#fdio-meeting: FD.io CSIT Project Meeting

Meeting started by mackonstan at 15:00:39 UTC (full logs).

Meeting summary

    1. Tibor Frank (tifrank, 15:01:01)
    2. mackonstan (mackonstan, 15:02:21)
    3. Juraj Linkeš (jlinkes, 15:02:22)
    4. viliam luc (viliamluc, 15:02:54)

  1. Inputs from projects (mackonstan, 15:03:26)
    1. Vratko Polak. (vrpolak, 15:04:26)
    2. Andrew: Dave tweaked script to auto-abandon vpp changes untouched for long time; vpp rls v23.02 schedule published (mackonstan, 15:04:49)

  2. E810 flow "offload" tests (mackonstan, 15:05:46)
    1. Kai: Intel internal figures look better - see summary in email "VPP CSIT meeting update" sent 09-Nov (mackonstan, 15:07:51)

  3. Scale tests API optimization (mackonstan, 15:08:56)
    1. Vratko: need to update the patch after csit-2210, and then re-test to check impact on daily trending executions fitting below 12hrs (mackonstan, 15:09:51)

  4. CSIT env move to Ubuntu 22.04 (mackonstan, 15:11:04)
    1. Maciek: before dnv testbeds get decomissioned, it would be good to validate 3n-snr results as per csit-2210, see link below; Kai kindly agree to lead this from Intel (mackonstan, 15:13:11)
    2. https://s3-docs.fd.io/csit/rls2210/report/vpp_performance_tests/packet_throughput_graphs/ip4-3n-dnv-x553.html (mackonstan, 15:14:00)
    3. https://s3-docs.fd.io/csit/rls2210/report/vpp_performance_tests/packet_throughput_graphs/ip4-3n-snr-e822cq.html (mackonstan, 15:14:11)

  5. CSIT-2210 (mackonstan, 15:19:56)
    1. Tibor: updates to report - updates to static content, and RCAs from Vratko (mackonstan, 15:20:22)
    2. Vratko: re RCAs added 2 items related to trex change, clang change (arm only), vpp change affecting ipsec spe tests ca. -5% (mackonstan, 15:25:02)

  6. CSIT-2210 (mackonstan, 15:25:50)
  7. CSIT-2302 (mackonstan, 15:26:31)
    1. Maciek: schedule published in wiki (mackonstan, 15:28:45)
    2. https://wiki.fd.io/view/CSIT/csit2302_plan (mackonstan, 15:29:45)

  8. Physical Infrastructure (mackonstan, 15:30:07)
    1. Dave: need a plan to decommission skx testbeds before spr hardware arrives in the new year (mackonstan, 15:31:56)

  9. Virtual Infrastructure, CI/CD (mackonstan, 15:33:19)
    1. Dave: would like to replace very old nomad machines with re-used skx, need a plan (mackonstan, 15:34:22)

  10. Trending (mackonstan, 15:34:35)
    1. Viliam: update on trending failures and rls failures (mackonstan, 15:41:45)
    2. Viliam: working on vpp vcl nginx tests, few manual runs worked, once running next steps: Tibor and Maciek work out the plan for executing those tests in trending and onboarding into csit-dash (mackonstan, 15:49:50)


Meeting ended at 15:51:15 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan (29)
  2. collab-meetbot` (9)
  3. jlinkes (3)
  4. tifrank (1)
  5. viliamluc (1)
  6. vrpolak (1)


Generated by MeetBot 0.1.4.