #startmeeting FD.io CSIT Project Meeting 13:58:17 <collab-meetbot> Meeting started Wed May 25 13:58:17 2022 UTC and is due to finish in 60 minutes. The chair is mackonstan. Information about MeetBot at http://wiki.debian.org/MeetBot. 13:58:17 <collab-meetbot> Useful Commands: #action #agreed #help #info #idea #link #topic #startvote. 13:58:17 <collab-meetbot> The meeting name has been set to 'fd_io_csit_project_meeting' 13:58:22 <mackonstan> #info mackonstan 14:04:26 <vrpolak> #info Vratko Polak. 14:05:20 <mackonstan> #topic Agenda Bashing 14:05:36 <mackonstan> #topic Inputs from projects - VPP 14:05:46 <mackonstan> #info Andrew, rc1 ready in coupld of hours 14:06:17 <mackonstan> #topic Inputs from projects - TSC 14:07:17 <mackonstan> #info Vratko, call for participation in on-site fd.io events - details on TSC wiki 14:07:34 <mackonstan> #topic New or being refactored tests - flow tests 14:07:45 <mackonstan> #info Maciek, some patches in progress, status TBC by Fan 14:07:49 <tifrank> #info Tibor Frank 14:08:54 <mackonstan> #info Maciek, re CVL flow device tests, CVL FW and driver updated by Peter, so csit flow test patches should be unblocked 14:09:29 <mackonstan> #topic VPP and CSIT hot items 14:09:53 <mackonstan> #info Maciek, re spectre-bhb - no change in status 14:10:13 <mackonstan> #info Maciek, re amd perf results review - waiting for feedback from amd team 14:10:27 <mackonstan> #topic Release CSIT-2206 14:11:20 <mackonstan> #info Tibor, once vpp rc1 is born, will be pulling the csit branch, and preparing for rc1 single run tests 14:11:52 <mackonstan> #info Tibor, job specs and draft report specs are in place 14:16:56 <dwallacelf> #info Dave Wallace 14:18:18 <mackonstan> #info Deliverables: 100 GbE tests for MLX and CVL, telemetry vpp perfmon and linux perf, CSIT UTI, 3n-alt and 3n-snr (tbc), mlrsearch tunings (better handling of unstable tests lower avg/lower stdev), cvl 100gbe flow tests for gtpu and ipsec. 14:18:47 <mackonstan> #topic Physical Infrastructure 14:22:37 <fan_zhang> #info Fan Zhang 14:31:08 <mackonstan> #info Maciek, SuperMicro confirmed back to Vexxhost that are not able to fulfil the rest of the order of 8 chassis+motherboard systems for ICX. 14:31:37 <mackonstan> #info Peter, with 2x SNR install, two skx servers got decommissioned. 14:34:56 <mackonstan> #topic E810 flow "offload" tests 14:35:06 <mackonstan> #info Fan, both device and perf tests should be running 14:35:30 <mackonstan> #info Fan, ipsec policy tests with flow director 14:35:45 <fan_zhang> #info https://gerrit.fd.io/r/c/csit/+/36119 IPsec flow perf test 14:37:00 <mackonstan> #info Fan, gtpu tests also 14:39:24 <mackonstan> #topic Virtual Infrastructure, CI/CD 14:39:46 <mackonstan> #info Dave, stable/2206 jobs created 14:42:27 <mackonstan> #topic Trending 14:43:03 <mackonstan> #info Viliam reporting on two new failures, see link to csit-report email 14:43:10 <mackonstan> #link https://lists.fd.io/g/csit-report/message/5704 14:45:49 <mackonstan> #endmeeting