    1. Juraj Linkeš (jlinkes, 15:03:13)
    2. mackonstan (mackonstan, 15:04:17)
    3. Vratko Polak. (vrpolak, 15:04:32)

  1. Agenda bashing (mackonstan, 15:05:35)
  2. VPP project updates (mackonstan, 15:05:42)
    1. Andrew rc1 in progress today (mackonstan, 15:05:58)
    2. Andrew so far according to plan (mackonstan, 15:06:19)

  3. FD.io TSC update (mackonstan, 15:06:32)
    1. Vratko - some discussion in the last meeting about a new way to log into LFN project meetings using LF id - see meeting notes (mackonstan, 15:08:46)

  4. E810 flow "offload" tests (mackonstan, 15:09:20)
    1. Kai - discussed with Yulong, still seeing discrepancies between perf results in CSIT labs and Intel labs. (mackonstan, 15:11:02)
    2. Kai - suspecting HW differences between the two environments. (mackonstan, 15:12:16)
    3. Kai - will send email to csit-dev with the current status and proposed next steps, goal is to have a full clarity of where this is before we ship 23.03 (mackonstan, 15:13:08)
    4. correction: 23.02 not 23.03 (mackonstan, 15:13:29)

  5. Scale tests API optimization (mackonstan, 15:13:48)
    1. Vratko - latest changes merged, code is faster than before, and execution time is stable. (mackonstan, 15:14:55)
    2. Vratko - next step is to watch both trending results and rc1 results to see if any issues. (mackonstan, 15:15:26)

  6. VPP ip reassembly perf tests (mackonstan, 15:15:59)
    1. Vratko - not ready for rc1 (mackonstan, 15:16:08)
    2. Vratko - but some required improvements, namely jumbo tests, may be ready - will send summary to csit-dev (mackonstan, 15:17:25)

  7. wireguard 10k tunnels (mackonstan, 15:18:13)
    1. Kai - patch inside vpp waiting for review - yulong - fan already reviewed the patch. once reviewed and merged, and then wireguard 10k tunnels tests are unblocked. (mackonstan, 15:19:09)
    2. Andrew - as a bug fixes it should be addressed asap before rc2 milestone (mackonstan, 15:19:27)

  8. Release CSIT-2302 (mackonstan, 15:21:03)
    1. Tibor - will be pulling the branch tomorrow once vpp rc1 artifacts are published (mackonstan, 15:21:29)
    2. Tibor, Maciek - inspect current job specs and verify that any updates are applied before doing rc1 tests incl. dpdk mlx, hoststack set, gtpu, wireguard. (mackonstan, 15:23:47)
    3. Tibor, Maciek - send update to csit-dev with what's tested in rc1. (mackonstan, 15:25:49)
    4. Kai - to take care of job specs - gtpu, wireguard. (mackonstan, 15:26:38)
    5. Tibor, Maciek - to take care of job specs - dpdk mlx, all hoststack. (mackonstan, 15:27:54)
    6. csit.fd.io telemetry - Tibor - working on reading telemetry data - issues with big memory consumption, addressing those, still on target to ship in 23.02 timeframe, "confidence level 80%" :^) (mackonstan, 15:29:32)
    7. Tibor - not aware of any changes in CSIT environment, so no need to retest vpp v22.10 in CSIT-2302 for current vs previous comparion, unless anybody comes up with a valid reason why this would need to be retested now. (mackonstan, 15:31:33)
    8. Juraj - asking if (deprecated from kernel) isolcpu got addressed, Peter confirmed it has not been addressed, need to do it in the next rls cycle. (mackonstan, 15:34:30)

  9. Physical Infrastructure (mackonstan, 15:34:57)
    1. mackonstan - mlx 8x cx6 and 24x cx7 nic cards arrived to FD.io labs, will be going into mainly SPR servers, some cx6 will be going into ICX servers. (mackonstan, 15:36:21)
    2. question to Juraj - confirm which mlx cards should go into Ampere servers (mackonstan, 15:37:15)

  10. Virtual Infrastructure, CI/CD (mackonstan, 15:37:46)
  11. Trending and Test Failures (mackonstan, 15:38:34)
    1. mackonstan - re Hoststack tests - live meeting tomorrow - vpp-dev Dave, Florin, Filip Tehlar; csit-dev: Peter, Tibor, Viliam, Maciek (mackonstan, 15:39:21)
    2. Viliam - CSIT Test Failures Summary and Status (mackonstan, 15:40:23)
    3. Viliam - dpdk tests fixed on all testbeds except 2n-zn2 because it was down (HDD dead), but should be back now (mackonstan, 15:41:19)
    4. Viliam - correction dpdk tests on 2n-zn2 should be working now, will know after the next weekly trending testing cycle this weekend (mackonstan, 15:42:42)


Meeting ended at 15:43:23 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan (42)
  2. collab-meetbot` (9)
  3. jlinkes (1)
  4. vrpolak (1)
  5. tifrank (0)
  6. viliamluc (0)


Generated by MeetBot 0.1.4.