#fdio-meeting: FD.io CSIT project meeting
Meeting started by mackonstan at 15:03:23 UTC
(full logs).
Meeting summary
-
- Tibor Frank (tifrank,
15:03:56)
- mackonstan (mackonstan,
15:05:39)
- Vratko Polak. (vrpolak,
15:06:06)
- Agenda bashing (mackonstan, 15:06:20)
- Peter - work in progress re Georgii's request
for job_specs conversion into robot, but Georgii is away from office
this week (mackonstan,
15:08:32)
- Inputs from projects - VPP (mackonstan, 15:08:59)
- Tibor - didn't hear from Andrew re rc2
status (mackonstan,
15:09:14)
- Tibor - confirmed rc2 artefacts are in package
cloud, pushed one hr ago (mackonstan,
15:11:21)
- Inputs from projects - TSC (mackonstan, 15:11:35)
- mackonstan - re decommissioning of old
equipment from lab, Casey confirmed that LFN team is okay with
donating stuff that is not needed and re-confirmed that TSC voting
is enough for approval. Casey emphasized that s/n records must be
update for inventory tracking purposes. (mackonstan,
15:13:02)
- Dave - LFN internships are here - proposal
window open till beginning of March 2023 (mackonstan,
15:14:24)
- E810 flow "offload" tests (mackonstan, 15:15:33)
- Kai - email conversation between Yulong and
Vratko - see email thread "[csit-dev] CSIT E810 flow offload perf
difference between Intel Lab" (mackonstan,
15:16:20)
- https://wiki.lfnetworking.org/display/LN/LFN+Mentorship+Program
(dwallacelf,
15:16:21)
- Juraj Linkeš (jlinkes,
15:16:57)
- Kai - Yulong is looking to match csit hw setup
and environment in his local labs (mackonstan,
15:17:00)
- CSIT-2302 (mackonstan, 15:17:41)
- mackonstan - added 100ge e810cq tests to
job_specs for release as they were missing - 38165: job_specs: add
e810cq 100ge tests to 2n-icx and 3n-icx |
https://gerrit.fd.io/r/c/csit/+/38165 (mackonstan,
15:20:38)
- https://gerrit.fd.io/r/c/csit/+/38165
(mackonstan,
15:20:48)
- Tibor - merged it already, the only concern is
the job duration for rls testing and for trending (mackonstan,
15:21:54)
- Tibor - hoststack tests and trending - all live
now in csit.fd.io, hover info available now, and labels on y-axis
improved (mackonstan,
15:23:09)
- Tibor - same changes applied to iterative pages
and graphs (mackonstan,
15:23:36)
- Tibor, Dave - quic tests fixed, so all
hoststack tests are now running, and displayed in csit.fd.io
(mackonstan,
15:24:18)
- Peter, Tibor - mlx5/cx5 dpdk tests also running
in trending + report, and displayed in csit.fd.io (mackonstan,
15:25:45)
- Kai - wireguard 10k tunnels - conversation with
vpp contributor(s) continues - 37764: wireguard: under-load state
determination update | https://gerrit.fd.io/r/c/vpp/+/37764
(mackonstan,
15:27:54)
- https://gerrit.fd.io/r/c/vpp/+/37764
(mackonstan,
15:28:12)
- Kai - continuing working on it, driving
agreement, but won't be able to merge in time for v23.02, but will
go into master and once there, Yulong will push a csit patch for
test coveragfe (mackonstan,
15:29:42)
- Kai - Yulong has currently a private patch
covering that (mackonstan,
15:31:12)
- Tibor, Peter - telemetry working now, so far no
issues (planning memory optimizations for backend, frontend pretty
much done for now) (mackonstan,
15:32:44)
- Kai - re gtpu, wireguard job_specs updates for
v23.02 - will check with Yulong and send update over email
(mackonstan,
15:35:19)
- Physical Infrastructure (mackonstan, 15:35:35)
- Peter - decommissioning process started - skx
perf testbeds and nomad machines - multi phase (mackonstan,
15:36:04)
- Peter - executing on the plan, details are in
vexxhost support tickets, links below (mackonstan,
15:37:24)
- FD.io - Infrastructure refresh, part1
(mackonstan,
15:37:31)
- https://support.vexxhost.com/hc/en-us/requests/363450
(mackonstan,
15:37:38)
- FD.io - Infrastructure refresh, part2
(mackonstan,
15:37:46)
- https://support.vexxhost.com/hc/en-us/requests/363464
(mackonstan,
15:37:53)
- mackonstan - discussing with Nvidia team re
them providing 200ge and 100ge cables with integrated
pluggables (mackonstan,
15:39:09)
- Trending and Test Failures (mackonstan, 15:40:17)
- Vratko - two new issues per wiki page: 3.1.1
csit-dpdk-perf-mrr-weekly-master-3n-snr fails due to a missing
symlink, 3.1.2 wrong MAC address on lf_2n_clx_testbed27.yaml
(mackonstan,
15:41:00)
- https://wiki.fd.io/view/CSIT/TestFailuresTracking
(mackonstan,
15:41:09)
- Vratko - CSIT code better handling MTU is not
going to make it to CSIT-2302, test failures and performance impact,
so deferred to next release cycle (mackonstan,
15:43:34)
- Vratko - fix for this should be able to make it
into the csit-2302 rls - 3.1.3 (M) 3n-alt: Tests failing until 40Ge
Interface comes up (mackonstan,
15:44:17)
- AOB (mackonstan, 15:44:57)
- Kai - Yulong just pushed two patches
(mackonstan,
15:45:18)
- Kai - 38137: Fix issue in csit hoststack test |
https://gerrit.fd.io/r/c/csit/+/38137 (mackonstan,
15:45:30)
- KAi - to trim reviewers' list to Dave and
Peter (mackonstan,
15:47:06)
- Kai - 37860: Add 1M flows test suites of VPP
IP4 and VPP IP6 | https://gerrit.fd.io/r/c/csit/+/37860 (mackonstan,
15:47:28)
- KAi - to trim reviewers' list to Dave and
Peter (mackonstan,
15:47:37)
- Juraj - re new mlx NICs - need to confirm which
models are getting allocated - consultation over email - clear
preference for cx6, as no cx7 available in arm labs, so if any
issues, no way to fix them (mackonstan,
15:50:16)
Meeting ended at 15:50:18 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (49)
- collab-meetbot` (9)
- tifrank (1)
- dwallacelf (1)
- jlinkes (1)
- vrpolak (1)
Generated by MeetBot 0.1.4.